Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
CONTENTS 1.0 SCOPE 2.0 SITE CONTEXT 3.0 SITE SPECIFIC ENVIRONMENTAL ISSUES 4.0 AIMS, OBJECTIVES & STRATEGY 4.1 AIM 4.2 OBJECTIVES 5.0 REHABILITATION ZONES 5.1 ENVIRONMENTAL COVENANT 5.2 ZONE 1: HILLSIDE ZONE 5.2.1 Existing Condition 5.2.2 Target Community 5.2.3 Management Strategies 5.3 ZONE 2: HABITAT ENHANCEMENT ZONE 5.3.1 Existing Condition 5.3.2 Target Community 5.3.3 Management Strategies 5.4 ZONE 3: RIPARIAN ZONE 5.4.1 Existing Condition 5.4.2 Target Community 5.4.3 Management Strategies 5.5 ZONE 4: UNDERSTOREY MANAGEMENT ZONE 5.5.1 Existing Condition 5.5.2 Target Community 5.5.3 Management Strategies 5.6 ZONE 5: SHEOAK PROTECTION ZONE 5.6.1 Existing Condition 5.6.2 Target Community 5.6.3 Management Strategies 5.7 ZONE 6: INTENSIVE REHABILITATION ZONE 5.7.1 Existing Condition 5.7.2 Target Community 5.8.3 Management Strategies 5.8 SUMMARY FOR ALL REHABILITATION ZONES 6.0 WEED CONTROL 6.1 CONTROL METHODS 6.2 RECORDS Attunga Heights Rehabilitation Specification 1 coo co CO sonny woos 13 13 16 Chenoweth EPLA 078103_Rehab_12_12_07.doc Dec ‘07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.