Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
1.9 MONITORING AND TESTING 1.9.1 Machinery & Materials The following shall be monitored on delivery / arrival on site: Item Environmental Attribute to be checked Documents Required Plant (trucks, dozers, | Within relevant noise level specifications Weekly cranes, etc.) Engine covers secured, no excessive vibration, Checklist within specified air quality criteria Maintenance Log Fuel, oil, chemicals Lids/Cover secured, No leakage/spillage, Weekly and lubricants Marking/identification Checklist Mfr Safety Data Sheet Equipment Within relevant noise level specifications Weekly (generators, pumps) | No excessive vibration Checklist Maintenance Log 1.9.2 Monitoring Equipment The Contractor shall ensure that environmental issues and control measures specific to this project are monitored and tested as detailed in the EMP. The Contractor shall ensure that monitoring / testing equipment with appropriate levels of accuracy for measuring the specific environmental variable identified in the EMP elements, All equipment is to be calibrated as per the manufacturer’s directions. 1.10 COMPLAINT, NON-COMPLIANCE, INCIDENTS & CORRECTIVE ACTION 1.10.1 Complaints Complaints related to environmental performance shall be recorded in a Complaints Register and documented the following minimum information, in addition to any specific EMP element requirements: Date of complaint; Name, address and contact number of complainant(s); Nature of complaint; Relevant environmental conditions at time of occurrence; Relevant construction activities at time of occurrence; Response action taken; Preliminary EMP: Attunga Heights Issue: 1 Chenoweth EPLA Revision: 0 12/12/2007 mi
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.