07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555

of 216

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

if no, is the proposed operational work listed in Integrated Planning Regulation 1998, schedule 5 and does it exceed
the threshold?

No
[1] Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
IP Regutaton schedule 2 tabie 2 nem 3

JP Reguiaton schedute 2 table 2 stem tb,

D SULFATE SOILS ~ —

 

. i eee Lee oe 4
4.1.2 |s any of the operational work proposed in a local government area listed? in State Planning Policy 2/02: Planning and

Managing Development Involving Acid Sulfate Soils?

No
([] Yes

Spurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cairns, Calliope, Caloundra, Cardwelt, Carpentaria, Cook, Cocloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vate, Momington, Noosa, Pine Rivers,
Reddiffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

IP Regulation, schedule 2, table 3. tem 4

State Planning Policy 2/02. Planning and Managing Development involving Acid Sulfate Souls section 3.6

(EASEMENTS AND SUBSTATIONS ‘

4.1.3 Is any of the proposed operational work for filling or excavation?

[No

{x] Yes
If yes, is the filling and excavation associated with reconfiguring a lot?
CO Yes

No - Answer both (a} and (b) below

(a) Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under
the Electricity Act 1994?

{X] No
LC) Yes

(b) Is any of the operational work proposed to be located within 10m of a substation site under the Electricity
Act 1994?

[>x] No

L]_Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
IP Reguiation schedule 2, table 3 item 10a)
IP Regulation schedule 2. table 3. tem 10(b)

4.1.4 |s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the

Petroteum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
No
L] Yes

IP Regulation schedule 2, table 3 item 17

PUBLIC PASSENGER TRANSPORT

4.1.5 Is any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the

specified threshold?
No

[1 Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Regulation schedule 2 table 3 tem 14

 

‘RAILWAY SAFETY AND EFFICENCY .
4.1.6 Is any of the proposed operational work listed in schedule 13D of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No
Ol Yes - This application must be referred to QueensiandTransport (QT) as Concurrence Agency.
IP Regulation. schedule 2 table 3 item 15

 

1.

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.