Aftunga Heights Rehabilitation Specificotion 11

5.7 ZONE 6: INTENSIVE REHABILITATION ZONE

5.7.1 Existing Condition

This zone located around the proposed buildings and pathways will be cleared prior to
development. The canopy is currently dominated by Bribie Island Pine (Callitris columellaris).
As development is proposed in a number of locations spread throughout the site, the understorey
condition varies. In the weedy areas the vegetation is dominated by invasive species such as
Asparagus fern (Asparagus sprengeri), Guava (Psidium guajuva) and Corky passion fruit vine
(Passiflora suberosa).

5.7.2 Target Community

The target community will be a rainforest assemblage. The objective for this area is:

To restore rainforest species including dense understorey and ground layers following

disturbance

5.8.3 Management Strategies

Specific management strategies for this zone are identified in the “Landscape Package for OP
Works Approval”.

5.8 SUMMARY FOR ALL REHABILITATION ZONES

A summary of the objectives and management requirements for each zone is tabulated below.

Table 6: Zone Summary

 

 

 

 

Zone | Objective Weed Management | Planting Species Other

considerations

1 To facilitate the | Prevent weed | Planting is only to | Where required the | None
ongoing recruitment | invasion through | occur where | following species
and establishment of | removal as triggered | significant areas of | scheduled in
predominantly by visual | weeds are to be | Attachment 2 are to
rainforest assessment. removed. be planted. No one
including appropriate species is to make
hollow —_ developing up more than 20% of
trees a planting mix.

2 To establish Treat weeds | Replant rainforest | Where required the | Prior to the
rainforest overstorey | according to section | canopy and } following species | establishment of
and structurally | 6.0, particularly | understorey scheduled in | buildings, and other
diverse ground layer asparagus fem, | elements to create a | Attachment 2 are to | infrastructure such as

Asparagus sprengeri | shady habitat. be planted. No one | access roads and
species is to make | footpaths, fallen logs,
up more than 20% of | other habitat features
a planting mix. and where feasible

native leaf litter is to
be transferred to the
Habitat

 

 

 

 

 

 

 

Chenoweth EPLA

078103_Rehab_12_12_07.doc

Dec ‘07

 

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.