Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
-17- Water Supply $150,085 Sewerage $113,401 TOTAL $263,486 All headworks contributions must be paid prior to the issue of a Development Permit for Operational Works. Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full. In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled, the contribution or trading bank guarantee will be returned. Earthworks 108. 109. 110. All earthworks carried out on site for construction activities shall be undertaken in accordance with the “Geotechnical Investigation: Proposed Housing Development — 26 Attunga Heights, Noosa Heads, Queensland” dated November 2003 and the further report dated 7 July 2004. The applicant shall ensure the building designs and the type of foundation system(s) are certified by a Geotechnical Engineer or similar qualified expert. This information shall be submitted to the Council prior to obtaining a Development Permit for Operational Works. In the sand dune area, unsupported temporary excavations are not to exceed 1.0 metres in height and are to be formed no steeper that 30 degrees. General 441. 112. 113. Prior to undertaking any excavation, the applicant must ensure that any the person acting on this permit shall contact public utility service providers to ascertain the location of their underground services. The applicant must ensure that any person acting on this permit applies for and obtains ali other necessary permits including crane permits, toad opening permits, hoarding permits, footpath occupation permits and/or any other approvals required under any other Act or local law. Prior to commencement of work relating to a Development Permit for Operational Works, the Applicant shall sign a written undertaking to be responsible for the full cost of repairs to road pavement, footpath, kerb and gutter, or other Council property damaged as a result of construction of the proposed development. The applicant must ensure that if any person acting under this permit damages any Council property or facilities (such as underground drainage, water supply and sewerage), through any cause whatsoever in the course of, directly or indirectly carrying out development, that person notifies the Manager - Land Development of the Council and rectifies the damage at its cost and to the satisfaction of the Manager - Land Development of the Council. Alternatively, the Applicant may request the Council to carry out the rectification works, at the applicant's cost Any damage to a water main shall be rectified by Council, at the applicant's cost. Any damage to a sewer main shall be undertaken by either Council or a Council approved contractor, at the applicant's cost. In all cases, Council reserves the right to carry out rectification works in an emergency and where no reasonable attempt has been made to complete the rectification works as part of the development. All costs incurred by Council in any rectification works shall be repaid to Council prior to the endorsement of the Plan of Survey. Building 414. The Geotechnical report submitted as part of the application has been appraised and approved subject to the following conditions:- 114.1. There is to be no uncontrolled discharge of water onto the slope; 114.2.Stripping of vegetation for construction purposes should be minimised. If vegetation is destroyed it should be reinstated immediately after construction is completed;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.