ATTUNGA HEIGHTS PRELIMINARY EMP

Particular Responsibilities Contractor — Establish a complaints recording procedure and notify neighbours, including advance notice of proposed noisy activities
such as mulching; control trucking and other sub-contractors; Meet performance indicators for noise and vibration as defined in the EMP.
Implement and maintain the Noise and Vibration Management Plan.

Corrective Action Works identified as causing an undue noise problem will cease immediately and the Contractor will investigate the problem and implement appropriate
mitigation measures.
Management procedures may need to be modified to achieve compliance (to the satisfaction of the Superintendent and Environmental
Auditor). Review noise and vibration measures and modify accordingly.

Preliminary EMP: Attunga Heights Issue: 1

Chenoweth EPLA Revision: 0 12/12/2007

 

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.