Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555

of 216

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

Phase

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Applicability
§ |B i
No Description 51 3 5 Report Compliance Comments
2 3 s Reference
3/8 |#
a < ge
§ a
Oo °
28.2 |Demonstrate a high level of environmenta! care and responsibility Refer EMP
land be consistent with best practice for developments of this type
in similar environments.
28.3 |Detail the applicant's environmental policy and the proposed Refer EMP
environmental management system for the site.
29 |The Environmental Management Plan shall specify to the Refer EMP
teasonable satisfaction of Council:
29.1 |The performance targets, including those derived from the Refer EMP
conditions and other requirements arising from legislation and
other approvals;
29.2 |How the performance targets are to be achieved: Refer EMP
29.3 |When the performance targets will be satisfied; Refer EMP
29.4 |How performance will be monitored: Refer EMP
29.5 |corrective actions and contingency measures to be undertaken; Refer EMP
29.6 |reporting arrangements (including monthly reports to Council Refer EMP
during construction),
29.7 |auditing arrangements; Refer EMP.
29.8 |how the requirements are to be incorporated into construction and Refer EMP
works contracts;
29.9 |how the developers employees, contractors and the contractor's Refer EMP
employees will be informed and trained with respect to the
environmental protection requirements;
29.10 |enforcement; Refer EMP.
30 |The Environmental Management Plan shall apply to all works and Refer EMP.
activities on all areas of the site and adjacent road reserves.
31 In particular, but without limitation, the Environmental Refer EMP
Management Ptan shall address the following issues in relation to
the construction and operational phases of the development:
31.1 [legislative compliance; Refer EMP
31.2 |vegetation protection; Refer EMP
31,3 |fauna and fauna habitat protection; Refer EMP.
31.4 |weed control; Refer EMP.
31.5 |pest control; Refer EMP.
31.6 [soil erosion and sediment control; Refer EMP
31.7 |water quality protection; Refer EMP.
31,8 [groundwater protection; Refer EMP
31.9 [air quality protection; Refer EMP
31.1 |storage and handling of hazardous substances; Refer EMP
31.11 |noise and vibration management; Refer EMP
31.12 |waste management: Refer EMP
31.13 [cultural heritage management; Refer EMP
31.14 [visual amenity protection; Refer EMP
31.15 [bushfire control; Refer EMP
31.16 |environmental emergencies: Refer EMP
31.17 [community liaison. Refer EMP.
32 |The Environmental Management Plan shall incorporate the Refer EMP
requirement for monthly environmental compliance monitoring
and audit reports to be submitted to Council for the construction
stages of the development. The format and content of these
reports shail be in hard copy and digital form, generally in
accordance with the following:
32.1 |Include tables of the monitoring results (digital form should be in Refer EMP
Excel).
32.2 |Include individual charts plotting the results for alt parameters Refer EMP
required in the monitoring.
32.3 |Include a brief written discussion of the results and recommend Refer EMP
any necessary actions
33 |The Applicant and all future owners of the site shall comply with Refer EMP

 

the retevant components of the Environmental Management Plan.
This requirement will be included in the Community Management
Statement for the units and the Lodge.

 

 

 

 

 

 

 

 

FAPROJECTS 2007\078217 - Attunga Heights Develapment Approval (mwg)\06B217 - 071205 - prk - Condition compliance matrix.xds

5

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.