Council archive · source document
Bushfire Management Plan Review Report_June 2018 · RAL18/0023
Plans and drawings: the text below has words only, no drawings.
Report on Review of Bushfire Situation at Noosa Q.I.C.
Civic
Summary of Proposed Works with Timing and Budget Estimate
Immediate Attention
Items Items Description Timeframe/Frequency Cost Estimate
4.1.1 Clear access track 2018/19 $12,000
from Hofmann Drive
to Walter Hay Drive
Connection ( 4
metres wide –
formed and drained)
4.1.2 Upgrade of dead 2018/19 $8,000
end track running
north from track in
4.1.1 to a loop as
shown in Aerial
Photo. 3 (4x4
standard – not
formed and drained)
4.1.4 Widening of existing 2018/19 $30,000 +
path from the south (Quotes are required
west corner of the for better estimate)
Big W building
around to the south
east corner to
provide vehicular
access from
Hofmann Drive to
north east car park
4.2.1 Removal of 2018/19 $15,000+
understorey
vegetation and dead
end dangerous
trees on the
southern side of
Hofmann Drive to
Walter Hay Drive
access track as
mentioned in 4.1.1
(total width of 10m
including the track)
4.2.2 Removal of 2019/20 $5,000
understorey
vegetation around
Fuel Reduction Unit
1 and 2 ( achieved
in conjunction with
4.1.1 and 4.1.2)
18-028 Report Commercial-in-Confidence
Page 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Bushfire Management Plan Review Report_June 2018.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.