Skip to the record
The only place to find full transcripts.

Council archive · source document

Appendix E Traffic Impact Assessment Report · MCU22/0038

of 48

Text shows just the words. Original shows the document exactly as it was published.

             discharge of stormwater run-off        S7.3                                       N/A   S7.3 not applicable
             from contributing catchments and       On-road cycling treatment is utilised to         The subject development does not propose the
             the preservation of all weather        provide safe and continuous movement             planning or construction of new or upgraded road
             access;                                of cyclists along a roadway, such as—            infrastructure.
c) kerb and channel—                                a) sealed shoulders;
   i.      controls vehicle movement by             b) wide kerbside lane;
           delineating the carriageway for all      c) exclusive or peak
           users;                                        period bicycle lane;
  ii.      conveys road pavement run-off to         d) advisory treatments
           stormwater drainage in a manner               such as Bicycle
                                                         Awareness Zone;
           that allows the road to be trafficable
                                                    e) shared parking / bicycle
           in Q100 ARI local rainfall events;            lane;
           and                                      f)   contra flow bicycle
d) verges and footpaths provide—                         lane; and
      i. safe access for pedestrians and            g) bus/bicycle lane.
           cyclists clear of obstructions;
      ii. an access area for vehicles onto          S7.4                                       N/A   S7.4 not applicable
           properties;                              The provision of bicycle lanes at                The subject development does not propose the
      iii. a corridor allocated for services and    intersections is generally in                    planning or construction of new or upgraded road
           utilities; and                           accordance with AUSTROADS Part                   infrastructure.
      iv. additional amenity for minor roads.       14, section 5 and the Manual of Urban
                                                    Traffic Control Devices (MUTCD) Part
                                                    9.
O8                                                  S8.1                                       N/A   S8.1 not applicable
Stormwater drainage infrastructure is               Stormwater drainage planning, design             Stormwater considerations are beyond the scope of
planned, designed and constructed to—               and construction is in accordance with           this traffic assessment.
a)   be accessible, cost effective and              Section 4 of PSP5 Engineering Design
     easily maintainable;                           Standards – Roads, Drainage and
b)   protect downstream capacity;                   Earthworks;
c)   protect downstream water quality;              AND

Used in these records

About this file

File size
3.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E Traffic Impact Assessment Report.pdf · 3.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.