Skip to the record
Accept no substitutions.

Council archive · source document

07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555

of 216

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

60.

-12-

59.2.8. dissolved oxygen.

59.3. During the establishment and operation phases, water quality monitoring shall be
undertaken every third month and monitoring after significant rainfall events (at least two
per year) shall be undertaken for:

59.3.1. total nitrogen,

59.3.2. total phosphorous,

§9.3.3. suspended solids and turbidity,
59.3.4. pH,

59.3.5. salinity,

59.3.6. temperature,

59.3.7. dissolved oxygen,

§9.3.8. trash and gross pollutants, and
59.3.9. faecal coliforms.

59.4. The applicant shall continue this water quality monitoring for a period of 3 years from
completion of the final stage of construction.

In addition, the applicant shall undertake inspections for erosion and deposition, the build-
up of trash and gross pollutants, and other water pollution. These inspections will be
carried out every third month as well as after significant rainfall events, for a period of 3
years from completion of the final stage of construction.

59.5. An operational phase Water Quality Management Plan shail be prepared to the
reasonable satisfaction of Council and address water quality performance targets, water
treatment devices, water quality maintenance, requirements for stormwater management
measutes and devices. The plan shall demonstrate compliance with the prescribed water
quality objectives.

59.6. Responsibilities under the Stormwater and Water Quality Management Plan shall be
clearly delineated.

59.7. Non-compliance with prescribed water quality standards will trigger the implementation of
measures to rectify the problem(s).

Reports on monitoring, incidents, corrective action and plan updates shall be submitted to
Council every month during construction with Council being notified if any incident is recorded.
These reports shall include information collected during the monthly monitoring program, shall
highlight any non-standard results, and be submitted in a form acceptable to Council. The
format and content of these reports shall be In hard copy and digital form, generally in
accordance with the following:

60.1. including tables of the monitoring results (digital form should be in Excel),

60.2. include individual charts plotting the results for all parameters required in the monitoring
(digital form should be in Excel); and

60.3. include a brief written discussion of the results and recommend any necessary actions.

After completion of the construction stage of the development, these reports shall continue
every three (3) months for a period of two (2) years.

Water Quality Devices

61.

Water quality contro! devices shall be installed generally in accordance with the Stormwater and
Water Quality Management Plan. Detailed staging plans and specifications, based on and
generally in accordance with the Plan shall be prepared and submitted (after consultation with
officers of the Council) with the relevant applications for operational works.

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.