INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
IPA schedure & part 1 table 5 tem 4
IP Reguiation suheduie é fable 2 tem 1
IP Reguiaticn schedule 1 tab’e § tem e wed nver area
Water Act 2000 section 966C
Wild Rivers Act 2005 section 43A
— = wey
[ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA '
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
No
(1 Yes
IPA schedule 8 part? table z stem 1
IPA schedule 8 par 1 table 5 stems 3 and 4
IP Regulation schedule 2 table 2 items 1 and 23
Environmental Protection Act 1994. section 73AA jwild nver area)
Wild Rivers Act 2005 section 43A
WITHIN THE LIMITS OF A PORT |
1.4 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
[x] No
(1 ‘Yes
eo JP Regulation, schedule 2 table 2. items 15 and 16
[DECLARED FISH HABITAT AREA |
1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
[—x] No
O Yes - /f answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA,
schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation schedule 2. table 2. item 26
‘COMMUNITY INFRASTRUCTURE 7
1.6 Is any part of the premises designated for community infrastructure?
[—x] No
{1 Yes
IP Regulalion. schedule 2. table 3 item 7
[WASTE WATER MANAGEMENT ]
@ 17 Does the proposal involve the establishment or expansion of a waste water disposal system?
[x] No
LC) Yes
IP Regulation schedule 2. table 3 item 5
ISE CT!IO iv 4 Section 4 must be completed when the application seeks approval to carry out operational work,
‘PLANNING SCHEME ]
44 ls any of the proposed operational work assessable under a planning scheme?
()_No- Goto Question 4.2 below
Yes - Complete Part E of IDAS Application Form 1 and Questions 4.1.1 - 4.1.8 below
[STATE-CONTROLLED ROAD
=-CONTROLLED a }
4.1.1 Is any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?
No
[1 Yes
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.