Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ATTUNGA HEIGHTS PRELIMINARY EMP To protect and manage the Key Environmental Values during the construction and operational phases, the following elements are required to be addressed in the EMP: Vegetation Management Plan; Fauna Management Plan; Weed and Pest Management Plan; Stormwater and Water Quality Management Plan Erosion & Sediment Control Management Plan; Waste Management Plan; Bushfire Management Plan; Ground Water Protection Management Plan; Noise & Vibration Management Plan; Air Quality and Dust Management Plan Storage and Handling of Hazardous Substances; and Emergency Response Management Plan. Cultural Heritage Management Plan; Residential Amenity Management Plan; and Emergency Response Plan. [ Chenoweth EPLA 078103 EMP_12_12_07 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.