Skip to the record
Noosa’s premier civic archive.

Council archive · source document

07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555

of 216

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

¢ Whether or not the occurrence was related to any non-compliance with legislative requirements,
conditions or the EMP;

e Feedback provided to complainant(s); and

e Date for closure purposes.

1.10.2 Non-Compliance

Non-compliances related to environmental performance shall be recorded in a Non-Compliance Register
and documented the following minimum information, in addition to any specific EMP element
requirements:

e Date of non-compliance;

© Nature of non-compliance;

e Relevant environmental conditions at time of non-compliance;

e Relevant construction activities at time of non-compliance;

e Response action taken, including any EMP changes required;

¢ Whether or not there was any complaint associated with the non-compliance;

e Whether or not the non-compliance required reporting under any legislative requirements or
conditions, and the date of such reporting;

e Response received regarding report (and date); and

¢ Date for closure purposes.

1.10.3 Environmental Incidents

Environmental incidents (e.g. spillage of chemicals) which have the potential to cause an impact on the
environment shall be recorded in an Environmental Incidents Register and documented the following
minimum information, in addition to any specific EMP element requirements:

© Date of incident:

¢ Nature of incident:

¢ Relevant environmental conditions at time of incident:

¢ Relevant construction activities at time of incident:

e Response action taken, including any EMP changes required:

e Whether or not there was any non-compliance or complaint associated with the incident:

e Whether or not the incident required reporting under any legislative requirements or conditions,
and the date of such reporting;

e Response received regarding report (and date); and

e Date for closure purposes.

Environmental incidents shall be dealt with by the Superintendent in conjunction with the Project Safety
Officer and relevant staff. All environmental incidents shall be verbally reported to Council’s
Environmental Officer immediately and followed by a written report 48 hours, and any significant

 

Preliminary EMP: Attunga Heights Issue: 1 |16
Chenoweth EPLA Revision: 0 12/12/2007 |

 

 

 

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.