INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
45 Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with artesian water?
[k] No
oO Yes - (Complete Part K,) This application requires assessment by the Department of Natural Resources and Water (NRW). if NRW is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule & pat 1 table 4 tem 3{b}
IP Regulation schedule 2 table 2. item 8
JP Regulation: schevule 1 part 3 lable 4 tem 3
Wid Rivers code jNote the code does riot currently contain apphrabie provisions for taking or nterferng with artesian water)
46 ls any of the proposed operational work to allow, under the Water Act 2000, for taking overland flow water?
No
(LJ Yes - Answer (a) and (b) below
IPA. schedule 8. part 1. table 4. item 3(ciji)
IP Regulation. schedule 2. table 2. item 8
IP Regulation, schedule 1, part 3, table 4 tem 3
Water Act 2000, section 966A (wild nver area)
Wild Rivers Act 2005 section 43A
47 1s any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?
[x] No
(1 Yes
IPA schedule 8 part 1. table 4, lem 3(c){ti)
IP Regulation schedule 2, table 2, item 8
IP Regulation, schedule 1. part 3. table 4. item 3
Water Act 2000. section 966A (wild river area}(Note no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Note’ the code does not currently contain applicable provisions for sub artesian water)
48 Is any of the proposed operational work to allow, under the Water Act 2000, for interfering with overland flow water?
No
(1 Yes - Answer both (a) and (b) below
IPA, schedule 8. pant 1 table 4 items 3(c){i; and 3(a)
IP Regulation schedule 2. table 2 tem 9
JP Regulation schedule 1. part 3. table 4. dem 3A
Water Act 2000, section 9668 (wild river area)
49 Is the proposed operational work for the following?
For the construction of a referable dam as defined under the Water Act 2000 [x] No CI Yes
* To increase the storage capacity of a referable dam by more than 10% —] No 0 Yes
if yes to either or both - (Complete Part Ks) This application requires assessment by the Department of Natural Resources and Water (NRW).
If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA schedule 8. part 1, table 4 wem 4
IP Regulation. Scheuule 2. table 2 stem 10
4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
No
(LJ Yes - Answer (a) and (b) below
IPA, schedule 8 part 1 lable 4 item 5
IP Regufalion schedule 2 table 2. tems 12 14 and 17
IP Regutation schedule 1 part 3 table 4 dems 4A and 5
Coastal Protection and Management Act 1995. section 1044 (wild mer areal
‘COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA
4.11 Is any of the operational work proposed to be carried out within a coastal management district?
No
LJ Yes
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.