Skip to the record
Accept no substitutions.

Council archive · source document

07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555

of 216

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Lene hernamenal beeen

Lead

 

Bushfire Management Plan Lot 27 RP 89506

 

 

 

Table 2 — Monthly Rainfall Averages for Tewantin

 

 

 

PARAMETER MEAN MONTHLY MEAN NUMBER
RAINFALL (mm) OF RAIN DAYS
January 216.8 12.1
February 234.5 13.7
March 236.3 14.8
April 176.0 11.9
May 152.1 41.1
June 112.4 8.5
July 85.9 7A
August 53.3 6.6
September 64.0 6.8
October 91.4 8.1
November 116.8 9.4
December 155.2 10.5
ANNUAL 1694.7 120.7

 

 

 

The rainfall distribution is seasonal. Dominant rainfall is usually in the summer season
when more than 65% of the average annual rainfall is received. During the summer
rainfall intensities are high, with rainfail reaching a peak during February and March. The
driest months are usually July, August and September.

The micro climate for Attunga Heights can differ from that recorded at Tewantin. Moreover,
the monthly rainfall averages do not reflect the variations which occur between different
years. Nevertheless, they give a general picture of the prevailing climate.

These tables confirm the difficulty the subject land and surrounding area has in generating
sustained bad fire conditions because even in August, September and October, there are
6-8 days of rain each month. This makes cured fuel difficult to develop and as such the
potential for a high intensity fire is low.

As previously stated, history shows that bad weather and seasons wilt occur in the once
every 10-12 year category and then usually for short duration (1-2 days). This means that
when a dry spring and summer presents itself, extra care is needed.

5

THE CONSULTANCY BUREAU
03-099 Bushfire Management Plan Commercial In Confidence

 

 

 

 

 

 

Page 9

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.