Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ATTUNGA HEIGHTS PRELIMINARY EMP 1.5 EMP ROLES & RESPONSIBILITIES The EMP will be implemented through a structured framework identifying roles and clearly allocating responsibilities for the various procedures, controls and reporting in accordance with Schedule 1. This section defines the responsibilities of the Project Manager, Superintendent, Contractor, and Environmental Auditor for the environmental management of the project. The responsibilities of the Project Manager, Superintendent, Contractors and Environmental Auditor (as defined in Schedule 1) are identified in this EMP. It is the responsibility of the Contractor to implement most of the procedures and monitoring specified in this EMP. If at any stage during the course of works, non-compliance with an EMP occurs it is the duty of the Contractor to implement appropriate control or remediation measures to comply with these objectives. EMP compliance will be audited regularly by the Environmental Auditor. Reports on environmental performance and compliance advice will be issued to the Contractor, through the Superintendent, during the project. 1.5.1 General All parties involved in the project are required to undertake their work in accordance with relevant Acts, Policies and Regulations. In particular the parties are referred to the Environmental Protection Act 1994 and Aboriginal Cultural Heritage Act 2003 which require individuals and organisations to take all reasonable and practicable measures to prevent or minimise environmental harm and to ensure construction activities do not harm cultural heritage. All personnel involved in the project have an obligation to show due diligence with respect to management of all potential environmental and cultural heritage impacts. Any party ignoring these issues may be subject to prosecution under these Acts. Induction for all staff engaged on the project shall take place before work commences so that they are aware of environmental and cultural heritage values and potential issues, and the applicable compliance procedures. A copy of the EMP shall be kept on site by the Contractor and readily obtainable by anyone on-site. Any proposed changes to the current revision of EMPs by the Project Manager, Superintendent or Contractor shall be forwarded to the Environmental Auditor for consideration and approval from Council prior to any proposed changes being implemented. Chenoweth EPLA 078103_EMP_12_12 07 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.