Council archive · source document
Appendix E Traffic Impact Assessment Report · MCU22/0038
O12 S12.1 At locations where pedestrian ü Complies with S12.1
Parking areas are designed to - and vehicle conflicts are likely to occur The proposed development has been designed to
a) provide a progressive reduction in – avoid introducing new pedestrian-vehicle conflicts by
speed between the external road and a) sight distances of at least 2.5 providing direct and dedicated pedestrian
internal parking spaces; seconds of travel time at the connections to the fronting road network and car
b) ensure lower speeds near areas of designated speed are provided; parking areas.
high pedestrian activity through the b) splayed corners on structures
use of appropriate road geometry or are incorporated;
devices designed to limit speed; and c) landscaping is designed to allow
c) maintain sight distances which are clear views; and
appropriate for the likely operating d) sign placement ensures that
speeds in all areas of potential sight distance requirements are
pedestrian/vehicle and vehicle/vehicle not impeded.
conflict.
O13 S13.1 N/A S13.1 not applicable
A clearly defined pedestrian network is In large open car parks with greater The subject development does not include large
provided that – than 200 car parking spaces, a open car parking areas with greater than 200
a) is located in areas where people will pedestrian path between parking parking spaces.
choose to walk; spaces is provided on every second
b) ensures that pedestrian movement aisle.
through car parking areas or
structures are along aisles rather than
across them.
O14 S14.1 ü Complies with O14
Provision is made for pedestrian and No probable solution identified It is noted that the location of the proposed
vehicular queues at conflict points. basement access ramp minimises conflict as all
vehicles would be expected to be turning into and
out of the basement, with the only potential conflict
being with service vehicles entering the service lane
behind the Emporium Showroom tenancies. This is
however expected to be infrequent and
concentrated outside of peak trading periods of the
subject development.
Notwithstanding this, provision has been made for
the storage of one vehicle at the top of the ramp
clear of the primary ramp gradient. This is
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E Traffic Impact Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.