2.1.12 Waste EMP
Issues
Objectives
ATTUNGA HEIGHTS PRELIMINARY EMP
Site preparation and construction wastes remaining on site can be a source of contamination and present an untidy appearance,
inconsistence with high standards of environmental protection.
To maintain a clean construction site, and minimise both waste generation and on-site waste storage.
Target
Performance Indicators
Implementation Strategy
2.1121
All waste material is to be in
receptacles and locations buffered
from drainage paths, and are placed in
a neat and purposeful manner denoting
an intention to remove it from the site.
Management Procedures
Particular
Responsibilities
Corrective Action
Construction and Operational
Phase EMP
No waste is to be left outside of
teceptactes, no waste washed or
blown off-site or littering nearby
streets.
Provide suitable numbers of receptacles and empty frequently
Select and purchase materials from sources, and in quantities and in containers, which minimise waste generation. Place al! general wastes and
construction wastes in suitable on-site bins/skips/stockpiles which are regularly emptied or removed from site frequently (in covered vehicles) for
appropriate off-site disposal in accordance with State and local policies.
On-site staff and sub-contractors should receive induction in waste management and minimisation.
Maintain staff facilities so that pollutants, including wash water, are not discharged to the site and into waterways.
Contractor — Maintain regularly, empty and clean receptacles, staff facilities etc.; clean any areas used for temporary waste storage.
Respond to complaints and clean up site or empty waste receptacles accordingly, or modify waste management procedures under this
EMP (with Council approval).
Preliminary EMP: Attunga Heights Issue: 1
Chenoweth EPLA
Revision: 0 12/12/2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.