Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Phase Applicability S13 No Description c 3 5 Report Compliance Comments zB 3 s Reference % & 6 a/ 2/8 5 a 8 |o° 20 |There shall be no substantial detrimental effect upon the amenity Various - refer to of the neighbourhood, including the Viridian Development, by specific reports reason of the creation of excessive noise, lighting nuisance or other emissions by or from the Development, including that caused by cars accessing either along Alma Way or manoeuvring within the development. Noise 21a |a) Swimming pools (if any) are to be used only between 7:00am Nil Requires Building and 9:00 pm daily. Approval - Not subject to Operational works 21b |b) Swimming pool or spa pumps are to be contained in an To be added to Requires Building acoustically treated enclosure or located in a manner that Architect's drawings Approval - Not subject to} prevents a noise nuisance beyond the Site in accordance with the Operational works nuisance provisions of the Environmental Protection Regulation 1998. 21c |c) The applicant must ensure that no builder or building Construction contractor carries out building work on a building site in a way Management Plan that makes or causes audible noise to be made from the building See 4.4 wark on:- 21ci |i) Monday to Saturday, before 7:00am or after 6:30pm; and Construction Management Plan See 4.4 21cii ii) Sunday or public holiday, at any time. Construction Management Plan See 4.4 Lighting 22a a) The level of illumination, at a distance of 1.5 metres outside the To be added to Requires Building boundary of the Site, resulting from direct, reflected or other Architect's drawings Approval - Not subject to incidental light emanating from the Site shall not exceed eight lux Operational works measured at any level upwards from ground level. 22b |b) Lighting is to be directed downwards so as to minimise any ‘To be added to Requires Building adverse effects of glare or direct light nuisance on all adjacent Architect's drawings Approval - Not subject to allotments (including Lot 106 on SP 151408- the Viridian Operational works development), but must achieve a minimum level of illumination consistent with the safety of pedestrians and vehicles. 22c |c) Lighting to any walkways, where required, is to be low level To be added to Requires Building bollard type lighting, down lighting or foot lights that achieve the Architect's drawings Approval - Not subject to minimum of illumination and light spillage consistent with safety Operational works for pedestrians and vehicles, Buildings and Other Structures 23a |26. a) The colours of the buildings should be muted tones of To be added to Requires Building browns, greens, ochres, blues and greys selected from a suitable Architect's drawings Approval - Not subject to colour palette. Operational works 23b }b) The project is not to be staged (other than the Lodge To be added to Requires Building component in Attunga Heights. Architect's drawings Approval - Not subject to Operational works 23c_ |c) Air conditioning units for the dwellings/cabins shall be located To be added to Requires Buitding so as to not face the Viridian development where the dwellings / Architect's drawings Approval - Not subject to cabins are located east of the creek and adjacent to the eastern Operational works shared boundary with the Viridian development. 23d jd) Any spoil from construction activities to be removed from the Construction site shall be by means other than through Lot 106 on SP 151408 (except that such removal shall be allowed whilst construction activity is under way on Lot 106 — the Viridian development). Management Plan See 3.1 FAPROJECTS 2007\07B217 - Attunga Heights Development Approval (mwg)\06B217 - 071205 - prk - Condition compliance matrix.ds 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.