Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Phase Applicability § |B i No Description 51 3 5 Report Compliance Comments 2 3 s Reference 3/8 |# a < ge § a Oo ° 28.2 |Demonstrate a high level of environmenta! care and responsibility Refer EMP land be consistent with best practice for developments of this type in similar environments. 28.3 |Detail the applicant's environmental policy and the proposed Refer EMP environmental management system for the site. 29 |The Environmental Management Plan shall specify to the Refer EMP teasonable satisfaction of Council: 29.1 |The performance targets, including those derived from the Refer EMP conditions and other requirements arising from legislation and other approvals; 29.2 |How the performance targets are to be achieved: Refer EMP 29.3 |When the performance targets will be satisfied; Refer EMP 29.4 |How performance will be monitored: Refer EMP 29.5 |corrective actions and contingency measures to be undertaken; Refer EMP 29.6 |reporting arrangements (including monthly reports to Council Refer EMP during construction), 29.7 |auditing arrangements; Refer EMP. 29.8 |how the requirements are to be incorporated into construction and Refer EMP works contracts; 29.9 |how the developers employees, contractors and the contractor's Refer EMP employees will be informed and trained with respect to the environmental protection requirements; 29.10 |enforcement; Refer EMP. 30 |The Environmental Management Plan shall apply to all works and Refer EMP. activities on all areas of the site and adjacent road reserves. 31 In particular, but without limitation, the Environmental Refer EMP Management Ptan shall address the following issues in relation to the construction and operational phases of the development: 31.1 [legislative compliance; Refer EMP 31.2 |vegetation protection; Refer EMP 31,3 |fauna and fauna habitat protection; Refer EMP. 31.4 |weed control; Refer EMP. 31.5 |pest control; Refer EMP. 31.6 [soil erosion and sediment control; Refer EMP 31.7 |water quality protection; Refer EMP. 31,8 [groundwater protection; Refer EMP 31.9 [air quality protection; Refer EMP 31.1 |storage and handling of hazardous substances; Refer EMP 31.11 |noise and vibration management; Refer EMP 31.12 |waste management: Refer EMP 31.13 [cultural heritage management; Refer EMP 31.14 [visual amenity protection; Refer EMP 31.15 [bushfire control; Refer EMP 31.16 |environmental emergencies: Refer EMP 31.17 [community liaison. Refer EMP. 32 |The Environmental Management Plan shall incorporate the Refer EMP requirement for monthly environmental compliance monitoring and audit reports to be submitted to Council for the construction stages of the development. The format and content of these reports shail be in hard copy and digital form, generally in accordance with the following: 32.1 |Include tables of the monitoring results (digital form should be in Refer EMP Excel). 32.2 |Include individual charts plotting the results for alt parameters Refer EMP required in the monitoring. 32.3 |Include a brief written discussion of the results and recommend Refer EMP any necessary actions 33 |The Applicant and all future owners of the site shall comply with Refer EMP the retevant components of the Environmental Management Plan. This requirement will be included in the Community Management Statement for the units and the Lodge. FAPROJECTS 2007\078217 - Attunga Heights Develapment Approval (mwg)\06B217 - 071205 - prk - Condition compliance matrix.xds 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.