418.

119.

120.

121.

122.

423.

124,

-19-

The beauty treatment room shall not perform skin penetration operations unless an approval is
obtained under the Public Health (Infection Control for Personal Appearances Services) Act
2003.

The developer must provide screened imperviously paved areas large enough for all refuse and
recycling bins throughout the development. Suitably designed wash down areas are required
with cold-water tap, hose and drain outlet connected to sewer for the cleaning of bins and the
refuse transport trailer. The drain outlet is to be designed to prevent stormwater entry to the
sewerage system. The storage areas shall be setback a minimum of 10 metres from the high
bank of the creek.

A plan of the service area for waste bins along Alma Way and storage location of the waste
collection vehicle is required to be submitted for assessment with the application for a
Development Permit for Operational Works. This service area shall be setback a minimum of
40 metres from the high bank of the creek.

A Trade Waste Permit is required to discharge each type of Trade Waste. The hydraulic
drawings are to show all the Trade Waste requirements in accordance with the Noosa Trade
Waste Policy.

The bin washing area is to be roofed and the floor is to fall to a bucket trap with the waste pre-
treated by a grease arrestor prior to discharge to the sewer. Rain water is to be excluded from
the bin washing area. Bin washing is to take place only at the bin washing area.

Full truck access is to be provided to each grease arrestor and/or pre-treatment device for
cleaning and servicing. Where access is restricted, a pump out line is required.

A nominated car wash down area is to be provided showing adequate pretreatment of trade
waste.

Contaminated Land

Lona

125.

At all times white the subject land is on the Environmental Management Register (EMR) the
applicant must comply with the approved Site Management Plan (SMP) for Lot 1 on RP 136508
issued under the Environmental Protection Act 1994 by the Environmental Protection Agency
(Contaminated Land Unit).

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.