ATTUNGA HEIGHTS PRELIMINARY EMP 2.1.15 Residential Amenity Management Plan Issues Objectives 2.L.15.1 Minimise the impact of the construction phase of the development on the residential amenity of the area. 2.4.15.2 Minimise and address community concems surrounding the construction and operation of the development. 2.1.15.3 Minimise the reduction of visual amenity during the construction phase. Preliminary EMP: Attunga Heights Chenoweth EPLA Building heights and locations have been designed in accordance with approval conditions which limit visual impacts. Nevertheless, the development may cause some concems among residents in the area regarding disruptions to their lifestyle and the amenity of their surroundings. During the Construction and Operational phases of the development issues such as noise, dust, vibration, visual amenity and environmental degradation may impact on the lifestyle and liveability of the area for tocal residents and visitors. Construction and operation of the development has minimal impact on the lifestyles and liveability of the local resident s and visitors. Residents are regularly consulted regarding construction and operation of the development to minimise misunderstandings and to gain a feeling of trust from the community. Implementation Strategy Implement all elements of the EMP and other management plans. Develop strategies to ensure open communication channels with the community. e Erect appropriate signage along the public path to notify people of the proposed. development and apologise for any inconvenience during construction. Signage is to have a contact number for resident enquiries. Maintain a reputation of a good corporate citizen. Implement the Construction Management Plan. Storage facilities and equipment stored onsite should have minimal visibility from the public pathway and Alma Way when works are not in progress. The site should be kept neat and tidy. Rubbish should be removed regularly and not allowed to pile up. Issue: 1 Revision: 0 12/12/2007 Performance Indicators Delivery of all Performance indicators in the EMP and other management plans. Erection of signage. Relations with the community remain generally positive, Minimum visual impact during construction.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.