EGX_PROD_n6914339_4-8_&_16_Lower_Mill_Road,_Cooroy_L5_SP213104;_L7_SP173771
Attached to the e-mail Energex Referra Agency Response - MCU20/0012.
9 April 2020
Noosa Shire Council
PO Box 1684
Noosa Heads QLD 4567
Attention: Patrick Murphy
Via email: [email protected]
Cc Noosa Council
c/- Martoo Consulting
PO Box 1684
Noosa Heads QLD 4567
Attention: Nadine Gorton
Via email: [email protected]
Dear Patrick,
Referral Agency Response – Development Permit for a Material Change
of Use (Transport – Type 2 Car Park) at 4-8 & 16 Lower Mill Road,
Cooroy (Lot 5 on SP213104 and Lot 7 on SP173771)
Council Ref: MCU20/0012
Applicant Ref: 02615
Our Ref: HBD 6914339
We refer to the abovementioned Development Application, which has been
referred to Energex Limited pursuant to section 54(1) of the Planning Act
2016.
In accordance with Schedule 10, Part 9, Division 2 of the Planning
Regulation 2017, the application has been assessed against the purposes of
the Electricity Act 1994 and Electrical Safety Act 2002. This notice is
provided in accordance with section 56 of the Planning Act 2016. Enquiries
Benjamin Freese
Should the Assessment Manager decide to approve the proposed Material Telephone
Change of Use, as an Advice Agency for the Development Application, (07) 3664 5097
Energex advises the following in relation to the development: Facsimile
(07) 3664 9829
Email
1. The development is to be carried out in accordance with the plans
benjamin.freese@
identified below. Any changes to these plans should be resubmitted energyq.com.au
to Energex for further review and comment.
Corporate Office
Approved Plans 26 Reddacliff Street,
Newstead QLD 4006
Title Plan No. Rev Date GPO Box 1461
Typical Sections C03 B 22 January 2020 Brisbane Qld 4001
Telephone (07) 3664 4000
Setout Plan – Sheet 2 of 2 C05 B 22 January 2020 Facsimile (07) 3025 8301
www.energex.com.au
Existing, Demo & Sediment C08 B 22 January 2020
Control Plan
Energex Limited
ABN 40 078 849 055
Reference: HBD 6914339
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 3 pages
Page 2
2
Approved Plans
Title Plan No. Rev Date
Design Features – Carpark Area 2 C12 B 22 January 2020
Design Features – Pathway C13 B 22 January 2020
Connection
Design Features – Carpark Area 3 C14 B 22 January 2020
2. The conditions of any easements in favour of Energex must be maintained at all
times.
3. Any future works on Easement L on SP173771 are to ensure there is no impact
to the existing underground 11kV feeder. Prior to works commencing, the
Applicant/Developer is to submit RPEQ certified drawings to Energex
accurately locating underground electrical services and designing around these
services.
Note: where relevant, this condition may be satisfied by referring to Energex
any future development application/s for Operational Work, in accordance with
the requirements of the Planning Regulation 2017.
4. Any future works on an Energex easement or in the vicinity of Energex assets
are carried out in accordance with Energex Standard Guidelines UG-03/12. A
copy of these guidelines is attached for reference.
Should you require further information regarding this matter, please contact the
undersigned on (07) 3664 5097 or [email protected] faithfully,
Benjamin Freese
Town Planner
Reference: HBD 6914339
Have you seen our fact sheets?
See the ‘considerations when developing around electricity infrastructure’ section of our website
www.energex.com.au/referralagency
Page 3
3
Standard Guidelines UG-03/12
When considering Works either on Energex easements or in the vicinity of Energex assets,
please be aware of the following general conditions:
No civil works are to occur within 3 metres of the cable centreline unless otherwise
approved by the Senior Project Engineer- underground.
Where large excavations are taking place in the vicinity of our cables, there should be no
greater than a 45 degree batter to the cables (i.e. if excavating to a 5 metre depth- need to
maintain a 5 metre horizontal clearance to the edge of the cable trench).
Excavations in excess of 5 metres in depth must have a minimum horizontal separation,
from the excavation to cable centreline, at least equal to the excavation depth.
If the easement is to be re-surfaced, the developer must consider that Energex require
timely access to the cables, especially under network emergency conditions. Re-enforced
concrete pavements (or similar) over the easement are generally NOT allowed as they will
impede timely access to the cables. Energex will consider surfaces that are easier to
remove. (e.g.- asphalt, etc) over the easement up to a thickness of 100mm. please submit
detailed plans of any proposal for consideration by Energex.
The easement may be excavated at any time (and without notice for emergency situations)
to maintain/repair existing cables and install new cables if required. Access across/along
the easement could be prohibited for an indeterminate length of time, possibly weeks for
new cable installations while the works are undertaken.
Natural ground levels on the easement shall not be changed without Energex approval.
Final ground levels should slope gently to the edge of the easement, surrounding area or
kerb such that pooling of water on the easement is avoided.
Stockpiling of spoil on the easement is prohibited.
Any proposed underground services are to be kept out of the easement and are to only
cross the easement as near as possible to right angles to the cables.
Any excavation for services across Energex transmission cables should be no deeper than
the barrier boards protecting these cables. Under no circumstances should barrier boards
be removed and the backfill around the cables disturbed.
Any excavation under Energex cables should be referred to the senior project engineer-
underground to determine if cables need to be supported during excavation. Energex will be
required to fill back around the cables on completion of the works.
When directional drilling across Energex cables a trench should be dug beside the cables to
sight the location of the drilling head as it passes over/under the cables. There should be a
minimum 500mm separation between the drilling head and cables.
Any further proposal for works or development on the easement including those involving
changes in ground level and retaining wall designs around cables must have prior approval
from Energex. Please submit the relevant civil design to Energex for approval.
Reference: HBD 6914339
Have you seen our fact sheets?
See the ‘considerations when developing around electricity infrastructure’ section of our website
www.energex.com.au/referralagency
Page 4
4
Access to the easement and access along the easement must be available to Energex
personnel and heavy equipment at all times. Energex will require the Developer / owner to
supply and install gates where fencing prohibits access to and along the easement area.
To enable travel along the easement at anytime the gates must be series locked with an
Energex padlock. Both the padlock and a design drawing of an acceptable gate will be
provided by Energex.
Any costs or damages incurred by Energex as a result of the works on the easement are to
be met by the property Developer / owner.
Landscaping on the easement is generally not permitted.