Skip to the record
Beware of cheap imitations.

Council archive · source document

07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555

of 216

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

IPA schedue & pant t table 4 dem

IP Reguiation schedule 2. table 2 items 12 and 14

IP Reguiatun schedule 1 part d tabled tems 4A ana §

Coastai Protects: and Managemer:t Act 1995 Act 1995. secton 104A .w:'d nver area,
Wid Rivers Act 2005 section 43A

 

 

WATERWAY BARRIER WORKS; WILD ) RIVER AREA

 

4.12 !s any of the proposed operational work for constructing or raising | waterway barrier works under the Fisheries Act 19947

[x] No
( Yes

JPA scnecuie 8 part 1 table 4 sem 6

JPA schedue 8 par 2 lable 4 tem 2

JP Regulation schedule 2, fable 2, item 28

IP Regulation schedule 1, part 3 table 4 dem 6
Fishenes Act 1994, section 76D (wild river area)
Wild Rivers Act 2005, section 43A

 

‘DECLARED FISH HABITAT AREA; WILD RIVER AREA

4.13 |s any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?

 

IPA. schedule 8, part 1, table 4, item 7

IPA, schedule 8, part 2, lable 4, item 3

IP Regulation, schedule 2 table 2. item 25

IP Regulation schedule 1, part 3. table 4 tem 7
Wid Rivers Act 2005, sections 43A

Fishenes Act section 76DC (wild river area)

 

 

 

REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA

4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 19949

(X] No
CL) Yes

IPA, schedule 8, part 1, table 4, item 8

IPA, schedtie 8, part 2, lable 4. item 4

IP Regulation, schedule 2, table 2 item 29

IP Regulation schedule 1, part 3, table 4, item &
Fisheries Act 1994 section 76DA {wild river area)
Wilt Rivers Act 2005, section 434

 

 

 

 

[WILD RIVER AREA

4.15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
No
LJ Yes

IPA schedule 8. part 1 table 4, lem 10
IP Regulation schedule 2. table 2 item 37
Wild Rivers Act 2005 sections 42 43A

 

 

[STATE-CONTROLLED ROAD

4.16 Is any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?
No
LJ Yes

IP Regulation schedule 2. table 2 item 3

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.