Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Attunga Heights Rehabilitation Specification 2 7.0 REVEGETATION 17 7.1 PLANT SUPPLY 17 7.1.1 Size and health 17 7.1.2 Handling 17 7.1.3 Species and Provenance Substitutions 17 7.2 PLANT SELECTION 17 7.2.1 Species selection 17 7.3 PLANTING TECHNIQUE 18 7.3.1 Site Preparation 18 7.3.2 Planting 18 7.3.3 Mulch 18 7.3.4 Fertiliser 18 7.3.5 Water retention 19 7.3.6 Water 19 7.4 MAINTENANCE 19 7.4.1 Weed Control 19 7.4.2 Replacement Planting 19 7.4.3 Watering 19 7.4.4 Re-mulching 19 7.4.5 Timing 19 7.55 PERFORMANCE STANDARDS 20 7.5.1 Contractor 20 7.5.2 Ecology 20 8.0 MONITORING 20 Tables Table 1: Strategies for Zone 1 Table 2: Table 3: Table 4: Table 5: Table 6: Table 7: Table 8: Strategies for Zone 2 Strategies for Zone 3 Strategies for Zone 4 Strategies for Zone 5 Zone Summary. Weed control methods ....... cc eccceesssereceenecesesecseeeerecseceeeaeeessaessaseccecsersesssanenseseenees 13 Weed species onsite and contro] methods .........cccccccccseseessesetseseceeceecsensnseenseneessees 15 Attachments Attachment 1 - Quantitative Survey of Vegetative Dynamics Attachment 2 - Species palette Chenoweth EPLA 078103_Rehab_12_12_07.doc Dec ‘07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.