Council archive · source document
Part 10 of 37 Appendix 8 - Queensland Coastal Plan Assessment MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Very large file (26.4 MB): may take a few minutes to open.
Noosa on Weyba
QCP Assessment
CI"Cardnoe
5.2.3 TUFLOW Runs
A summary of flood scenarios modelled in TUFLOW as part of the flood study are provided in Table 5-1.
The peak local storm events were the 90 minute and 24 hour storms.
Table 5-1 TUFLOW Model Runs
Model Run Resultant
Local Inflows Tailwater Level
Number ARI (y)
Local Events -
MHWS
1 100 year ARI MHWS 100
2 50 year ARI MHWS 50
3 20 year ARI MHWS 20
4 10 year ARI MHWS 10
5 5 year ARI MHWS 5
6 2 year ARI MHWS 2
7 1 year ARI MHWS 1
100 Year ARI Local Event -
Storm Surge
8 20 year ARI 1.8 mAHD -
100 year storm surge 100
9 100 year ARI 1.5 mAHD -
20 year storm surge 100
Regional Events
10 100 year, 30 hour Regional 100 year, 30 hour 100
11 50 year, 30 hour Regional 50 year, 30 hour 50
12 20 year, 30 hour Regional 20 year, 30 hour 20
13 10 year, 30 hour Regional 10 year, 30 hour 10
14 5 year, 30 hour Regional 5 year, 30 hour 5
15 2 year, 30 hour Regional 2 year, 30 hour 2
Probable Maximum Flood
16 PMF 2.68 mAHD -
1000 year Storm Surge PMF
Climate Change
17 20 year ARI (+20%) 2.6 mAHD -
100 year storm surge + 0.8m 100 (CC)
18 100 year ARI (+20%) 2.3 mAHD -
20 year storm surge + 0.8m 100 (CC)
Northbrook Corp Pty Ltd and J&K Hofmann Version 2 15 October 2012
QCP Assessment v2.docx Commercial in Confidence Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 10 of 37 Appendix 8 - Queensland Coastal Plan Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 26.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.