07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
No
Description
Phase
Applicability
< —
2|%
&/ 3 3
= 3 =
a & oc
a o x
ao; 2]¢8
5 a
oO °
Report Compliance
Reference
Comments
{n addition to this the Applicant's Solicitor shall give Council's
Solicitor an appropriate undertaking in writing that the Title Deed
and the easement documents will be lodged at the Land Titles
Office and any additional Titles Office forms or requisitions
requiring the consent of Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to
Council for perusal prior to the use commencing.
Any changes required by Council's Solicitor must be corrected
immediately.
Headworks Contributions
107
Contributions shall be paid to Council in accordance with
Planning Scheme Policies PSP28 and PSP30 on Water Supply
Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time
of payment. An estimate only of the contribution rates under the
current policies is outlined below. These amounts will adjusted in
line with changes to the Consumer Price Index, All Groups
Brisbane from March 2005 until the date of payment.
Water Supply $150,085
Sewerage $113,401
TOTAL $263, 486
To be lodged during
Operational works
approval process
‘All headworks contributions must be paid prior to the issue of a
Development Permit for Operational Works. Alternatively a
trading bank guarantee shall be submitted to Council plus 20%.
Should the headworks contributions not be paid at the due time,
Council shall call upon the trading bank guarantee in full.
In the event that the Development Permit for Material Change of
Use of Premises lapses or is cancelled, the contribution or trading
bank guarantee will be returned.
Earthworks
108
All earthworks carried out on site for construction activities shall
be undertaken in accordance with the “Geotechnical Investigation:
Proposed Housing Development — 26 Attunga Heights, Noosa
Heads, Queensland” dated November 2003 and the further report
dated 7 July 2004,
Refer to Earthworks
drawings
109
The applicant shall ensure the building designs and the type of
foundation system(s) are certified by a Geotechnical Engineer or
similar qualified expert. This information shall be submitted to the
Council prior to obtaining a Development Permit for Operational
Works.
110
In the sand dune area, unsupported temporary excavations are
not to exceed 1.0 metres in height and are to be formed no
steeper that 30 degrees.
Refer to Earthworks
drawings
General
111
Prior to undertaking any excavation, the applicant must ensure
that any person acting on this permit shall contact public utility
service providers to ascertain the location of their underground
services.
Refer to Earthworks
drawings
12
The applicant must ensure that any person acting on this permit
applies for and obtains all other necessary permits including
crane permits, road opening permits, hoarding permits, footpath
loccupation permits and/or any other approvals required under
any other Act or Local Law
Refer to Earthworks
drawings
113
Prior to commencement of work relating to a Development Permit
for Operational Works, the Applicant shall sign a written
undertaking to be responsible for the full cost of repairs to road
pavement, footpath, kerb and gutter. or other Council property
damaged as a result of construction of the proposed
development.
F:\PROJECTS 2007\078217 - Attunga Heights Development Approval (mwg)\068217 - 071205 - prk - Condition compliance matrix.ds
15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.