ATTUNGA HEIGHTS PRELIMINARY EMP

2.1.13 Cultural Heritage Management Plan - Construction

Issues Although no items or associations of cultural significance have been recorded for the subject land, but it is possible that items of
archaeological interest and cultural value are uncovered during construction.

Objectives To reduce damage to items of cultural value and facilitate appropriate recovery.

 

Implementation Strategy Performance Indicators

2A Construction and Operational

Appropriate procedures are undertaken | No cultural heritage survey of the site has been conducted. Personnel should be instructed to immediately Phase EMP
in the event of finding actual or report the presence of items likely to be of cultural significance found during the course of the work. In Material discovered should be
suspected items of cultural significance | the event that any archaeological material be exposed during excavation work, the following Emergency reported to DNRW

Response procedure should be implemented: -

= Work in that area should be immediately suspended;
* The Contractor should report the find to the Superintendent and/or Environmental Auditor and the
following Regional Coordinator for Historic and Indigenous Cultural Heritage;
* Brian McFadyen, Southern Region Cultural Heritage Coordinator (Indigenous), Department of
Natural Resources, Mines and Water on 0734062387.

 

Preliminary EMP: Attunga Heights Issue: 1

 

Chenoweth EPLA Revision: 0 12/12/2007

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.