Council archive · source document
Bushfire Management Plan Review Report_June 2018 · RAL18/0023
Plans and drawings: the text below has words only, no drawings.
Report on Review of Bushfire Situation at Noosa Q.I.C.
Civic
4.3 Provide hose and Prior to the 2019 fire $5,000
reels adjacent to season.
three Urban Fire
Hydrants along the
southern wall of Big
W
Sub Total $75,000 +
Subsequent Attention
4.1.3 Construction of Only required if Investigation: $1,500
access track from hazard reduction Construction: $8000 -
end of Hofmann burning proves $10,000
Drive around impossible by 2020.
southern section of
the property out to
Walter Hay Drive
4.2.4 Unit 1 Arrange Fuel As soon as $5,000
Reduction Burn with preparation work is
Local Rural Fire completed.
Brigade Late Winter 2019
4.2.4 Unit 2 Arrange Fuel 2021/22 $5,000
Reduction Burn with
Local Rural Fire
Brigade
4.3 Confirm urban water Prior to the 2019 fire TBC
supply along the season.
south-east access
driveway out of the
carpark to facilitate
connection of urban
water if need be
Area 2 Arrange fuel 2020/21 TBC
(see Plan reduction burn with
032310.10) National Park
Sub Total $19,500 – $21,500 +
Ongoing Annual Obligations
4.2.3 Removal of all Annually $4,000
understorey
vegetation out of the
edge of the bank as
is the current
practice
18-028 Report Commercial-in-Confidence
Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Bushfire Management Plan Review Report_June 2018.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.