Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Attunga Heights Rehabilitation Specification 6 4.6 EVALUATION OF SUCCESS To ensure that the rehabilitation program is successful it will be necessary to monitor progress during initial work and throughout the 12 month on maintenance period. This will provide an opportunity to identify whether revegetation is successful, where prescribed work has not been implemented and where amendments should be made to the plan. The number, spacing, species, size and survival of plants should be monitored during the planting and establishment phase of rehabilitation. Concurrently the success of weed control should be monitored to ensure that natural regeneration and planted specimens are not adversely affected. An assessment can be made of the success of rehabilitation by comparing the diversity and natural recruitment in adjacent undisturbed systems. Chenoweth EPLA 078103_Rehab_12_12_07.doc Dec ‘07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.