Delegated Report - Code - Planning MCU25 0034 · MCU25/0034
S03 C1 Site Plan, Framing Plan, Elevations 5 February 2025
prepared by Long View Consulting
Engineers
AS ANNOTATED BY COUNCIL
S04 C1 Jetty Framing Details prepared by Long 5 February 2025
View Consulting Engineers
Currency Period
2. The Currency Period for this development approval lapses if all conditions have not been
complied with, and the plan of survey lodged with Council for endorsement by 10 July 2027,
unless an application to extend the currency period is approved by Council.
Performance Bond
3. Security in the form of a cash bond or trading bank guarantee to the sum of $2000 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
commencement of the works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of this approval less any costs incurred by Council in respect
of enforcing performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
Bonds
4. Bonds must:
a. meet the requirements of Council’s relevant Planning Scheme Policy for performance
and uncompleted works.
b. be lodged with Council and accompanied by the Bond Administration Fee/s.
c. be requested for release by writing to Council, when relevant approval requirements
have been met.
General Conditions
5. The maximum number of vessels that may be berthed, moored, attached or stored on the
structure must not exceed 2 vessels.
6. The use of the jetty must not cause any adverse effects on the amenity of the surrounding
areas including changes to light, views, air quality and noise
7. All vessels berthed/moored at the jetty must be located:
a. on the south-eastern side of the jetty only, with no vessels to be moored inside the
clouded area shown on the approved plans;
b. a minimum of 1.0 metre from the prolongation of the property boundaries.
8. The jetty is to be used for private purposes only with no commercial operations to be
undertaken.
9. Boat repair activities are not permitted on site.
10. All existing landing structures and devices for the premises must be removed prior to the
construction of the approved landing and associated works.
11. All structures must be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall
12. All structures must have no detrimental effects on stormwater drains and/or easements.
13. Jetties must have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the
revetment wall.
Page 5 of 8
Document Set ID: 23873316
Version: 3, Version Date: 15/07/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU25 0034.pdfRelated documentApplication case desk ↗
Delegated Report - Code - Planning MCU25 0034.pdfRelated documentApplication case desk ↗
About this file
- File size
- 324 KB (small file)
- File type
No other editions are linked here.