Phase

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Applicability
S13
No Description c 3 5 Report Compliance Comments
zB 3 s Reference
% & 6
a/ 2/8
5 a
8 |o°
20 |There shall be no substantial detrimental effect upon the amenity Various - refer to
of the neighbourhood, including the Viridian Development, by specific reports
reason of the creation of excessive noise, lighting nuisance or
other emissions by or from the Development, including that
caused by cars accessing either along Alma Way or manoeuvring
within the development.
Noise
21a |a) Swimming pools (if any) are to be used only between 7:00am Nil Requires Building
and 9:00 pm daily. Approval - Not subject to
Operational works
21b |b) Swimming pool or spa pumps are to be contained in an To be added to Requires Building
acoustically treated enclosure or located in a manner that Architect's drawings Approval - Not subject to}
prevents a noise nuisance beyond the Site in accordance with the Operational works
nuisance provisions of the Environmental Protection Regulation
1998.
21c |c) The applicant must ensure that no builder or building Construction
contractor carries out building work on a building site in a way Management Plan
that makes or causes audible noise to be made from the building See 4.4
wark on:-
21ci |i) Monday to Saturday, before 7:00am or after 6:30pm; and Construction
Management Plan
See 4.4
21cii ii) Sunday or public holiday, at any time. Construction
Management Plan
See 4.4
Lighting
22a a) The level of illumination, at a distance of 1.5 metres outside the To be added to Requires Building
boundary of the Site, resulting from direct, reflected or other Architect's drawings Approval - Not subject to
incidental light emanating from the Site shall not exceed eight lux Operational works
measured at any level upwards from ground level.
22b |b) Lighting is to be directed downwards so as to minimise any ‘To be added to Requires Building
adverse effects of glare or direct light nuisance on all adjacent Architect's drawings Approval - Not subject to
allotments (including Lot 106 on SP 151408- the Viridian Operational works
development), but must achieve a minimum level of illumination
consistent with the safety of pedestrians and vehicles.
22c |c) Lighting to any walkways, where required, is to be low level To be added to Requires Building
bollard type lighting, down lighting or foot lights that achieve the Architect's drawings Approval - Not subject to
minimum of illumination and light spillage consistent with safety Operational works
for pedestrians and vehicles,
Buildings and Other Structures
23a |26. a) The colours of the buildings should be muted tones of To be added to Requires Building
browns, greens, ochres, blues and greys selected from a suitable Architect's drawings Approval - Not subject to
colour palette. Operational works
23b }b) The project is not to be staged (other than the Lodge To be added to Requires Building
component in Attunga Heights. Architect's drawings Approval - Not subject to
Operational works
23c_ |c) Air conditioning units for the dwellings/cabins shall be located To be added to Requires Buitding
so as to not face the Viridian development where the dwellings / Architect's drawings Approval - Not subject to
cabins are located east of the creek and adjacent to the eastern Operational works
shared boundary with the Viridian development.
23d jd) Any spoil from construction activities to be removed from the Construction

 

site shall be by means other than through Lot 106 on SP 151408
(except that such removal shall be allowed whilst construction
activity is under way on Lot 106 — the Viridian development).

 

 

 

 

Management Plan
See 3.1

 

 

 

 

FAPROJECTS 2007\07B217 - Attunga Heights Development Approval (mwg)\06B217 - 071205 - prk - Condition compliance matrix.ds

3

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.