Original source · versioned page text
Town Planning Assessment Report
5.2. Assessment Benchmarks Related to the Planning Regulation 2017
The Planning Regulation 2017 (the Regulation) prescribes assessment benchmarks that the application must
be carried out against, which are additional or alternative to the assessment benchmarks contained in
council’s Planning Scheme. These assessment benchmarks may be contained within:
• the SEQ Regional Plan;
• Part E of the State Planning Policy, to the extent they are not appropriately integrated into the
Planning Scheme; and
• Schedule 10 of the Regulation.
An assessment against the applicable benchmarks contained within the Planning Regulation is provided
below:
SEQ Regional Plan
The subject site is located within the Urban Footprint designation under the SEQ Regional Plan. The
proposed subdivision is consistent with the goals, elements and strategies under the SEQ Regional Plan for
the Urban Footprint designation.
Part E of the State Planning Policy
The current State Planning Policy (SPP) commenced on 3 July 2017. The applicable State interests relating
to development assessment are set out in Part E of the document and are under five broad themes. The
assessment benchmarks of the SPP Part E that are relevant to the development proposal are consistent
with the current provisions of the Planning Scheme and would not warrant further assessment.
Schedule 10 of the Regulation
Pursuant to Schedule 10 Part 9 of the Planning Regulation 2017, referral is triggered for infrastructure related
referrals (land within 25m of a State transport corridor (railway)) as detailed in the table 5.2.2 below
Table 5.2.1 - Schedule 10 Assessment
Schedule 10 - Development Assessment Applicable/Comments
Part 1 Airport Land N/A
Subject site not identified on airport land.
Part 2 N/A
Brothels Development does not involve a brothel use
Part 3 Clearing of native vegetation N/A Lot is less than 5ha and will not require vegetation
clearing
Part 4 Contaminated land N/A the site is identified on the Environmental
Management Register (EMR) for wood treatment and
preservation and petroleum product or oil storage,
however, reconfiguring a lot is not made assessable
development under Part 4.
Part 5 Environmentally relevant N/A
activities
Part 6 Fisheries N/A
Part 7 Hazardous chemical facilities N/A
Part 8 Heritage places N/A
Part 9 Infrastructure-related referrals Applicable . The land parcel is within 25m of a State
transport corridor (railway).
Part 10 Koala habitat area N/A
Part 11 Noise sensitive place on noise N/A
attenuation land
Page 8 of 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Town Planning Assessment Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.