ATTUNGA HEIGHTS PRELIMINARY EMP
and
Report on Construction and Operational Phase EMP implementation and performance to Noosa Shire Council on
completion of on-site works and following the maintenance and establishment periods.
Contractor Contractors (and/or their Conform to Noosa Shire Council standards and guidelines;
(and/or its representatives) will be Undergo induction and training to assist them in understanding environmental responsibilities;
representatives) appointed to undertake Implement appropriate on-site measures to adequately manage the environmental risks in accordance with the
various works and functions Construction and Operational Phase EMP, and report to the Superintendent regarding compliance;
tequired to plan and construct Comply with workplace health and safety legislation and standards, including appropriate personal protection
the development. Phases of equipment for project staff;
works required will be: Keep records of and advise Superintendent regarding complaints & responses, investigate & (where appropriate)
- Site preparation works implement control measures as soon as possible;
{vegetation clearing) Be present at inspections which will occur fortnightly (during construction) and as triggered by any environmental
Civil works events (e.g. major rain events causing run-off/erosion) and incidents (e.g. a spill or collapse of erosion & sediment
Construction control devices); and
Operation Follow directions of the Superintendent with respect to environmental performance.
Environmental Appointed by the Contractor Implement the responsibilities on behalf of the Contractor (above)
to implement all
environmental management
functions and sometimes the
Workplace Health and Safety
function also.
The Environmental Auditor is | The Environmental Auditor is responsible for:
responsible for reporting to Assist the Contractor, Superintendent and the Principal to comply with legislation, Council policy and conditions, and
Council through the Project community expectations during the project;
Manager and Superintendent Conduct audit inspections and other inspections as requested;
Comat tion ard Operational inspection of environmental protection measures;
Phase EMP and inspection of site at any time, including instances of environmental risk (eg. following heavy rainfall) or reported non-
environmental conditions. compliance; sys . , . . .
. review of monitoring reports and complaints logs on project completion and at any time as required;
preparing a project completion and compliance report.
Advise the Superintendent on the compliance and effectiveness of the Construction and Operational Phase EMP and
corrective measures, on the environmental implications of incidents and/or non-compliance, and appropriate
tectification/remediation measures; and
Review the Construction and Operational Phase EMP and advise the Superintendent and Principal of any changes or
modified practices required, and whether Council requires notification of such changes.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.