Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
No Description Phase Applicability Design Construction Operational Report Compliance Reference Comments 23e e) The applicant shall construct at its cost pedestrian access connections to the public pathway to be constructed on Lot 106 adjacent to Alma Way. An easement for this purpose to be agreed with the owners of Lot 106. and duly executed To be added to Architect's drawings Requires Building Approval - Not subject to Operational works 23f if} Rubbish storage areas constructed adjacent to Alma Way shall be suitably screened and there shall be an obligation to immediately return bins from their collection point after emptying. The collection area shall be maintained in a clean and tidy state. To be added to Architect's drawings Requires Building Approval - Not subject to Operational works 239 g) There shall be no roof top terraces to any of the 30 dwellings. Demonstrated on Architect's drawings Requires Building Approval - Not subject to Operational works Revegetation / Landscape / Fauna Considerations 24a a) The area adjacent to Lot 106 shall be densely landscaped in order to provide additional screening of Alma Way with such plantings to be initially of advanced stock including at a minimum 20 x 45 litre native trees adjacent the dwelling units and car parking areas. Landscape Drawings 24b b} In conjunction with the developer / owner of Lot 106 on SP 151408 -the Viridian site, the applicant will on camptetion of its works remove the dividing fence between Lots 106 and 27 so as to allow free movement of fauna except in location where retention of the fence is necessary for reasons of public safety. Landscape Drawings Management Plans 25 The Applicant shall prepare various management plans that relate| ito the design, construction and operational phases of the development. These plans are to be prepared by appropriately qualified persons and submitted to Council prior to issue of a development permit for Operational Works. The plans are to address specific matters detailed in the conditions of this approval. The plans to be submitted are: As submitted 25.1 Environmental Management Plan As submitted 25.2 Ecological Restoration Plan and Specifications As submitted 25.3 Vegetation Management Plan As submitted 25.4 Weed Management Plan As submitted 25.5 Fauna Management Plan As submitted 25.6 Fire Management Plan As submitted 25.7 Construction Management Plan (including Traffic Management Plan) As submitted 25.8 Stormwater and Water Quality Management Plan As submitted 25.9 Acid Sulphate Soils Management Plan As submitted Refer to supporting letter from Golders Fees Payable 26 The Applicant shall pay Council all reasonable costs for the assessment of the management plans and also the costs associated with ensuring the development complies with the requirements of this approval. These costs shall be limited to a maximum of $30,000 including the cost of external consultants should they be required. 27 The further approvals required to allaw development to occur shall be subject to the fees contained in Council's Fees and Charges Schedule. Council to advise Environmental Management Plan 28 An Environmental Management Plan (EMP) shall be prepared land implemented to ensure that the impact of the development on the environment is minimised and that the environmental vatues of the site are protected and enhanced. The EMP is to: Refer EMP 28.1 Comply with AS14000. Refer EMP. FAPROJECTS 2007\07B217 - Attunga Heights Development Approval (mwg)\06B217 - 071205 - prk - Condition compliance matrix.xds 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.