Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555

of 216

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
IPA schedure & part 1 table 5 tem 4
IP Reguiation suheduie é fable 2 tem 1
IP Reguiaticn schedule 1 tab’e § tem e wed nver area
Water Act 2000 section 966C
Wild Rivers Act 2005 section 43A

 

— = wey

[ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA '

1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

No
(1 Yes

IPA schedule 8 part? table z stem 1

IPA schedule 8 par 1 table 5 stems 3 and 4

IP Regulation schedule 2 table 2 items 1 and 23

Environmental Protection Act 1994. section 73AA jwild nver area)
Wild Rivers Act 2005 section 43A

 

 

 

 

WITHIN THE LIMITS OF A PORT |
1.4 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
[x] No
(1 ‘Yes
eo JP Regulation, schedule 2 table 2. items 15 and 16
[DECLARED FISH HABITAT AREA |
1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
[—x] No

O Yes - /f answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA,
schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

IP Regulation schedule 2. table 2. item 26

‘COMMUNITY INFRASTRUCTURE 7

1.6 Is any part of the premises designated for community infrastructure?
[—x] No
{1 Yes

IP Regulalion. schedule 2. table 3 item 7

 

 

[WASTE WATER MANAGEMENT ]

@ 17 Does the proposal involve the establishment or expansion of a waste water disposal system?

[x] No
LC) Yes

IP Regulation schedule 2. table 3 item 5

 

ISE CT!IO iv 4 Section 4 must be completed when the application seeks approval to carry out operational work,

 

 

‘PLANNING SCHEME ]

44 ls any of the proposed operational work assessable under a planning scheme?
()_No- Goto Question 4.2 below
Yes - Complete Part E of IDAS Application Form 1 and Questions 4.1.1 - 4.1.8 below

[STATE-CONTROLLED ROAD

=-CONTROLLED a }

 

4.1.1 Is any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?

No
[1 Yes

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.