ATTUNGA HEIGHTS PRELIMINARY EMP

2.1.15 Residential Amenity Management Plan

Issues

Objectives

2.L.15.1

Minimise the impact of the
construction phase of the development
on the residential amenity of the area.

2.4.15.2

Minimise and address community
concems surrounding the construction
and operation of the development.

2.1.15.3
Minimise the reduction of visual
amenity during the construction phase.

Preliminary EMP: Attunga Heights
Chenoweth EPLA

Building heights and locations have been designed in accordance with approval conditions which limit visual impacts. Nevertheless,
the development may cause some concems among residents in the area regarding disruptions to their lifestyle and the amenity of
their surroundings. During the Construction and Operational phases of the development issues such as noise, dust, vibration, visual
amenity and environmental degradation may impact on the lifestyle and liveability of the area for tocal residents and visitors.

Construction and operation of the development has minimal impact on the lifestyles and liveability of the local resident s and

visitors.

Residents are regularly consulted regarding construction and operation of the development to minimise misunderstandings and to

gain a feeling of trust from the community.

 

Implementation Strategy
Implement all elements of the EMP and other management plans.

Develop strategies to ensure open communication channels with the community.

e Erect appropriate signage along the public path to notify people of the proposed.
development and apologise for any inconvenience during construction. Signage is to
have a contact number for resident enquiries.

Maintain a reputation of a good corporate citizen.

Implement the Construction Management Plan.

Storage facilities and equipment stored onsite should have minimal visibility from the
public pathway and Alma Way when works are not in progress.

The site should be kept neat and tidy.

Rubbish should be removed regularly and not allowed to pile up.

Issue: 1

Revision: 0 12/12/2007

Performance Indicators

Delivery of all Performance
indicators in the EMP and other
management plans.

Erection of signage.

Relations with the community remain
generally positive,

Minimum visual impact during
construction.

 

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.