Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555

of 216

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Attunga Heights Rehabilitation Specification 12

 

Enhancement Zones.
This is to occur prior
to the planting of

 

 

 

these zones.
To control weeds and | Treat weeds on | Replant areas | Where required the | None
restore riparian | creek banks, taking | cleared of weeds | following species
rainforest within the | care to maintain bank | with native | scheduled in
creek corridor integrity. understorey and | Attachment 2 are to
occasional be planted. No one
overstorey elements. | species is to make
up more than 20% of
a planting mix.
To remove weeds and | Intensive weed | Planting of trees and | Where required the | Following weed
facilitate the ongoing | control. It is | understorey following species | control it may be
recruitment and | anticipated that this | elements both to | scheduled in | preferential to
establishment of | will involve chemical | restore natural | Attachment 2 are to | blanket mulch areas
predominantly treatment of broad | conditions and to | be planted. No one | to minimize
rainforest species | 27eas of weeds, in | suppress weed re- | species is to make | opportunities for
including appropriate some instances | establishment. up more than 20% of | weed re-
hollow developing followed by | Planting should be | a planting mix. establishment and to
trees brushcutting of | targeted within areas enhance aesthetics.
standing dead | where there are It is anticipated that
material. Some } canopy gaps this will be required
areas of manual | resulting in light fall in some areas
removal may be | on the forest floor. immediately abutting
warranted, however the existing
care must be taken pedestrian path,
not to destabilize the
site and provide
opportunities for
weed fe-
establishment. Great
care must be taken
to avoid any native
regeneration.
To protect and | Treat weeds present | Supplementary Where required the | None
enhance the current | taking care to protect | planting to retain the | following species
stand of casuarinas | any young Black | Integrity of the area, | scheduled in

and to eliminate the
invasive weed species

Sheoak

 

particularly to
mitigate any effects
of the pathway.

 

Attachment 2 are to
be planted. With the
exception of Black
Sheoak, no one
species is to make
up more than 20% of
a planting mix,

 

 

 

 

To restore rainforest
species including
dense —_ understorey
and ground layers
following disturbance

 

Refer to the specific management strategies identified in the “Landscape Package for OP

Works Approval”

 

 

Chenoweth EPLA

078103_Rehab_12_12_07.doc

Dec ‘07

 

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.