Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Appendix E Traffic Impact Assessment Report · MCU22/0038

of 48

Text shows just the words. Original shows the document exactly as it was published.

                                          Design Standards – Roads, Drainage
                                          and Earthworks.
Frontage works
O13                                       S13.1                                       ü     Complies with S13.1
Development is provided with external     The following infrastructure                      The roads fronting the subject site are already of an
roadworks along the full extent of the    components already exist at the                   adequate standard and therefore no upgrades of the
frontage of the site to an appropriate    frontage of the site or are provided at           fronting roads are required or proposed.
standard having regard to the specified   the developer’s expense—
function of the road.                     a) full width sealed road;
                                          b) concrete kerb and channel where
                                              appropriate;
                                          c) forming and grading to footpaths;
                                          d) vehicular kerb and footpath
                                              crossings;
                                          e) a constructed bikeway;
                                          f) a constructed footpath;
                                          g) a constructed carriageway;
                                          h) required alterations to public utility
                                              mains, services or installations;
                                          i) construction of any required
                                              alterations to public utility mains,
                                              services or installations;
                                          j) stormwater drainage works; and
                                          k) installation of electrical conduits;
                                          AND
                                          S13.2                                       N/A   S13.2 not applicable
                                          Road and drainage design and                      Stormwater considerations are beyond the scope of
                                          construction is in accordance with                this traffic assessment.
                                          Sections 3 and 4 of PSP5 Engineering              The subject development also does not propose the
                                          Design Standards – Roads, Drainage                planning or construction of new or upgraded road
                                          and Earth works.                                  infrastructure.

Road and rail corridors

Used in these records

About this file

File size
3.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E Traffic Impact Assessment Report.pdf · 3.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.