Skip to the record
The only place to find full transcripts.

Council archive · source document

07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555

of 216

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

oo | S| to La Cd Ed seme) | ae | ne co co Conan Lanne

 

 

Bushfire Management Plan Lot 27 RP 89506

 

4.2 Ignition Sources

Australia has a history of fires being started by natural causes such as storms (lightning)
and this has been well documented. However since European settlement most bushfires
are started by people especially where people use the roads and tracks inside bushland .
systems and the vegetation is capable of carrying fires.

Extensive public awareness programs, e.g. “Smokey Bear’ have had a major impact in
lowering fire and such special efforts during periods of higher danger play a strong role in
reducing this risk of destructive bush fires occurring.

4.3 Mitigating Options

° Fuel Reduction

The one factor which renders damaging wildfires impossible is no flammable fuel to
burn. This factor is also the only natural factor which “man” can manipulate.

Fuel reduction can be achieved by physical removal (mowing of established grass) or

by mild controlled fires which consume some of the fuel under mild winter weather
conditions.

The use of controlled hazard reduction burning is not a favoured technique in heavily

populated areas or by some ecologists worried about this regular practice changing
ecosystems over time.

° Fire Breaks/Roads/Tracks

All of these activities provide access for management and the separation of fuels.

There is an existing concrete walkway along the entire western boundary of the
development. The eastern area will enjoy a road system from the adjoining Bayview
Noosa development as well as access for the development itself.

5

THE CONSULTANCY BUREAU
03-099 Bushfire Management Plan Commercial In Confidence

 

 

 

 

 

 

Page 10

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.