Delegated Report - Code - Planning MCU25 0034 · MCU25/0034

of 8

Text shows just the words. Original shows the document exactly as it was published.

               5.      CONSULTATION
               5.1. Referral Agencies
               Not Applicable
               5.2. Internal Council Referrals
               The application was forwarded to the following internal Council officers for review and/or comment:
               •     Development Planner
               6.      CONCLUSION & REASONS FOR DECISION
               The proposed development generally complies with the requirements of the planning scheme and
               does not raise any significant issues that cannot be addressed by reasonable and relevant
               conditions. The application is therefore recommended for approval.
               The report is provided in accordance with Section 63(5) of the Planning Act 2016.
               RECOMMENDATION
               With regard to Application No MCU25/0034 for a Material Change of Use - Landing - Residential
               and OPW25/0048 for Operational Works – Jetty situated at Lynbrydon 2 2/1 Sunseeker Cl
               Noosaville Qld 4566 and described as Lot 2 GTP 102778, it is recommended the application be
               approved in accordance with the following details for the Decision Notice:
               1.      APPLICATION DETAILS

                   Application No:               MCU25/0034

                   Street address:               Lynbrydon 2 2/1 Sunseeker Cl Noosaville Qld 4566

                   Real property description:    Lot 2 GTP 102778

                   Planning Scheme:              Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •     Development Permit for Material Change of Use - Landing – Residential and
               •     Development Permit for Operational Works - Jetty
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

                       Approved Plans
               1.      Development undertaken in accordance with this approval must generally comply with the
                       approved plans of development. The approved plans are listed in the following table unless
                       otherwise amended by these conditions.

                          Plan No.              Rev.   Plan/Document Name                     Date

                          S01                   C1     Drawing   Schedule &  Transmittal 5 February 2025
                                                       prepared by Long View Consulting
                                                       Engineers

                          S02                   C1     Structural Notes Sheet prepared by Long 5 February 2025
                                                       View Consulting Engineers

                                                                                                      Page 4 of 8

Document Set ID: 23873316
Version: 3, Version Date: 15/07/2025

Used in these records

About this file

File size
324 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU25 0034.pdf · 324 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.