Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Aftunga Heights Rehabilitation Specificotion 11 5.7 ZONE 6: INTENSIVE REHABILITATION ZONE 5.7.1 Existing Condition This zone located around the proposed buildings and pathways will be cleared prior to development. The canopy is currently dominated by Bribie Island Pine (Callitris columellaris). As development is proposed in a number of locations spread throughout the site, the understorey condition varies. In the weedy areas the vegetation is dominated by invasive species such as Asparagus fern (Asparagus sprengeri), Guava (Psidium guajuva) and Corky passion fruit vine (Passiflora suberosa). 5.7.2 Target Community The target community will be a rainforest assemblage. The objective for this area is: To restore rainforest species including dense understorey and ground layers following disturbance 5.8.3 Management Strategies Specific management strategies for this zone are identified in the “Landscape Package for OP Works Approval”. 5.8 SUMMARY FOR ALL REHABILITATION ZONES A summary of the objectives and management requirements for each zone is tabulated below. Table 6: Zone Summary Zone | Objective Weed Management | Planting Species Other considerations 1 To facilitate the | Prevent weed | Planting is only to | Where required the | None ongoing recruitment | invasion through | occur where | following species and establishment of | removal as triggered | significant areas of | scheduled in predominantly by visual | weeds are to be | Attachment 2 are to rainforest assessment. removed. be planted. No one including appropriate species is to make hollow —_ developing up more than 20% of trees a planting mix. 2 To establish Treat weeds | Replant rainforest | Where required the | Prior to the rainforest overstorey | according to section | canopy and } following species | establishment of and structurally | 6.0, particularly | understorey scheduled in | buildings, and other diverse ground layer asparagus fem, | elements to create a | Attachment 2 are to | infrastructure such as Asparagus sprengeri | shady habitat. be planted. No one | access roads and species is to make | footpaths, fallen logs, up more than 20% of | other habitat features a planting mix. and where feasible native leaf litter is to be transferred to the Habitat Chenoweth EPLA 078103_Rehab_12_12_07.doc Dec ‘07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.