07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555

of 216

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

-18-

414.3. Additional load due to fill, construction equipment or stockpiled materials should not be
located on the dune slope;

114.4. The use of vibratory equipment of any kind is not permitted to be used, including vibrating
rollers, the use of vibrating installation techniques for sheet piling and other construction
vibrations caused by excavating, earthmoving or demolition machinery or other similar
construction techniques;

414.5. The construction management plan is to be adhered to;

114.6.Copies of all inspection reports by engineers are to be submitted to Council within §
business days of the inspection taking place;

114.7.Boundary wall movement shall be monitored throughout construction by a Registered
Professional Engineer of Queensland (RPEQ) and if movement occurs construction Is to
be stopped immediately and appropriate action is to be taken to arrest the movement.
Further work shall only take place after a re-assessment of the conditions on site,

114,.8.A RPEQ is to be engaged by the client to oversee the piling works and copies of all
inspection reports are to be submitted to Council within 5 business days of the inspection
taking place;

114.9. The applicant's Geotechnical engineer will be required to be on site for the whole of the
time during any excavation. The construction of the whole of the foundations Is to be
supervised and directed on site by a consulting Geotechnical engineer. No work of any
such kind relating to the foundations shall be carried out if a geotechnical engineer is not
on the site and supervising and directing this work. Such works shall only be carried out
during dry weather conditions and if there is a risk of sand movement occurring, all work
shall be suspended until such steps, approved by the applicant's Geotechnical engineer
and the Council's Building Surveyor, have been taken to ensure that no further slippage
will result.

Environmental Health

115.

116.

117.

An annual licence and registration of the premises is required under the Food Hygiene
Regulation 1989 from Council's Environmental Health Section for the guest house kitchen.

Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or
located in a manner which prevents a noise nuisance beyond the subject land in accordance
with the environmental nuisance provisions of the Environmental Protection Regulation 1998.
On the spot fines may apply for such offences.

Noise emission from air conditioning equipment shall comply with the following requirements:

117.1. The equipment shall be installed and located in a manner which prevents noise nuisance
beyond the subject land in accordance with the nuisance provisions of the Environmental
Protection Regulation 1998 and Council's Local Law No. 12 - Control of Nuisances.
Infringement Notices (on-the-spot fines) may apply for offences.

117.2.Submission of written certification from a suitably qualified person confirming that the
noise levels comply when measured at the nearest residential boundary. This is required
immediately after installation of the equipment and prior to any occupation of the building,
and in a format approved by Council.

417.3. Subject to the Environmental Protection Regulation 1989, the applicant must ensure that
equipment is not used on any day if it makes or causes noise to be made —

417.3.1. Before 7am or after 10pm: More than the lower of either —
© 40 d(B)A
« 3.d(B)A above the background noise level
417.3.2. From 7am to 7pm: More than the lower of either —
« 50 d(B)A
© 5 d(B)A above the background noise level
117.3.3. From 7pm to 10pm: More than 3 d(B)A above the background noise level.

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.