Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ATTUNGA HEIGHTS PRELIMINARY EMP 2.1.10 Storage and Handling of Hazardous Substances Management Plan Issues Objectives Hazardous substances are potentially dangerous to the environment if not stored and handled correctly. Spills, vapours, fires and explosions can cause environmental damage if not contained. Ensure that hazardous substances are stored and handled correctly and do not cause environmental damage. Target 21.101 The storage and handling of hazardous products onsite do not pose a threat to the environment or nearby residences Implementation Strategy Performance Indicators Minimise the storage of hazardous products onsite. No spills, leaks, explosions or fires occur from the storage and handling All hazardous products are stored in approved containers and storage facilities so as remove the of hazardous products onsite. possibility of environmental damage through spill, fumes, explosions and fires. Containers and facilities are checked regularly for deterioration. Staff handling hazardous products have been appropriately trained. Management Procedures Particular Responsibilities Corrective Action Minimise the storage of hazardous products by importing it to site on an “as required” basis. All hazardous products onsite are to be stored in approved containers and facilities. All storage facilities will have concrete bund walls sufficient to contain any spillage. All storage containers and facilities are to be inspected and maintained regularly or as required. Contractor — Ensure that hazardous products are imported to the site in a planned manner and on an “as required” basis. Ensure staff and sub-contractors are appropriately trained to handle hazardous substances. Report all incidents to the Environmental Auditor and record details. Ensure any spill is immediately contained and appropriate clean up is undertaken. Preliminary EMP: Attunga Heights Issue: 1 Chenoweth EPLA Revision: 0 12/12/2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.