Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555

of 216

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Attunga Heights Rehabilitation Specification 7

5.0 REHABILITATION ZONES

 

Six (6) broad rehabilitation zones (Figure 1) have been identified. Given ecological boundaries
are rarely fixed, rehabilitation zones have been defined without hard edges. The flexibility will
allow the rehabilitation contractor greater opportunities to manage ecotonal boundaries and
address varying intensities of weed invasion. Rehabilitation will also:

¢ Maintain and enhance visual amenity of the “green backdrop” to Noosa Heads;

e Screen existing and proposed houses;

e Protect and buffer rare and threatened species;

e Retain and protect wildlings and native seed stock;

e Provide erosion control; and

¢ Suppress weed growth.

5.1 ENVIRONMENTAL COVENANT

The environmental covenant (Figure 2) includes the wildlife corridor, the buffer to the creek and
land outside the development areas. The covenant area incorporates zones 2-6 which are all the
broad rehabilitation zones. The covenant area does not include the building intensive area.

5.2 ZONE 1: HILLSIDE ZONE

5.2.1 Existing Condition

This zone includes areas with a relatively healthy and intact native understorey overtopped by a
canopy dominated by Bribie Island Pine (Callitris columellaris). The understorey supports a
diversity of native shrubs, vines and herbaceous species. There are low to moderate levels of
weed invasion in this community, but is at risk of degradation from invasion from neighboring
areas.

5.2.2 Target Community

Given the condition of this zone it requires relatively little regeneration effort. The objective for
this area is:

To facilitate the ongoing recruitment and establishment of predominantly rainforest
species including appropriate hollow developing trees

5.2.3 Management Strategies

In order to maintain Zone | in a healthy and stable condition the management strategies outlined
in Table 1 are required.

 

Chenoweth EPLA 078103_Rehab_12_12_07.doc Dec ‘07

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.