Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ATTUNGA HEIGHTS PRELIMINARY EMP Particular Responsibilities Contractor — Establish a complaints recording procedure and notify neighbours, including advance notice of proposed noisy activities such as mulching; control trucking and other sub-contractors; Meet performance indicators for noise and vibration as defined in the EMP. Implement and maintain the Noise and Vibration Management Plan. Corrective Action Works identified as causing an undue noise problem will cease immediately and the Contractor will investigate the problem and implement appropriate mitigation measures. Management procedures may need to be modified to achieve compliance (to the satisfaction of the Superintendent and Environmental Auditor). Review noise and vibration measures and modify accordingly. Preliminary EMP: Attunga Heights Issue: 1 Chenoweth EPLA Revision: 0 12/12/2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.