Appendix E Traffic Impact Assessment Report · MCU22/0038
d) maximise on-site stormwater S8.2 N/A S8.2 not applicable
retention and retardation; and As Constructed data is submitted in Stormwater considerations are beyond the scope of
convey run-off to stormwater drainage in a accordance with Section 6 of PSP5 this traffic assessment.
manner that allows roads to be trafficable Engineering Design Standards –
in Q100 ARI local rainfall events Roads, Drainage and Earthworks; AND
S8.3 Stormwater drainage planning, N/A S8.3 not applicable
design and construction is in Stormwater considerations are beyond the scope of
accordance with the Queensland Urban this traffic assessment.
Drainage Design Manual
O9 Roads and stormwater drainage S9.1 N/A S9.1 not applicable
infrastructure is constructed— Roads and stormwater drainage Stormwater considerations are beyond the scope of
a) in accordance with appropriate infrastructure is constructed in this traffic assessment.
engineering standards; and accordance with— The subject development also does not propose the
to minimise adverse environmental impacts, a) Sections 2, 3 and 4 of PSP5 planning or construction of new or upgraded road
including from run-off and erosion. Engineering Design Standards – infrastructure.
Roads, Drainage and Earthworks;
b) Queensland Design Code for
Residential Streets;
c) AUSTROADS; or
d) A combination of the principles in
these documents;
AND
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E Traffic Impact Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.