Council archive · source document
Part 10 of 37 Appendix 8 - Queensland Coastal Plan Assessment MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Very large file (26.4 MB): may take a few minutes to open.
Noosa on Weyba
Table 3-2 Shoreline Erosion Modelling Scenarios
Water Level Condition Wave Conditions
Scenario Total Lake
Number Lake Water Level Design Wave Tp
Water Level Hs(m)
Scenario Scenario (s)
(mAHD)
Present Day Lake Level +
1 1.45 50yrs ARI 0.73 4.3
1 Oyrs ARI Design Flood
Present Day Lake Level +
2 1.53 1 OOyrs ARI 0.76 4.4
20yrs ARI Design Flood
2050 Lake Level +
3 1.75 50yrs ARI 0.75 4.3
1 Oyrs ARI Design Flood
2050 Lake Level +
4 1.83 100yrs ARI 0.78 4.4
20yrs ARI Design Flood
2100 Lake Level +
5 2.25 50yrs ARI 0.78 4.4
10yrs ARI Design Flood
2100 Lake Level +
6 2.33 100yrs ARI 0.82 4.5
20yrs ARI Design Flood
The results of the SBEACH erosion modelling indicated that the foreshore erosion extents presented in
Table 3.3 would occur in these events. These erosion extents were taken at 0.5m above the still water level
for each case and included post erosion slumping where the eroded profile was steeper than the dry angle of
natural repose of sand. Each storm was assumed to have a duration of 6 hours at peak wave conditions,
which is a conservative position.
Table 3-3 Shoreline Erosion Results
Scenario
Profile 1 Profile 2 Profile 3
Number
1 1.9 5.0 6.1
2 3.6 5.8 7.2
3 6.8 7.6 7.9
4 7.5 8.0 8.6
5 6.5 5.5 9.2
6 6.7 5.8 10.0
These results show that in severe storm events the present shoreline will suffer some erosion; but this is
rare, as confirmed by the grassy shoreline observed during the site visit. More shoreline erosion can be
expected when projected sea level rises occur.
3.3 Assessment of Erosion Prone Area
The QLD Coastal Hazard Guidelines (2011)outline a methodology for assessing erosion prone areas widths.
These widths are intended to accommodate both short-term and long-term erosion over specified planning
periods. This erosion prone area width is a specified horizontal distance back from the present-day HAT
water line, and is calculated by the following equation provided in the guidelines.
E = [(NxR)+C+S]x (1+F)+ D
Where:
28 September 2012 Cardno 5
\\ausydcfs01 \COE-Jobs\CM\51 0119-Lake Weyba\009-ReportingDocsandFigures\R001 Ver 1.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 10 of 37 Appendix 8 - Queensland Coastal Plan Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 26.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.