Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Phase
Applicability
Report Compliance
N Descripti
io escription Reference
Comments
Design
Construction
Operational
Ecological Restoration Plan and Specifications
34 |Prior to preparation of an Ecological Restoration Plan a Refer to ERP
quantitative survey shall be undertaken to identify the vegetative
dynamics of the site.
35 | An Ecological Restoration Plan and Specifications shall be Refer to ERP.
prepared for the site by a specialist restoration ecologist, and
submitted to council prior to issue of a devetopment permit for «
operational works. The applicant shall implement the Plan and
Specifications. K shall apply to all areas covered by the
Environmental Covenant as per Condition 5 and plantings
surrounding the buildings shall be included as Ecological!
restoration works and not landscaping works (except around the
Lodge where landscaping may be undertaken). it shall specify
actions and works necessary to result in robust, self-sustaining
viable plant communities and habitat. The following, shall be
addressed and included in the Plan and Specifications:
35.1 [Document the current status of the areas requiring ecological Refer to ERP
restoration in terms of structure, floristics, missing elements,
health, vigour, etc.
35.2 {Formulate structural and floristic models for the plant Refer to ERP
communities requiring ecological restoration.
35.3 |Specify the required works and actions for each area in terms of: Refer to ERP
35.3.1 | site preparation (this may include thinning, weed removal and Refer to ERP
control, etc.),
35,3,2 establishment of the missing floristic and structural elements, Refer to ERP
35.3.3 |habitat creation and reinforcement for native fauna and Refer to ERP
reinforcement of habitat linkages and corridors,
35.3.4 |creating opportunities for regeneration from the seed bed, natural Refer to ERP
recruitment and the establishment of wildlings,
35.3.5 |planting and mulching procedures, Refer ta ERP
35.3.6 | fertilizing procedures noting the low nutrient status of these Refer to ERP
ecosystems,
35,3.7 [watering procedures, Refer to ERP
35.3.8 [protection from wildfire, particularly during the establishment Refer to ERP
phase,
35.3.9 [erosion and sediment control, Refer to ERP
135.3.100n-going maintenance, Refer to ERP
35.3.1 1]environmental safeguards, and Refer to ERP.
35.4 |The Ecological Restoration Plan and Specifications shall include 7 Refer to ERP
all parts of the site where vegetation will be retained on the site.
35.5 |The Ecological Restoration Plan will exclude the areas fronting Refer to ERP
the Ladge and Attunga Heights Road as these areas will be
landscaped in accordance with Council's policy.
36 |All the relevant ecological restoration works and actions shall be Refer to ERP
undertaken by the Applicant and completed prior to
commencement of the use.
Fauna Management Plan
37. |A Fauna Management Plan (FMP) shall be prepared and Refer to FMP
implemented prior to commencement of any works on the site.
The FMP shall be submitted to council prior to issue of a
development permit for operational works.
38 |The Fauna Management Plan shall specify the numbers and Refer to FMP.
types of forage and habitat trees (particularly for Koalas and
Glossy Black Cockatoos} to be planted in the vegetation areas
outside the ‘Development Area’. Particular attention shall be paid
to the following areas:
38.1 |The State Wildlife Corridors and the use of the area as a corridor Refer to FMP
for koalas.
FAPROJECTS 2007\078217 - Attunga Heights Development Approval (mwg)\06B217 - 071205 - prk - Condition compliance matrixxs 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.