-13- Drainage Works 62. 63. The applicant shall complete the drainage works progressively in conjunction with development of the site and generally in accordance with the approved Stormwater and Water Quality Management Plan. Detailed drainage plans and specifications, based on and generally in accordance with the approved Drainage Plan, the EMP and these Conditions, shall be prepared and submitted (after consultation with officers of the Council) with the relevant applications for operational works. All drainage works as required by the Drainage Plan shall be provided by the applicant at their own cost Roadworks Contributions 64. A roadworks contribution of $19,045 towards the upgrading of the local traffic area of Noosa Hill shall be paid to the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from March 2005 until the date of payment. The money will be used to assist Council with the cost of intersection improvements at Viewland Drive/ Noosa Drive and the addition of traffic calming devices along Nairana Rest and the Quarter Deck. Vehicle Access 65. 66. Vehicular access driveways from Alma Way to serve the units shall be a minimum width of 5.5 metres. Plans and cross-sections of the proposed driveways shall be submitted prior to approval of a development application for Operational Works. These drawings will demonstrate that the driveways are designed to Council's design standards and AS2890.1 at grades that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath without any level difference. : Vehicle Access Easeme! 67, Avehicle access easement shall be created over Alma way to service the units. In this regard, plans submitted for Operational Works approval shall accurately show the location of the easement. A duly executed copy of the easement shall be submitted to Council for perusal prior to the use commencing. Carparking Off Street 68. The carparking area shall be designed to comply with the provisions of AS 2890. 1-2004 for user class 1A with allowance for vehicles to enter and leave the site in a forward gear and with a minimum head clearance (headroom) at any point of 2.2m. The design shall consider the requirements of Conditions 2 and 3. 69. A minimum of 39 carpark spaces and 3 additional motorbike/bicycle parking spaces for the Multiple Dwellings, and 10 carpark spaces in tandem shall be provided for the Lodge with 2 bicycle spaces. 70. Car parking arrangements at the Accommodation Building (Lodge) may be in tandem. All other spaces shall comply with the requirements of AS2890.1-2004. Tratfic Management for Morwong Drive and Viewland Drive (30 Dwelling Units) 71, a) Access is to be via Viewland Drive from 7:00 am to 7:30 pm and from Morwong Drive from 7:00 pm to 7:30 am. b} Owners and guests are to be informed of the site access arrangements. c) Local taxi companies are to be informed of the access arrangements on site. d) in conjunction with the developer / owner of Lot 106 on SP 151406 (the Viridian Site), the Developer is to provide sufficient information at the Morwong Drive entrance and at the Viewland Drive entrance to Alma Way to enable a person seeking vehicular access to the multiple dwellings to locate the alternative access if the access initially chosen by the person is closed.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.