No

Description

Phase

Applicability

 

Design

Construction

Operational

Report Compliance
Reference

Comments

 

89

All redundant vehicular crossings to the site shall be removed andj
replaced by kerb & channel, footpath paving and landscaping
such as trees and grasses in accordance with Council’s Standard
specifications prior io commencement of the use permitted by this
permit.

Nil

This application
excludes works
associated with the
lodge

 

Pathway Contributions

 

90

An estimated pathway contribution of $18,234 towards extemal
major pathways, in accordance with Pianning Scheme Policy
PSP41, shall be paid to the Council prior to obtaining a
Development Permit for Operational Works. The amount shall be
calculated in accordance with the policy current at the time of
payment and will be subject to variations in the Consumer Price
index, All Groups Brisbane from March 2005 until the date of
payment

To be lodged during
Operational works
approval process

 

Stormwater Drainage

 

91

All stormwater drainage shall be collected on site and discharged
so there is no net increase in stormwater runoff from the site.
Stormwater drainage permitted to drain from the site shall be
discharged to the existing waterway traversing the site. The
stormwater shall be discharged so as not to cause any scour or
damage to the waterway.

Refer to SMP

 

92

Roof runoff shall be directed to an approved rainwater storage
system or tank (minimum storage 2000 litres per dwelling and
8500 litres for the Lodge).

Refer to SMP

 

93

To ensure that polluted run-off dees not enter Council's
stormwater drainage system, stormwater run-off from the
carparking areas and the driveways shall have the first flush (the
Hirst 12 mm of rainfalt or hose-down) collected in a gross pollutant
trap provided on site prior to being permitted to discharge into
Council's drainage system.

Refer to SMP,
Stormwater drawings

A Humceptor STC 3 has
been provided in the
design

 

All other clean stormwater, such as roof water. shall be collected
on site and discharged through a single underground drain line
directly into the existing drainage system, bypassing the gross
pollutant trap.

Refer to SMP,
Stormwater drawings

 

To this end, a detailed maintenance plan shall be prepared for the
proposed gross pollutant trap, which shall be submitted to the
Councit for approval prior to obtaining a Development Permit for
Operational Works.

Refer to SMP

 

‘The approved maintenance plan shall be incorporated in the
Community Management Scheme for the development and a
copy of this shall be provided for Council's records prior to
commencement of the approved Use.

 

A Development Permit for Building Works shall not be granted
until a Development Permit for Operational Works has been
issued in regard to the drainage scheme.

 

94

All site stormwater drainage shall be by means of a gravity
system.

Refer to SMP,
Stormwater drawings

 

Water & Sewer Infrastructure

 

95

The applicant shall provide written evidence of approval ta
construct both the sewer connections and water connections,
through the adjacent Viridian Noosa Site, that are required to
service the proposed development.

Refer to Letter by
Viridian Landowner

 

96

The applicant shall demonstrate that the advance construction of
conduits in the adjacent Viridian Noosa Site to facilitate
connection of water and sewer to the proposed development has
been completed and correspond with the drawings to be
submitted for operational works.

Refer to Survey Plans

 

97

 

The applicant's approved contractors shall construct all water
supply and sewer lines in the adjacent Viridian Noosa Site with
due care and reinstate any and all areas disturbed to the
satisfaction of Council and Viridian Noosa.

 

 

 

 

 

Refer to Water and
Sewer Plans

 

 

FAPROJECTS 2007\07B217 - Attunga Heights Development Approval (mwg)\06B217 - 071205 - prk - Condition compliance matrix.xls

13

 

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.