Skip to the record
The only place to find full transcripts.

Council archive · source document

Part 10 of 37 Appendix 8 - Queensland Coastal Plan Assessment MCU12/0208

of 48

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (26.4 MB): may take a few minutes to open.

Log in to see the plans as drawn
Noosa on Weyba
QCP Assessment
                                                                                                CI"Cardnoe
5.2.3            TUFLOW Runs

A summary of flood scenarios modelled in TUFLOW as part of the flood study are provided in Table 5-1.
The peak local storm events were the 90 minute and 24 hour storms.

Table 5-1                  TUFLOW Model Runs



    Model Run                                                                                               Resultant
                              Local Inflows                                 Tailwater Level
      Number                                                                                                 ARI (y)


                                                Local Events   -
                                                                   MHWS


           1                  100 year ARI                                           MHWS                      100


           2                   50 year ARI                                           MHWS                       50


           3                   20 year ARI                                           MHWS                       20


           4                   10 year ARI                                           MHWS                       10


           5                   5 year ARI                                            MHWS                        5


           6                   2 year ARI                                            MHWS                        2


           7                    1 year ARI                                           MHWS                        1


                                      100 Year ARI Local Event      -
                                                                        Storm Surge


           8                   20 year ARI                  1.8 mAHD         -
                                                                                 100 year storm surge          100


           9                  100 year ARI                   1.5 mAHD            -
                                                                                     20 year storm surge       100


                                                  Regional Events

          10                100 year, 30 hour                      Regional 100 year, 30 hour                  100


          11                50 year, 30 hour                       Regional 50 year, 30 hour                    50


          12                20 year, 30 hour                       Regional 20 year, 30 hour                    20


          13                10 year, 30 hour                       Regional 10 year, 30 hour                    10


          14                 5 year, 30 hour                        Regional 5 year, 30 hour                     5


          15                 2 year, 30 hour                        Regional 2 year, 30 hour                     2


                                               Probable Maximum Flood


          16                       PMF                    2.68 mAHD          -
                                                                                 1000 year Storm Surge         PMF


                                                   Climate Change


          17              20 year ARI (+20%)            2.6 mAHD      -
                                                                            100 year storm surge + 0.8m     100 (CC)


          18              100 year ARI (+20%)            2.3 mAHD       -
                                                                            20 year storm surge + 0.8m      100 (CC)




Northbrook Corp Pty Ltd and J&K Hofmann                Version 2                                           15 October 2012
QCP Assessment v2.docx                          Commercial in Confidence                                             Page 6

Used in these records

About this file

File size
26.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 10 of 37 Appendix 8 - Queensland Coastal Plan Assessment MCU12_0208.pdf · 26.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.