Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                               SITE BASED STORMWATER
                                                                     MANAGEMENT PLAN


                                             PROPOSED TOWNHOUSE DEVELOPMENT AT
                                                  99, 101 & 105 EUMUNDI NOOSA ROAD
                                                                         NOOSAVILLE


                                                                                                         Prepared for

                                                                                                   Altum Property Group
                                                                                                Attention: Laura Sutton


                                                                                           Document Reference
                                                                                                        20169 - SBSMP/4

Record of Issue:

 Issue        Status             Author           Date           Checked            Date          Authorised          Date
                                                 26 Nov       Henry Morgan         30 Nov       Henry Morgan        30 Nov
   0       For Review         Darren Yuen
                                                  2020         RPEQ 11950           2020         RPEQ 11950          2020
                                                 01 Dec       Henry Morgan         04 Dec       Henry Morgan        04 Dec
   1      For Approval        Darren Yuen
                                                  2020         RPEQ 11950           2020         RPEQ 11950          2020
                                                 10 Feb       Henry Morgan         12 Feb       Henry Morgan        12 Feb
   2      For Approval        Darren Yuen
                                                  2021         RPEQ 11950           2021         RPEQ 11950          2021
                                                 10 Aug       Henry Morgan         10 Aug       Henry Morgan        10 Aug
   3      For Approval        Darren Yuen
                                                  2021         RPEQ 11950           2021         RPEQ 11950          2021
                                                 12 Oct       Henry Morgan         13 Oct       Henry Morgan         13 Oct
   4      For Approval        Darren Yuen
                                                  2021         RPEQ 11950           2021         RPEQ 11950           2021

This investigation and report has been authorised by Mr Henry Morgan, a Director of Morgan
Consulting Engineers Pty Ltd.




Henry J Morgan          RPEQ 11950                                                   Wednesday, 13 October 2021



D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Current\20169 - SBSMP - Rev 4.docx
Log in to download the original file

RFI - Stormwater Mgm Plan 20169 - SBSMP - Rev 4 (2).pdf · 14.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of pages 2 to 62 (of 92)

Page 2

                                                                                             20169 - SBSMP/4
                                                                                                          Page 2




                                           Table of Contents
1     INTRODUCTION ............................................................................................ 3
2     EXISTING SITE CONDITIONS .............................................................................. 4
  2.1    The Site ................................................................................................ 4
  2.2    Surrounding Area ...................................................................................... 4
3     PROPOSED DEVELOPMENT ............................................................................... 5
4     EXISTING DRAINAGE PATTERNS ......................................................................... 6
  4.1    Existing Infrastructure ............................................................................... 6
  4.2    Existing Drainage Patterns ........................................................................... 7
  4.3    Lawful Point of Discharge............................................................................ 7
5     STORMWATER QUANTITY................................................................................. 9
  5.1    Rational Method Assessment ........................................................................ 9
    5.1.1     Design Storms ....................................................................................9
    5.1.2     Rainfall Intensity ................................................................................9
    5.1.3     Times of Concentration .........................................................................9
    5.1.4     Runoff Coefficients ..............................................................................9
    5.1.5     Peak Flows ...................................................................................... 10
  5.2    Proposed Drainage Patterns ....................................................................... 10
  5.3    Downstream Pipe Infrastructure Considerations ............................................... 11
  5.4    XPSTORM Modelling ................................................................................. 11
    5.4.1     Intensity Frequency Distribution ............................................................ 11
    5.4.2     Initial and Continuing Losses ................................................................. 11
    5.4.3     On-site Detention .............................................................................. 12
    5.4.4     Comparison of Peak Flows at Lawful Point of Discharge ................................. 12
    5.4.5     Sensitivity Analysis for 1% AEP Storm Event at end of Planning Period 2100 ......... 13
6     STORMWATER QUALITY ................................................................................ 15
  6.1    State Planning Policy Assessment ................................................................ 15
  6.2    Construction Phase ................................................................................. 15
  6.3    Operational Phase .................................................................................. 17
    6.3.1     Sources of Contaminants ..................................................................... 17
    6.3.2     Proposed Treatment Train ................................................................... 18
    6.3.3     Pollutant Export Modelling ................................................................... 18
    6.3.4     MUSIC Modelling Parameters ................................................................. 19
    6.3.5     MUSIC Modeling Results ....................................................................... 19
7     FLOODING ................................................................................................ 21
8     CONCLUSION ............................................................................................. 22
Appendix A DETAILED SITE SURVEY PLAN ................................................................. 23
Appendix B PROPOSED DEVELOPMENT PLANS ............................................................ 24
Appendix C NOOSA COUNCIL INTERACTIVE MAPPING DATA ............................................ 25
Appendix D NSC WATER QUALITY AND DRAINAGE CODE ................................................ 26
Appendix E STORMWATER QUANTITY CALCULATIONS................................................... 27
Appendix F CONCEPT SITE LEVELS AND DRAINAGE PLAN ............................................... 28
Appendix G BOM IFD DATA .................................................................................. 29
Appendix H XPSTORM PRE DEVELOPMENT RESULTS ..................................................... 30
Appendix I XPSTORM POST DEVELOPMENT RESULTS .................................................... 31
Appendix J XPSTORM POST DEVELOPMENT MITIGATED RESULTS ...................................... 32
Appendix K STORMWATER QUALITY AND MAINTENANCE GUIDELINES ................................. 33
Appendix L NSC FLOOD HAZARD OVERLAY MAP .......................................................... 34




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 3

                                                                                 20169 - SBSMP/4
                                                                                          Page 3




1 INTRODUCTION
This Site Based Stormwater Management Plan (SBSMP) has been prepared for the proposed
Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville.

This SBSMP has been prepared to investigate the effects the development will have on stormwater
quantity and quality.

The objective of this SBSMP is to ensure that there is no adverse impact by the development on
the environmental value of the receiving waters during the construction and operational phases
of the development. This SBSMP will also provide recommendations to ensure that the post-
development peak outflow conditions are not greater than the pre-development peak outflow
conditions.

In order to achieve this objective, this SBSMP:

    1. Describes the environmental setting of the development site and precinct;
    2. Describes the nature of the proposed development as it relates to stormwater quality;
    3. Calculates the peak flows for both pre and post-development conditions;
    4. Calculates the detention volume required to achieve the pre-development outflow in the
       post-development state; and
    5. Identifies potential sources of contaminants and describes the management techniques
       designed to be employed on the site to achieve the water quality objectives.


The proposed development has been assessed against the following guidelines and planning
documents:


    1. State Planning Policy 2017 (SPP 2017);
    2. Urban Stormwater Quality Planning Guidelines 2010;
    3. The Queensland Urban Drainage Manual (QUDM); and
    4. The Noosa Council Planning Scheme.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 4

                                                                                      20169 - SBSMP/4
                                                                                                   Page 4




2 EXISTING SITE CONDITIONS

2.1 The Site
The site, described as Lot 1 on RP849431, Lot 1 on RP230931 and Lot 61 on RP69404, has an
approximate area of 8,668m2 (0.867ha). Lot 1 on RP849431 contains an existing residential dwelling
while Lot 1 on RP230931 and Lot 61 on RP69404 were existing commercial businesses.

The majority of the site generally slopes from west to east at an average grade of approximately
4.5% between the elevations of 19.30m AHD and 14.50m AHD. The site is accessible via Eumundi
Noosa Road, which bounds the western property boundary.

Refer to Figure 2.1 for a Locality Plan and Appendix A for the Detailed Site Survey. .




   N
                                                                                           Treasure Cove



                                              Subject
                                                Site




                                                                         Regatta Circuit




                        Figure 2.1 – Locality Plan of Site and Surrounding Area

2.2 Surrounding Area
The site is located within the limits of the Noosa Council region within a Medium Density Zoned
area and is bound by Eumundi Noosa Road to the west. The surrounding areas are generally zoned
as Low and Medium Density Residential with Community Facilities located to the south.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 5

                                                                                 20169 - SBSMP/4
                                                                                          Page 5




3 PROPOSED DEVELOPMENT
The proposed Townhouse Development primarily involves the construction of:

    1. 42 x 2 bed apartments and 11 x 3 bedroom apartments;
    2. Carparking spaces for residents and visitors;
    3. Vehicular access from Eumundi Noosa Road at the north-west corner of the site;
    4. Hardstand pavement area for vehicular manoeuvring;

    5. Dedicated landscaping throughout the site; and

    6. A communal pool area.

Refer to Appendix B for the Proposed Development Plans.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 6

                                                                                             20169 - SBSMP/4
                                                                                                      Page 6




4 EXISTING DRAINAGE PATTERNS

4.1 Existing Infrastructure
Data obtained from the detailed survey and as-constructed information obtained from Noosa
Council’s interactive mapping show the following existing drainage infrastructure:
    1. An existing 225mm to 450mm dia. stormwater pipe running parallel to the south eastern
       boundary of the site within Lots 45, 46 and 62 on SP132578 and Lots 42-44 on SP144002;
    2. An existing gully pit located within the south east corner of the site with a 225mm dia.
       stormwater connection to the existing 300mm dia. pipe within Lot 46 SP132578;
    3. An existing stormwater structure located at the north-western corner of the site within the
       driveway access of Lot 61 on RP69404, with a kerb adaptor connection to Eumundi Noosa
       Road; and
    4. An existing gully pit located within the north east corner of the site with a 300mm dia.
       stormwater connection to the existing 300mm dia. pipe within the driveway of Lot 79 on
       SP138388, which ultimately connects to a 450mm dia. pipe within Treasure Cove.
Refer to Figure 4.1 for the existing stormwater infrastructure and drainage patterns, Appendix A
for the Detailed Site Survey and Appendix C for the Noosa Council Interactive Mapping data.




  N




                                       Subject Site




                                                                                 Legend
                                                                                 Sheet Flow Path
                                                                                 Stormwater Pipe
                                                                                 Gully Pit


                         Figure 4.1 – Existing Drainage Paths & Infrastructure




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 7

                                                                                 20169 - SBSMP/4
                                                                                            Page 7




4.2 Existing Drainage Patterns
Data obtained from Noosa Council’s records and detailed site survey indicate that the site has
the following drainage patterns:

Roofwater Runoff
    1. The existing commercial building roofwater within Lot 1 on RP230931 appears to travel
       underground and connect into the existing structure located within the driveway access of
       Lot 61 on RP69404. Hence, the roofwater from the existing commercial building was
       discharged to the Eumundi Noosa Road kerb and channel.
    2. A review of the street frontage of the site along Eumundi Noosa Road indicated that there
       is no kerb outlet for Lot 1 on RP849431. Hence, it is assumed that roofwater from the
       existing residential building is discharged to the ground or to the existing underground
       stormwater infrastructure at the rear of the site via downpipes.

    3. The existing building roofwater within Lot 61 on RP69404 appears to travel underground
       and connect into the existing structure located within the north eastern corner of the site.
       Hence, the roofwater from the existing building was discharged to the 300mm dia. pipe
       within Lot 79 on SP138388.

Surface Runoff
    1. Surface runoff from the rear portion of Lot 1 on RP230931 generally sheet flows towards
       the adjacent site on Lot 61 on RP69404, north and east of the site.
    2. Surface runoff from the front portion of Lot 1 on RP230931 generally sheet flows towards
       the Eumundi Noosa Road kerb and channel.
    3. Surface runoff from Lot 1 on RP849431 generally sheet flows south east towards Lot 46 and
       62 on SP132578.

External Catchment
    1. There appears to be no external catchment entering the site.

4.3 Lawful Point of Discharge
If the proposed development maintains pre-development flow conditions, the lawful point of
discharge for the proposed development is the existing stormwater drainage infrastructure within
Lot 46 and 62 on SP132578, southeast of the site, the existing stormwater infrastructure within
Lot 79 on SP138388, northeast of the site, and the Eumundi Noosa Road kerb and channel.

In consideration of the site characteristics, surrounding topology and stormwater drainage
infrastructure, the aforementioned proposed lawful point of discharge is considered to be
compliant with the criteria for lawful point of discharge outlined in Section 3.9.1. of QUDM 2017
as per below:
    i) The location of the proposed discharge point is under the lawful control of the local
       government or other statutory authority from whom permission to discharge has been
       received.

    ii) The post development discharge will not cause an actionable nuisance, nor environmental
        or property damage, as it is intended to implement measures to account for any change to
        the existing flow characteristics.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 8

                                                                                 20169 - SBSMP/4
                                                                                          Page 8




    iii) Authority to discharge over affected properties will not be required as the proposed
         development will discharge directly into the existing waterway and will be maintained as
         per existing drainage conditions.

Refer to Section 5 outlining the Stormwater Quantity aspects of this site and Appendix D for the
Water Quality and Drainage Code.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 9

                                                                                        20169 - SBSMP/4
                                                                                                 Page 9




5 STORMWATER QUANTITY
A roof and allotment drainage system is to be designed to comply with:

    1. AS/NZS 3500.3:2015 - Plumbing and Drainage Part 3: Stormwater Drainage;

    2. The Queensland Urban Drainage Manual (QUDM), and;

    3. The Noosa Council Engineering Design Standards – Roads, drainage and earthworks.


5.1 Rational Method Assessment
The Rational Method has been used to calculate the peak discharges from the site under the
existing (pre development) and proposed (post development) conditions.

5.1.1 Design Storms
As defined in the Noosa Council’s Planning Scheme the following design storms were adopted:

    1. Minor Drainage System: 10 year ARI statistical flood (Q10 storm);

    2. Major Drainage System: 100 year ARI statistical flood (Q100 storm).

5.1.2 Rainfall Intensity
Rainfall intensities for this study were obtained from the Australian Bureau of Meteorology.

5.1.3 Times of Concentration
Times of concentration (tc) were calculated as defined in the QUDM. Refer to Table 5-1 for the
adopted tc’s and Appendix E for tc calculations.

                                     Table 5-1 – Adopted tc values

                                                    Catchment Catchment Catchment
                           Property State
                                                      A (tc)    B (tc)    C (tc)
                          Pre development               8.1          11.9        10.8
                          Post development              5.3           5.6         5.0


5.1.4 Runoff Coefficients
The 10 year runoff coefficient’s (C10) were determined as defined in the QUDM. Refer to Table 5-2
below for the adopted C10 values.

                                     Table 5-2 – Adopted C10 Values

                                                    Catchment Catchment Catchment
                           Property State
                                                      A (C10)   B (C10)   C (C10)
                          Pre development               0.74         0.74        0.79
                          Post development              0.84         0.83        0.90




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 10

                                                                                         20169 - SBSMP/4
                                                                                                     Page 10




5.1.5 Peak Flows
Refer to Table 5-3 for a summary of the predicted minor and major discharge rates for pre and
post development conditions and Appendix E for the Rational Method calculations.

                              Table 5-3 – Pre and Post Development Peak Flows

    Property State        Q1 (m3/s) Q2 (m3/s) Q5 (m3/s)     Q10 (m3/s)   Q20 (m3/s)   Q50 (m3/s)   Q100 (m3/s)

  Pre development A         0.048      0.057      0.086       0.107        0.127        0.162        0.186
  Post development A        0.086      0.103      0.157       0.195        0.234        0.298        0.341
  Pre development B         0.073      0.087      0.132       0.162        0.193        0.243        0.278
  Post development B        0.100      0.120      0.183       0.226        0.271        0.345        0.398
  Pre development C         0.024      0.028      0.043       0.053        0.063        0.079        0.090
  Post development C        0.011      0.013      0.020       0.025        0.030        0.037        0.040


The proposed development will result in an increase in impervious surface areas and will
consequently increase stormwater runoff peak flow rates in Catchments A and B.

Hence, it is proposed to utilise two on-site detention (OSD) systems to mitigate the stormwater
runoff of the proposed development prior to discharging to the existing stormwater infrastructure
within Lot 46 and 62 on SP132578, southeast of the site, and Lot 79 on SP138388, northeast of the
site.

Catchment C will result in a decrease in stormwater runoff peak flow rates. Therefore, no
detention is required to mitigate Catchment C. However, a rainwater reuse tank has been
proposed which will provide some mitigation.

Refer to Section 5.3 for the XPSTORM Modelling analysis of the site, Appendix E for the Stormwater
Quantity Calculations, Appendix F for the Concept Site Levels and Drainage Plan and Section 6 for
the Stormwater Quality Management Plan.

5.2 Proposed Drainage Patterns
The proposed drainage patterns are as follows (Refer to Appendix F):

Roof Catchment:
    1. Runoff from the roof catchment of Building 1 will flow via downpipes to a rainwater tank
       located at the northwest corner of the site for rainwater reuse with overflow discharging
       to the Lawful Point of Discharge within the Eumundi Noosa Road kerb and channel.
    2. Runoff from the roof catchment of Buildings 5-8 will flow via downpipes an internal
       drainage system, where it will be directed to the detention basin located at the southeast
       corner of the site prior to discharge to the Lawful Point of Discharge within Lot 46 and 62
       on SP132578.
    3. Runoff from the roof catchment of Buildings 2-4 will flow via downpipes an internal
       drainage system, where it will be directed to the detention basin located at the northeast
       corner of the site prior to discharge to the Lawful Point of Discharge within Lot 79 on
       SP138388.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 11

                                                                                         20169 - SBSMP/4
                                                                                                  Page 11




Ground Catchment:
    1. Surface runoff from the ground level hardstand and landscaping areas of the southern
       catchment will be collected by various stormwater pits connected to the internal drainage
       network, where it will be directed to the detention basin located at the southeast corner
       of the site prior to discharge to the Lawful Point of Discharge within Lot 46 and 62 on
       SP132578.

    2. Surface runoff from the ground level hardstand and landscaping areas of the northern
       catchment will be collected by various stormwater pits connected to the internal drainage
       network, where it will be directed to the detention basin located at the northeast corner
       of the site prior to discharge to the Lawful Point of Discharge within Lot 79 on SP138388.

Refer to Appendix F for the Concept Site Levels and Drainage Plan.

5.3 Downstream Pipe Infrastructure Considerations
The existing 225 to 450mm diameter stormwater line traversing the rear of Lots 45, 46 and 62 on
SP132578 and Lots 42-44 on SP144002 and the existing 300mm diameter stormwater line within
the driveway of Lot 79 on SP138388 have been modelled within PC DRAINS to determine their
capacity to take post-development mitigated flows from the development. The subsequent
longitudinal sections and calculations table have been exported from PC DRANS and outlined
within the drainage plans attached in Appendix F.

It was determined from the results of PC DRAINS modelling that the downstream stormwater
drainage infrastructure has capacity to convey up to 67L/s from southern catchment and 120L/s
from the northern catchment of the proposed development. Subsequent XPSTORM detention
modelling has taken this capacity into account.


5.4 XPSTORM Modelling
5.4.1 Intensity Frequency Distribution
The IFD data and temporal patterns used for the XPSTORM modelling has been obtained from the
Bureau of Meteorology for the following coordinates:
       Latitude -26.406
       Longitude 153.050

Refer to Appendix G for a copy of the BOM IFD data table.

5.4.2 Initial and Continuing Losses
Initial and continuing losses were approximated based on the storm losses obtained from ARR Data
Hub for the aforementioned coordinates. Refer to Table 5-4 below for the adopted initial and
continuing losses.
                           Table 5-4 – Adopted Initial and Continuing Losses

                             Designation               Initial Loss    Continuing Loss

                           Impervious Areas                0.0                   0.0
                            Pervious Areas                25.0                   2.5




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 12

                                                                                 20169 - SBSMP/4
                                                                                          Page 12




5.4.3 On-site Detention
In order for the post-development stormwater discharge conditions to match the pre-development
conditions, it is proposed to incorporate an open detention basin with a maximum storage volume
of 200kL for the southern catchment and an open detention basin with a maximum storage volume
of 160kL for the northern catchment. The detention basins are to be located above ground within
the southeast corner of the site and the northeast corner of the site, respectively.

The proposed OSD basin for the southern catchment will have the following properties:

       Specified base area = 170m2;

       Specified internal depth = 1.15m;

       Low flow orifice diameter = 0.15m;

       Overflow weir pit elevation from base of tank = 0.85m;

       Required basin volume = 179kL; and

       Provided basin volume = 200kL.

The proposed OSD basin for the northern catchment will have the following properties:

       Specified base area = 160m2;

       Specified internal depth = 1.00m;

       Low flow orifice diameter = 0.22m;

       Overflow weir pit elevation from base of tank = 0.70m;

       Required basin volume = 136kL; and

       Provided basin volume = 160kL.

The detention basin will be designed to contain all flows up to a Q100 storm event and mitigated to
the capacity of the existing stormwater infrastructure at a Q20 storm event.

Refer to Appendix F for the Concept Site Levels and Drainage Plan which details the proposed on-
site detention system.

5.4.4 Comparison of Peak Flows at Lawful Point of Discharge
The pre-development and post-development mitigated peak mean/median flow rates were
compared for the catchment and are shown in Table 5-5 below.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 13

                                                                                         20169 - SBSMP/4
                                                                                                    Page 13




                                       Table 5-5 - Comparison of Peak Flows
         XPSTORM       XPSTORM         XPSTORM       XPSTORM         XPSTORM                  XPSTORM
        Catchment A   Catchment A     Catchment B   Catchment B     Catchment C              Catchment C
  ARI       Pre-         Post-            Pre-         Post-            Pre-                    Post-
(years) development   development     development   development     development              development
           Flows    Flows (Mitigated)    Flows    Flows (Mitigated)    Flows                    Flows
           (m3/s)        (m3/s)          (m3/s)        (m3/s)          (m3/s)                   (m3/s)
   1         0.036             0.032           0.058            0.046            0.027          0.016

   2         0.043             0.038           0.071            0.056            0.030          0.018

   5         0.068             0.052           0.112            0.084            0.041          0.024

   10        0.087             0.060           0.142            0.102            0.050          0.027

   20        0.107             0.067           0.175            0.120            0.060          0.031

   50        0.129             0.084           0.210            0.137            0.070          0.031

  100        0.146             0.106           0.240            0.157            0.080          0.031


The XPSTORM hydraulic modelling has demonstrated that the proposed mitigation implemented will
maintain pre-development flows (or less) for all design storms at the LPDs located within Lot 46
and 62 on SP132578, southeast of the site, and Lot 79 on SP138388, northeast of the site. The
modelling has also demonstrated that post-development mitigated flows up to Q20 can be conveyed
through the 225 to 450mm diameter stormwater line traversing the rear of Lots 45, 46 and 62 on
SP132578 and Lots 42-44 on SP144002 and the existing 300mm diameter stormwater line within the
driveway of Lot 79 on SP138388.

Refer to Appendix H for the pre-development XPSTORM results, Appendix I for the post-
development XPSTORM results and Appendix J for the XPSTORM post-development mitigated
results.

5.4.5 Sensitivity Analysis for 1% AEP Storm Event at end of Planning Period 2100
A sensitivity analysis has been undertaken to determine the impact from a 1% AEP storm event at
end of planning period 2100 takes into account a 20% increase in rainfall intensity for climate
change. As part of the sensitivity analysis, post-development mitigated peak mean/median flow
rates were calculated in XPSTORM as a result of incorporating the 20% increase in rainfall intensity
for the catchment and are shown in Table 5-6 below for a 1% AEP storm event.

                       Table 5-6 – 2100 Post Development Mitigated Peak Flows
          XPSTORM Catchment A                XPSTORM Catchment B           XPSTORM Catchment C
 AEP
     Post-development Flows (Mitigated) Post-development Flows (Mitigated) Post-development Flows
 (%)
                  (m3/s)                             (m3/s)                        (m3/s)
   1                   0.142                                 0.201                          0.037


The XPSTORM hydraulic modelling shows that the water level exceeds the emergency weir level in
the southern basin by approximately 36mm. However, as can be seen when comparing flows
between Table 5-5 and Table 5-6, pre-development flows are still maintained for Catchment A.
There is also a 300mm wide gap between the boundary and the basin wall where emergency
overflow will fall onto natural ground level prior to sheet flowing across the boundary. Therefore,
pre-development drainage conditions are not expected to be worsened for the downstream
properties within Lot 46 and 62 on SP132578, southeast of the site.

Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 14

                                                                                 20169 - SBSMP/4
                                                                                          Page 14




The XPSTORM hydraulic modelling shows that the water level does not exceed the emergency weir
level in the northern basin and a freeboard of approximately 33mm is maintained. As can be seen
when comparing flows between Table 5-5 and Table 5-6, pre-development flows are still maintained
for Catchment B. There is also a 300mm wide gap between the boundary and the basin wall where
emergency overflow will fall onto natural ground level prior to sheet flowing across the boundary.
Therefore, pre-development drainage conditions are not expected to be worsened for the
downstream properties within Lot 79 and Lot 80 on SP138388, northeast of the site.

Furthermore, the downstream pipe capacity analysis for each legal point of discharge has taken
into account a tailwater condition of 150mm below surface at the stormwater gully pits located
within the road reserves, which is considered a conservative measure.

Therefore, XPSTORM hydraulic modelling has demonstrated that the proposed mitigation
implemented will still maintain pre-development flows (or less) for the 1% AEP storm event at end
of planning period 2100 at the aforementioned LPDs.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 15

                                                                                       20169 - SBSMP/4
                                                                                                  Page 15




6 STORMWATER QUALITY
The following section of the report will outline the potential contaminants and proposed solutions
to be incorporated during the construction and operational phases of the proposed development.


6.1 State Planning Policy Assessment
The purpose of this sub section is to determine if State Planning Policy (SPP 2017) stormwater
quality requirements, as set out by the Department of Environment and Resource Management, will
be triggered for this development. Refer to Table 6.1 for the State Planning Policy Checklist for
stormwater quality.
                               Table 6.1 – State Planning Policy Checklist

                                    Material Change of Use (MCU)                           Y/N?

            MCU for an urban purpose that involves premises ≥ 2500m 2                       Y
            AND
            Will result in 6 or more dwellings
                                                                                            Y
            OR
            Will result in impervious area greater than 25% of the net developable area.
                                                                                            Y

The development has been assessed against the latest State Planning Policy 2017 (SPP 2017). The
proposed development will entail the material change of use for urban purposes, which will involve
a land area greater than 2,500m2. Consequently, State Planning Policy 2017 (SPP 2017) is triggered.

Hence, tertiary stormwater quality treatment is warranted for this development in accordance
with the State Planning Policy 2017 (SPP 2017).


6.2 Construction Phase
Sediment generated during the construction phase shall be dealt with in accordance with an
Erosion and Sediment Control Plan and kept on site during the construction phase.

Erosion and Sediment Control (ESC) Measures such as silt fences, diversion drains, drainage
structure protection and dust control (clearing) will be implemented. Silt fences are to be erected
along the boundary of the site and around the construction area. These fences are to be cleaned
by the contractor when the capacity is reduced by 25%. Where possible, disturbance to the existing
surface is to be limited to the immediate work area. The existing ground cover is not to be stripped
until the contractor is ready for earthworks to begin.

Stockpiles and construction materials are not permitted to be stored within the road reserve and
should be contained using silt fences. Diversion drains are to be provided at upstream catchments
to reduce flows to earthworks areas. In any areas where flows could enter adjacent properties
temporary stabilisation is to be provided.

All ESC measures are to be provided as soon as earthworks have commenced and staged to suit
construction. The contractor is responsible for this action. A temporary construction exit is to be
located at each entry point to the site and will be determined based on the stage of works being
completed. The contractor is to ensure all dust tracked onto surrounding roads is immediately swept
to remove silt/dust.

All new stormwater pits are to be protected from sediment infiltration by wrapping new pits and
grates in geofabric or covering appropriately with timber board. Silt fences are to remain in place
during the maintenance period until the site is established (80% ground cover).


Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 16

                                                                                            20169 - SBSMP/4
                                                                                                        Page 16




Potential sources of contaminants identified for the construction phase of the development are
outlined in Table 6.2 together with proposed stormwater quality improvement devices,
management and maintenance procedures.

                    Table 6.2 - Potential Contaminants and Proposed Treatments

                                                                                  Proposed Treatment
                                                   Management /
        Pollutant         Potential Source                                       Device and Maintenance
                                               Maintenance Procedures
                                                                                        Procedure
      Sediment &             Excavated         Provision of sediment and         Sand filled filter socks.
        Eroded              material, fill      silt barriers to the site          Removal of excess
       material          material, exposed      drainage entry and exit           sand/silt build-up at
                         ground, stockpiles              points.                  regular intervals and
                            of material.                                           after every storm.
          Dust             Stockpiles of       Covering the material or        Coverage of material
                         material, exposed       wetting it down at           with plastic, geotextile,
                             ground.              regular intervals.         surface binding agents or
                                                                                 regular watering.
         Litter          Refuse generated      Construction waste is to        Industrial bin is to be
                             by staff.          be cleaned off the site         provided within the
                                               area and disposed of into     construction area - to be
                                                 an industrial bin then        emptied on at least a
                                                  removed by a refuse              weekly basis.
                                                 collection contractor.
        Concrete            Washing of         Provision of a closed area    Liquids to be removed by
                             concrete          onsite for washing off of        a waste collection
                          trucks/tools to          concrete slurries.         contractor. Solids to be
                              remove                                         placed into a refuse bin.
                            wet/unused
                             concrete.
       Surfactants        Washing down          No cleaning of vehicles          Monitoring & prevention
      (detergents)         operations on       will be permitted on site.
                          hardstand area
                         using detergents.
        Chemical         Typically this may      Where spills occur, the     A temporary containment
         (Paints,           occur due to         containment area is to           area. This is to be
        thinners        spillage of product.        stop escape. The           impermeable and of a
           etc.)                                material is to be treated            size to permit
                                                    (as required) and           mixing/transfer, and
                                                removed and cleaned by       with a storage volume of
                                                 a licensed contractor.            twice the largest
                                                 Minor spillage outside             container used.
                                               this area shall be cleaned     Treatment of spills is to
                                                   up with cloths and              occur on site. No
                                                disposed of to waste via        discharge of treated
                                                   the industrial bin.       water to the stormwater
                                                                                  system is to occur
                                                                             without council approval.
                                                                                 Incidents are to be
                                                                                reported to the EPA.
      Wastewater         Spillage from the       A licensed contractor          No leakage is to be
                         relocation of the     shall remove any residue       permitted to enter the
                         existing sewerage       sewage from unused          groundwater or discharge
                           reticulation.       pipes and contaminated           to the stormwater
                                                soils are to be disposed             system.
                                               of via the industrial bin.



Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 17

                                                                                         20169 - SBSMP/4
                                                                                                        Page 17




6.3 Operational Phase
The proposed development has been assessed against the latest State Planning Policy 2017 (SPP
2017). The proposed development will entail the material change of use for urban purposes, which
will involve a land area greater than 2,500m2. Consequently, State Planning Policy 2017 (SPP 2017)
is triggered and stormwater quality treatment is will be required for this development.

Water quality objectives (WQO’s) for South East Queensland as set out in State Planning Policy 2017
(SPP 2017) should be achieved by identifying and adopting best practise techniques in accordance
with the abovementioned guidelines. Refer to Table 6.3 for the target WQO’s.

                           Table 6.3 – Minimum Mean Annual Load Reductions

                                                             Minimum Mean Annual
                                    Contaminant
                                                                Load Reductions

                            Total Suspended Solids (TSS)             ≥ 80%
                               Total Phosphorus (TP)                 ≥ 60%
                                Total Nitrogen (TN)                  ≥ 45%
                               Gross Pollutants (GP)                 ≥ 90%

6.3.1 Sources of Contaminants
Potential sources of contaminants and stormwater quality improvement devices identified for the
operational phase of the development are outlined in Table 6.4

                                   Table 6.4- Sources of Contaminants

                                                 Pollutant
               Target Pollutant Type                             Acceptable Treatment Examples
                                                   Size

         Primary        Screening of gross                     Litter baskets, swales, buffer strips,
                                                 >5000um
        Pollutants          pollutants                              GPT’s, Bio-retention basins

                        Sedimentation of
        Secondary                                125um -
                        coarse to medium                       Swales, sedimentation basins, ponds
        Pollutants                               5000um
                            sediment
                                                                Bio-retention basins, constructed
                           Enhanced
                                                  10um –      wetland macrophyte zones, other bio
                      sedimentation of fine
                                                  125um         technologies, proprietary tertiary
                          particulates
                                                                   stormwater treatment dvices
         Tertiary     Adhesion and filtration                Constructed wetland macrophyte zones,
                                                 0.45um –
        Pollutants    of very fine / colloidal                 other bio technologies, proprietary
                                                   10um
                             sediment                         tertiary stormwater treatment dvices
                       Biological uptake of                  Constructed wetland macrophyte zones,
                                                 <0.45um
                        dissolved particles                          other bio technologies




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 18

                                                                                     20169 - SBSMP/4
                                                                                               Page 18




6.3.2 Proposed Treatment Train
The proposed treatment train has been modelled using the following methodology:

    1. Roofwater from Building 1 will be collected by a 15kL rainwater reuse tank with overflow to
       the Eumundi Noosa Road kerb and channel. The rainwater tank will be utilised for landscape
       irrigation only, servicing all common landscape areas and the private courtyards of Block 5.

    2. Roofwater from the rest of the proposed development will be collected by the internal
       drainage network which will subsequently direct flow to the end-of-line bio-retention basins
       for treatment.

    3. Surface runoff from the hardstand areas and landscaping areas will be collected by various
       pits. The internal drainage networks will subsequently direct flow to the end-of-line bio-
       retention basins for treatment.

All runoff described above will then discharge to the lawful points of discharge. A Concept Site
Levels and Drainage Plan of the proposed internal drainage network detailing the treatment train
assets is included in Appendix F. Refer to Table 6.5 for details of the proposed treatment train
assets.

                                Table 6.5- Proposed Treatment Assets

          Treatment          Treatment
                                                                     Description
            Level              Asset

                          Rainwater Reuse          15kL tank installed at the north western
           Primary/
                          Tank (Landscape          corner of the site, irrigating an area of
          Secondary
                           Irrigation Only)        1,570m2.


                                                  1. 40m2 Total Filter Area
                            Bio-retention
                                                  2. 0.4m Filter Media Depth
                               Basin A
          Primary/                                3. 0.2m Extended Detention Depth
         Secondary/
          Tertiary                                1. 55m2 Total Filter Area
                            Bio-retention
                                                  2. 0.4m Filter Media Depth
                               Basin B
                                                  3. 0.2m Extended Detention Depth


Refer to Appendix K for the Stormwater Quality Operation Management and Maintenance
Guidelines.

6.3.3 Pollutant Export Modelling
Following the definition of water quality objectives for the site and an assessment of the treatment
options suitable for the development, the most appropriate treatment scheme for the site was
identified. The impact of the stormwater management strategy on the quality of stormwater runoff
discharged from the site has been assessed using the pollutant export model, Model for Urban
Stormwater Improvement Conceptualisation (MUSIC).




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 19

                                                                                         20169 - SBSMP/4
                                                                                                  Page 19




6.3.4 MUSIC Modelling Parameters
The MUSIC model was set up in accordance with the Water-By-Design MUSIC Modelling Guidelines
for South East Queensland to the parameters listed in Table 6.5 and Table 6.6. Refer to Figure 6.1
for source node areas.

                                          Table 6.6 – MUSIC Parameters

                       Parameter                               Data Used

                      Rainfall Data                          40908 TEWANTIN

                  Modelling Timestep                           6 minutes

                         Routing                   No routing drain links were adopted



                             Table 6.7 – Catchment Runoff Generation Parameters

                                   Parameter                       Residential Catchment


                              Rainfall Threshold                               1

                         Soil Storage Capacity (mm)                           500

                     Initial Storage Capacity (% capacity)                    10

                             Field Capacity (mm)                              200

                      Infiltration Capacity Coefficient a                     211

                      Infiltration Capacity Coefficient b                      5

                              Initial Depth (mm)                              50

                           Daily Recharge Rate (%)                            28

                           Daily Baseflow Rate (%)                            27

                         Daily Deep Seepage Rate (%)                           0


6.3.5 MUSIC Modeling Results
Refer to Figure 6.1 for a print screen schematic of the MUSIC model for the proposed development
and Figure 6.2 for the annual pollutant loads that will be discharged from the site for the proposed
development.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 20

                                                                                 20169 - SBSMP/4
                                                                                          Page 20




                            Figure 6.1 - MUSIC Model Print Screen Schematic




                                   Figure 6.2 - MUSIC Modelling Results

The modelling results show that the pollutant reduction objectives are met for all contaminants
given in Section 6.

Should operational requirements change, this plan is required to be amended to suit. Substantial
changes may require resubmission to the local authority. Following completion of construction, this
plan is to be incorporated into the total-site management practices.


Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 21

                                                                                 20169 - SBSMP/4
                                                                                          Page 21




7 FLOODING
Information from the Noosa Council Flood Hazard Overlay Map confirms that the site is unaffected
by flooding and inundation.

Refer to Appendix L for the Noosa Council Flood Hazard Overlay Map.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 22

                                                                                 20169 - SBSMP/4
                                                                                          Page 22




8 CONCLUSION
The proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville has been
assessed for its impact on the quantity and quality of stormwater drainage.

If the proposed development maintains pre-development drainage patterns, the lawful points of
discharge are the stormwater drainage infrastructure within Lot 46 and 62 on SP132578, southeast
of the site, the existing stormwater infrastructure within Lot 79 on SP138388, northeast of the
site, and the Eumundi Noosa Road kerb and channel, west of the site.

No external catchments have been identified.

Onsite detention will be provided in the form of two detention basins to attenuate post
development peak flow rates and ensure non-worsening of flooding to properties and infrastructure
adjacent to, and downstream of the subject site. The detention basins will be designed to contain
all flows up to a Q100 storm event. The volume and configuration of the on-site detention system
will be confirmed during detailed design stage.

Sediment generated during the construction phase shall be dealt with in accordance with an
Erosion and Sediment Control Plan to be kept on site during the construction phase.

The proposed development triggers the State Planning Policy 2017 (SPP 2017). The water quality
objectives (WQO’s) for South East Queensland have therefore been achieved by treating the roof
and surface stormwater runoff via two bio-retention basins and a rainwater tank for rainwater
reuse, prior to discharging to the Lawful Points of Discharge.

The subject site is not affected by flooding.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 23

                                                                                 20169 - SBSMP/4
                                                                                          Page 23




                                            APPENDIX A


                                DETAILED SITE SURVEY PLAN




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 24

                                                                                                                                                                                                                                                                                                                                                                                                                      LEGEND
                                                                                                                                                                                                                                                                                                                                                                                                                      FENCE, GATE, BOLLARD

                                                                                                                                                                                                                                                                                                                                                                                                                      O/H ELECTRICITY, LIGHT POLE, POWER POLE

                                                                                                                                                                                                                                                                                                                                                                                                                      U/G ELECTRICITY, PIT, BOX, MANHOLE
                                                                                                                                                                      BITUMEN
                                                                                                                                                                                                             CARPARK                                                                                                                                                                                                  O/H COMMUNICATIONS, POLE
                                                                                                                                                                                                                                                                BITUMEN
                                                                                                                                                                                                                                                                             CARPARK                                                                                                                                  U/G COMMUNICATIONS, PIT, BOX, MANHOLE

                                                                                                                                                                                                                                                                                                                                                                                                                      KERB AND CHANNEL, SIGN, GULLY TRAP
                                                                                                                                   GRAVEL            DRIVEWAY                                                                                                                                                                                                                                                         SEWER PIPE, MANHOLE

                                                                                                                                                                                                                                                                                                                                                                                                                      STORM WATER PIPE, FIELD INLET, MANHOLE

                                                                                                                                                                                                                                                                                                                                                                                                                      WATER MAIN, VALVE, HYDRANT, METER

                                                                                                                                                                                                                                                                                                                                                                                                                      GAS MAIN, VALVE, METER




                                                                                                                                                                                                                  20 YED
                                                                                                                                              SHED                                                                                                                                                                                                                                                                    UNIDENTIFIED SERVICE, PIT, MANHOLE




                                                                                                                                                                                                                       )
                                                                                                                                                                                                                                                                                                                                                                                                                      INSPECTION OPENING, WITNESS MARKER




                                                                                                                                                                                                                                                        DRIVEWAY


                                                                                                                                                                                                                    21
                                                                                                                                                                                                                 DRIVEWAY




                                                                                                                                                                                                               NE VE
                                                                                                                                                                                                                                                                                                                                                                                                                      TOP OF BANK




                                                                                       Y ED
                                                                                                                                                                                                                                                                                                                                                                                                                      BOTTOM OF BANK




                                                                                                                                                                               )
                                                                                              )
                                                                                                                                                                           NUARY 2017

                                                                                                                                                                                            NE 2021)




                                                                                                                                                                                                             JU UR
                                                                                           17
                                                                                       SHOP                                                                                                                                                                                                                                                                                                                           TREE
                                                                                                                                                                                                                                                                                                                                                                                                                      TYPE GUM TREE, TRUNK DIAMETER 400mm




                                                                                     AR VEY
                                                                                                                                                                                                                                                                                                                                                                                                                      HEIGHT 15metres




                                                                                                                                                                                                                                                       GRAVEL
                                                                                                                                                                                                               GRAVEL
                                                                                                                                                                                                               (S
                                                                                                                                                                                                                                                                                                                                                                                                                      Other types: PM = Palm




                                                                                        20


                                                                                                                                                                                        (SURVEYED JU
                                                                                                                                                                                                                                                                                                                                                                                                                                   NS = Not specified




                                                                                                                                                                       (SURVEYED JA
                                                                                   NU R
                                                                                 JA (SU                                                                                                                                                                                                                                                                                        UNDERGROUND UTILITY QUALITY LEVELS
                                                                                                                                                                                                                                                                                                                                                                                                              QUALITY LEVEL A: Highest quality level, positive
                                                                                                                                                                                                                                                                                                                                                                                                              identification and absolute spatial position in three
                                                                                                                                                                                                                                                                                                                                                                                                              dimensions (eg Direct measurement and visible)
                                                                                                                                                                                                                                                                                                                                                                                                              QUALITY LEVEL B: Relative subsurface feature
                                                                                                                                                                                                                                                                                                                                                                                                              location in three dimensions (eg Electronic trace)
                                                                                                                                                                                                                                                                                                                                                                                                              QUALITY LEVEL C: Approximate location and
                                                                                                                                                                                                                   FIBRO                                                                                                                                                                                      attributes using a combination of existing records and
                                                                                                                                                                                                                  BUILDING                                                                                                                                                                                    a survey of visible evidence
                                                                                                                                                                                                                                                                                                                                                                                                              QUALITY LEVEL D: Lowest quality level. Compiled
                                                                                                                                                                                                                                                                                                                                                                                                              from any, or a combination of existing records, site
                                                                                                                                                                                                                                                                                                                                                                                                              inspections, anecdotal evidence




                                                                                                                                                                                                                                                                                                                                                                                                                                                                             NOTES

                                                                                                                                                                                                                                                                                                                                                                               (4) Prior to any demolition, excavation or construction on the site,
                                                                                                           SHED                                                                                                                                                                                                                                              NOTES                       the classification and location of these services should be
                                                                                                                                                                                                                                                                                                                                                                                    confirmed and the relevant authority should be contacted for
                                                                      RESIDENTIAL                                                                                                                                                                                     (1) This plan was prepared for the purpose and exclusive use of                                              possible location of further underground services and detailed
                                                                       DWELLING                                                                                                                                                                                        ALTUM PROPERTY GROUP and their other professional advisers




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 7/07/2021 S:\M2677\OLIVER - EUMUNDI RD\AUTOCAD\M2677-09A COMBINED DETAIL
                                                                                                                                                                                                                                                                                                                                                                                                                             locations of all services.
                                                                                                                                                                                                                                                                    and is not to be used for any other purpose or by any other person
                                                                                                                                                                                                                                                                                                                          or corporation.                                                (5) Spot heights and contours are representative of the
                                                                                                                                                                                                                                                                       JFP URBAN CONSULTANTS PTY LTD accepts no responsibility for                                            topographical terrain at time of survey; January 2017 & June 2021,
                                                                                                                                                                                                                                                                     any loss or damage arising to any person or corporation who may                                                                                           as shown on plan.
                                                                                                                                                                                                                                                                                use or rely on this plan in contravention of these terms.
                                                                                                                                                                                                                                                                                                                                                                               (6) Spot heights are not shown on this plan. Refer to the AutoCAD
                                                                                                                                                                                                                                                                       (2) The title boundaries shown on this plan were not marked at                                                drawing for all spot heights and codes in frozen layers: X-RL,
                                                                                                                                                                                                                                                                              the time of survey and have been determined from plan                                                                                            X-CODE & X-MARK.
                                                                                                                                                                                                                                                                          dimensions only and not by field survey. The dimensions and
                                                                                                                                                                                                       PROPERTY DESCRIPTION                                                    positioning of these property boundaries and any other                                              (7) Trees shown on this plan have been located only where the
                                                                                                                                                                                                                                                                    boundaries shown on this plan are not absolute and are subject to                                            trunk diameter at breast height (DBH) is 300mm or greater. Tree
                                                                                                                                                                                                       LOT 1 ON RP230931                                              an Identification Survey. Please contact this office for a quote or                                               types are estimated and tree sizes are approximate only. If
                                                                                                                                                                                                       TOTAL AREA 3740m² (Deed)                                                                                       for further advice.                                         accurate identification of tree types is to be relied upon for any
                                                                                                                                                                                                       LOT 1 ON RP849431                                                                                                                                                        purpose, then all trees shown will require on site verification by a
                                                                                                                                                                                                                                                                      (3) The Location of Underground services are in accordance with                                                                                      suitably qualified expert.
                                                                                                                                                                                                       TOTAL AREA 1748m² (Deed)                                          Australian Standard AS5488:2019, Classification of Subsurface
                                                                                                                                                                                                                                                                            Utility Information (SUI). Services shown hereon have been                                        (8) These notes form an integral part of this plan. If others use this
                                                                                                                                                                                                       LOT 61 on RP69404                                            located where possible by field survey. If not able to be so located,                                     information, they should be advised of its purpose and limitations.
                                                                                                                                                                                                       TOTAL AREA 3184m² (Deed)                                            services have been plotted from the records of the relevant
                                                                                                                                                                                                                                                                      authorities where available. However, the information shown on                                                      (9) This plan may not be reproduced unless these notes are
                                                                                                                                                                                                       LOCALITY OF NOOSAVILLE                                         these records pertinent to services location is indicative only and                                                                                                  included.
                                                                                                                                                                                                       NOOSA SHIRE COUNCIL                                              sometimes inadequate. The exact nature and location of these
                                                                                                                                                                                                                                                                                      services should be confirmed prior to construction.                                                                                                           Contour Interval: 0.5m

                                                                                                  NORTH:          SCALE:                                                                                                    ISSUES:                                                             TITLE:                                                                                                                                DETAILS:
                                                                                                                                                                                                                                                                                                                                                                                                                                      JOB NUMBER:                         PLAN:       ISSUE:
                                                                                                           N      SCALE: @ A3 1:500
                            BRISBANE - SUNSHINE COAST - CENTRAL QLD PLANNERS                                      0            5             10          15           20                  25            30       35
                                                                                                                                                                                                                                                                                                 CONTOUR & DETAIL SURVEY                                                                                                              M2677
                                                                                                                                                                                                                                                                                                                                                                                                                                      SHEET:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                         09 A
                                                                                                                  SCALE 1:500 at (A3) size
                                                                           URBAN DESIGNERS
                            SUNSHINE COAST
                            Tower 1, Level 2, 55 Plaza Parade,             SURVEYORS
                                                                                                                  THIS SCALE SHOWN IS ORIGINAL DRAWING SCALE - (A3 SIZE)
                                                                                                                                                                                                                                                                                                 ALTUM PROPERTY GROUP                                                                                                                  1 OF 1
                                                                                                                  DO NOT SCALE FROM THIS DRAWING - USE ONLY DIMENSIONS PROVIDED - IF IN DOUBT PLEASE ENQUIRE                                                                                                                                                                                                                          FILE:
                            Maroochydore, Qld 4558
                            P 07 5450 3900 W www.jfp.com.au                ENGINEERS
                                                                           LANDSCAPE ARCHITECTS
                                                                                                                  SURVEYED         JFP   CHECKED         AJM      DATUM AHD
                                                                                                                                                                                                                            A
                                                                                                                                                                                                                                                                                              99 & 101-105 EUMUNDI NOOSA ROAD                                                                                                         M2677-09A Combined Detail.dwg
C O N S U L T A N T S JFP URBAN CONSULTANTS PTY LTD ACN 050 414 045                                                                                                                                                                   ORIGINAL ISSUE                   06-07-2021      TLP                                                                                                                                            DATE:
                                                                                                                  DRAWN            TLP    APPROVED AJM            ORIGIN (BM) PM170215_RL12.12                              ISSUE:    DETAILS:                            DATE:         INIT: NOOSAVILLE                                                                                                                              6th July, 2021
                                                                                                                                                                                                                                                                                  COPYRIGHT © 2021 JFP URBAN CONSULTANTS PTY LTD. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF JFP URBAN CONSULTANTS PTY LTD.

Page 25

                                                                                 20169 - SBSMP/4
                                                                                          Page 24




                                            APPENDIX B


                            PROPOSED DEVELOPMENT PLANS




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 26

  
 
   
    
 
 
   

 
 

BLDG 04
LIL

40

LY.

  

     
  

404 =

USE I

   
  
    

REFUSE WASH DOWN

   

1
a4
i

aL7300

405
~ BLITZ

   
    
 
   
 
 

I
jn

  

 
  

a5

405

 
   
   
 
   

oe
ge

1 mm

   
  
  
  

 

2.0m 3.0m EXCLUSION ZONE

 

 

 

RL 78,000)

   
  
 

 

602 |
Si Rte

   

REFUSE WASH OOWN

REFUSE,

  
  
 
 
  

 

   

DG 01

rBLI
|

   
   

   

|
ELIE

 

    
  
 
 

7
BLDG 08

    
           
      
 
 

   

Lt

BLDG 07
702. |=

ees
cto
i
606 »

ELIE

  
 
 

   

 

 

01 SITE PLAN LEVEL 1 GROUND

1:250

 

scale: 1:250@A1 1:500 @A3

PROPOSED MULTIRESIDENTIAL DEVELOPMENT, — ALTUMCONSTRUCTIONS ——evstorwewzarrnom. > BT TAWBIBAE J/CKSON

issue: 27 date : 13-10-21

EUMU N DI NOOSA ROAD, NOOSAVILLE SITE PLAN LEVEL 1 GROUND x) ee eeffw—flllS

7186-DA02

tune The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Lt.

Page 27

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ee

‘te! |
u : Th TTE
BLDG 02

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
 
  
   

S, 511 | 512

BLDG 08) |

812 811

 

 

 

 

 

  

 

513 ce |S 514 J 515 2

f | BLDG 07
712

 

 

   
   
 

 

 

 

01 SITE PLAN LEVEL 2 UPPER
1:250

 

PROPOSED MULTIRESIDENTIAL DEVELOPMENT,

EUMUNDI NOOSA ROAD, NOOSAVILLE

ALTUM CONSTRUCTIONS

SITE PLAN LEVEL 2 UPPER

DEVELOPMENT APPROVAL

7186-DA03

oa BLICKBUINEJ/CI(SON

ARCHITECTURE | LANDSCAPE | INTERIOR | PROJECT MANAGEMENT

Page 28

                                                                                 20169 - SBSMP/4
                                                                                          Page 25




                                            APPENDIX C


                   NOOSA COUNCIL INTERACTIVE MAPPING DATA




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 29

Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying   11/27/2020
upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in the information.
                                                                                                                        1:1500

Page 30

                                                                                 20169 - SBSMP/4
                                                                                          Page 26




                                             APPENDIX D


                      NSC WATER QUALITY AND DRAINAGE CODE




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 31

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                     Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

Stormwater Drainage Design
PO1                                                      AO1                                                                   RO1
The development and its stormwater                       A stormwater management plan is prepared                              The proposal complies. Refer to the Site
management system is planned and designed                consistent with PSP6 Engineering Design                               Based Stormwater Management Plan
having regard to:                                        Standards - Roads, drainage and                                       (SBSMP) report prepared by MCE.
 (a) the natural features of the site;                   earthworks.
 (b) the need to avoid impacts and potential risks
     to ecologically important areas;
 (c) the likely effectiveness of erosion and                                                                        
     sediment control and stormwater drainage
     measures during rainfall events during and
     post construction; and
 (d) the need to protect environmental values
     and water quality of receiving waters both
     during and post construction
PO2                                                      AO2.1                                                                 RO2.1
Stormwater drainage infrastructure is planned,           Stormwater drainage planning, design and                              All stormwater design will comply with
designed and                                             construction is in accordance with PSP6                               the PSP6 Engineering Design Standards
constructed to:                                          Engineering Design Standards - Roads,                                - Roads, drainage and earthworks and
 (a) incorporate allowance for increased flood           drainage and earthworks and the latest                                the latest version of the Queensland
     risk and tidal inundation through pipework as       version of the Queensland Urban Drainage                              Urban Drainage Design Manual.
     a result of cilmate change and sea level rise;      Design Manual.
 (b) ensure the development is adequately                AO2.2                                                                 RO2.2
     drained; and                                        The stormwater drainage system connects to                            Refer to the SBSMP prepared by MCE
 (c) ensure stormwater is managed and lawfully           a lawful point of discharge in accordance                            for the lawful points of discharge.
     discharged without altering stormwater              with PSP6 Engineering Design Standards -
     drainage characteristics external to the site.      Roads, drainage and earthworks.
                                                         AO2.3                                                                 RO2.2
                                                         Stormwater flows discharging from the                                 The proposal complies. Two detention
                                                         development are demonstrated to be                                    basins will be utilised to mitigate flows
                                                         consistent with pre-development                                      prior to discharge to the legal points of
                                                         characteristics.                                                      discharge. Refer to the SBSMP prepared
                                                                                                                               by MCE.
                                                         AO2.4
                                                                                                                    N/A
                                                         Development provides for the management

1
    Solution:         Acceptable Solution                                                                                                                                                          Page 1 of 10
                A/S    Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A    Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                           Rev:      2
Site Address: 99, 101 & 105 Eumundi Noosa Road, Noosaville                                                                                                                                             13/10/2021

Page 32

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                      Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

                                                          of stormwater to incorporate appropriate
                                                          allowance for climate change impacts
                                                          (including rainfall intensity and sea level
                                                          rise), in accordance with PSP6 Engineering
                                                          Design Standards – Roads, Drainage and
                                                          Earthworks.
PO3                                                       AO3.1
Stormwater drainage infrastructure conveys run-           Stormwater drainage infrastructure meets the
off in a manner that allows roads to deliver              desired standards of service for roads
                                                                                                                     N/A
desired standards of service appropriate to the           functionality set out in PSP6 Engineering
local conditions and local stormwater drainage            Design Standards - Roads, Drainage and
characteristics.                                          Earthworks.
PO4                                                       AO4.1                                                                 RO4.1
Stormwater infrastructure is compatible with              The location, design and construction of                              Refer to RO2.1.
existing infrastructure, allows for easy access for       stormwater drainage structures is in
the ongoing maintenance by Council, is cost               accordance with PSP6 Engineering Design                    
effective across its design life.                         Standards - Roads, drainage and
                                                          earthworks.
                                                          AO4.2
                                                          Where infrastructure is located on private
                                                          land an easement is dedicated over the
                                                                                                                     N/A
                                                          infrastructure in accordance with PSP6
                                                          Engineering Design Standards - Roads,
                                                          drainage and earthworks.
                                                          AO4.3                                                                 RO4.3
                                                          Any alterations or repairs to infrastructure as                       The proposal complies.
                                                          a result of the development are made at no                 
                                                          cost to Council.
                                                          AO4.4                                                                 RO4.4
                                                          Development avoids stormwater inflow and                              The proposal complies. Stormwater will
                                                          infiltration to the sewer infrastructure                             be design to avoid inflow and infiltration
                                                          network.                                                              into the sewer infrastructure network.
                                                          AO4.5                                                                 RO4.5
                                                          Stormwater infrastructure is designed to                             The proposal complies.
                                                          minimise maintenance costs and the


1
    Solution:          Acceptable Solution                                                                                                                                                          Page 2 of 10
                A/S     Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A     Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                            Rev:      2
Site Address: 99, 101 & 105 Eumundi Noosa Road, Noosaville                                                                                                                                              13/10/2021

Page 33

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                      Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

                                                          requirement for specialized equipment for
                                                          maintenance techniques.
PO5                                                       AO5.1
Stormwater drainage infrastructure is aligned to          Stormwater drainage infrastructure avoids
avoid crossing waterways, wetlands, drainage              crossing waterways, wetlands drainage lines                N/A
lines and ecological important areas, or where it is      and ecologically important areas or follows
demonstrated this is unavoidable, disturbed areas         the edge of existing disturbed areas.
are reinstated and revegetated upon completion            AO5.2
of works.                                                 Stormwater drainage infrastructure avoids
                                                          crossing waterways, wetlands drainage lines                N/A
                                                          and ecologically important areas or follows
                                                          the edge of existing disturbed areas.
                                                          AO5.3
                                                          Temporary vehicular crossings of waterways
                                                          must be designed and constructed to be
                                                                                                                     N/A
                                                          consistent with the current International
                                                          Erosion Control Association Best Practice
                                                          Book Series.
Stormwater quality and protection of receiving waters
PO6                                                       AO6.1                                                                 RO6.1
Development is located, designed, constructed             Stormwater runoff discharging into High                               The proposal complies.
and operated to protect and enhance                       Ecological Value waters as a result of
environmental values and water quality of                 development causes no increase in gross
waterways, wetlands, lakes, ground waters and             pollutants, total suspended solids, total                  
drainage systems.                                         phosphorous or total nitrogen compared to
                                                          a pre-development scenario.
Editor’s note: Environmental values of waters             AND
and water quality objectives are prescribed in            AO6.2                                                                 RO6.1
Schedule 1 of the Environmental Protection                All stormwater runoff is treated to achieve                           The proposal complies. Two bio-retention
(Water) Policy 2009 and are identified on the             maximum removal of nutrients, gross                                   systems will be incorporated into the
State Planning Policy Interactive Mapping System          pollutants and suspended solids as                                    drainage design to achieve the target
                                                          determined by cost to efficiency ratios. (e.g.                       pollutant reduction loads. Refer to the
                                                          bioretention basins must be sized to                                  SBSMP prepared by MCE.
                                                          achieve at least 80% reduction in total
                                                          suspended solids, 60% reduction in total

1
    Solution:          Acceptable Solution                                                                                                                                                          Page 3 of 10
                A/S     Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A     Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                            Rev:      2
Site Address: 99, 101 & 105 Eumundi Noosa Road, Noosaville                                                                                                                                              13/10/2021

Page 34

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                     Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

                                                         phosphorous, 45% reduction in total nitrogen
                                                         and 90% reduction in gross pollutants >5mm)
                                                         OR
                                                         AO6.3
                                                         Developments achieve a minimum 3 drop
                                                         rating consistent with the Water by Design
                                                         Living Waterways Scoring Guide (Healthy
                                                         Land and Water).
                                                                                                                    N/A
                                                         Editor’s note— PSP6 Engineering Design
                                                         Standards - Roads, Drainage and
                                                         Earthworks provides guidance on stormwater
                                                         design and modelling requirements
PO7                                                      AO7.1                                                                 RO7.1
Water quality treatment systems use natural              Water quality treatment systems are                                   The proposal complies.
processes and materials, whenever possible, and          designed to be integrated into the landscape
are integrated into development to enhance               consistent with the technical design guideline
biodiversity and landscape benefits                      published by Healthy Land and Water Water
                                                         by Design for the feature. (eg. For                        
                                                         Bioretention Basins: Bioretention Technical
                                                         Design Guidelines (October 2014) and for
                                                         Wetland Systems the Wetland Technical
                                                         Design Guideline (May 2017).
PO8                                                      AO8.1
Water quality treatment infrastructure to be             Detailed life cycle costing is provided for the
                                                                                                                    N/A
dedicated as public assets are proven to be              entire treatment train system including
suitable for its use and of a cost                       replacement costs of asset parts.
effective and efficient standard                         AO8.2
                                                         Treatment systems dedicated as public
                                                         assets are designed to minimise
                                                         maintenance, renewal and adaption costs                    N/A
                                                         and the requirement for specialised
                                                         equipment, material or maintenance
                                                         techniques.
                                                         AO8.3
                                                                                                                    N/A
                                                         Vegetated stormwater management systems

1
    Solution:         Acceptable Solution                                                                                                                                                          Page 4 of 10
                A/S    Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A    Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                           Rev:      2
Site Address: 99, 101 & 105 Eumundi Noosa Road, Noosaville                                                                                                                                             13/10/2021

Page 35

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                     Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

                                                         to be dedicated as public assets are
                                                         established and maintained during the
                                                         maintenance period to ensure optimal
                                                         vegetated growth and that the functional
                                                         elements of the system achieve the design
                                                         function at the end of the maintenance
                                                         period.
PO9                                                      AO9.1                                                                 RO9.1
Treatment systems are designed to eliminate or           Free draining inlets and outlets are provided                         The proposal complies. The proposed
minimise health, safety and aesthetic hazards,           to ensure that waters do not pond for more                           stormwater treatment system will be
including risks associated with insect breeding,         than 24 hours.                                                        design to be free draining.
odour and public safety.                                 AO9.2                                                                 RO9.2
                                                         Developments are designed to eliminate                                A safety fence will be installed around
                                                         retaining walls in excess of 0.8m for any                             the perimeter of the basin and a lockable
                                                         water quality treatment device.                                       gate located at the maintenance access
                                                                                                                              ramp to prevent public access. In
                                                                                                                               addition, education signage will be
                                                                                                                               installed at each basin location to inform
                                                                                                                               the residences of the function each basin
                                                                                                                               provides.
Hydraulic and Waterway Stability
PO10                                                      AO10                                                                 RO10
Development prevents increased bed and bank               The development is designed to:                                      The proposal complies. Refer to the
erosion and sedimentation in receiving waterways         (a) limit the peak 1 year ARI event discharge                         SBSMP prepared by MCE.
by avoiding changes in low rate, peak flow run-off           within the receiving waterway to the pre-
and flow duration.                                           development peak 1 year discharge;
                                                         (b) maximise pervious areas by using
                                                             pervious alternatives for otherwise
                                                             impervious areas wherever possible;                    
                                                         (c) provide for capture and reuse of
                                                             stormwater for non-potable purposes for
                                                             gardening, toilet flushing, laundry and hot
                                                             water supply uses;
                                                         (d) incorporate appropriate detention
                                                             features; and

1
    Solution:         Acceptable Solution                                                                                                                                                          Page 5 of 10
                A/S    Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A    Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                           Rev:      2
Site Address: 99, 101 & 105 Eumundi Noosa Road, Noosaville                                                                                                                                             13/10/2021

Page 36

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                    Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

                                                        (e) incorporate natural channel design
                                                            principles.

                                                        Editor’s note: The Sustainable Building
                                                        Design Code includes requirements for
                                                        stormwater capture and reuse.
PO11                                                    AO11.1
Water sensitive urban design principles are             The design and construction of a natural
applied to achieve multifunctional design of            channel or natural channel rehabilitation
waterways, wetlands and drainage lines that             works are in accordance with the Natural                   N/A
provide for:                                            Channel Design Guidelines (Brisbane City
 (a) stormwater conveyance that uses natural            Council) having regard to local topography,
     channel design;                                    geology and geomorphology.
 (b) protection of landscape features and               AO11.2
     ecological important areas including               Landscape features, plant species and
     terrestrial and aquatic habitat;                   habitat types used in stormwater conveyance                N/A
 (c) aesthetic and passive recreation values;           channels are complementary to the local
 (d) flood management and conveyance of                 context and natural waterways
     external catchment stormwater through the          AO11.3
     development;                                       Bank and bed stability and planting densities
 (e) landscaping that incorporates local native                                                                    N/A
                                                        result in a stable channel over the long term
     species; and                                       and minimal potential for pest plant species.
 (f) bed and bank stability                             AO11.4
                                                        Water Sensitive Design measures are
                                                        incorporated into the development, as
                                                        detailed in the document Water Sensitive
                                                                                                                   N/A
                                                        Designs small improvements, new ideas,
                                                        concepts and sketch designs for stormwater
                                                        filtration systems (Healthy Waterways Water
                                                        by Design).
                                                        AO11.5
                                                        Floodplain management is designed in
                                                        accordance with the Framework for the
                                                                                                                   N/A
                                                        Integration of Flood and Stormwater
                                                        Management into Open Space published by
                                                        Healthy Waterways Water by Design

1
    Solution:        Acceptable Solution                                                                                                                                                          Page 6 of 10
                A/S   Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A   Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                          Rev:      2
Site Address: 99, 101 & 105 Eumundi Noosa Road, Noosaville                                                                                                                                            13/10/2021

Page 37

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                    Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

                                                        (version current at the time of development
                                                        application).
PO12                                                    AO12.1
Development protects in-stream ecology by               Where run-off from or within the site passes
maintaining pre development low flow discharge          through or drains to natural channels,
regimes and maintaining fish                            waterways or wetlands, development
passages.                                               protects in steam ecology by maintaining
                                                                                                                   N/A
                                                        pre-development low flow discharge regimes
                                                        in accordance with the frequent flow
                                                        management objectives in PSP6 Engineering
                                                        Design Standards - Roads, drainage and
                                                        earthworks
                                                        AO12.2
                                                        Instream structures such as roads, bridges,
                                                        culverts, and other stormwater infrastructure
                                                                                                                   N/A
                                                        do not cause barriers to fish passage and
                                                        facilitate the movement of terrestrial and
                                                        aquatic fauna along waterway corridors
                                                        AO12.3
                                                        Benthic substrate retains a continuous grade
                                                                                                                   N/A
                                                        with the direction of flow consistent with the
                                                        natural bed profile.
PO13                                                    AO13.1
Development is designed and constructed to              The location and form of stormwater
maintain surface and ground water balances that         discharge points do not alter the pre-                     N/A
sustain the environmental values of water               development hydrology of receiving surface
dependent ecosystems, including downstream              water or groundwater.
aquatic, riparian, wetland and terrestrial              AO13.2
ecosystems.                                             Developments located on groundwater
                                                        recharge or discharge areas are designed
                                                        and managed in accordance with a
                                                        groundwater recharge and discharge                         N/A
                                                        management plan prepared by a suitably
                                                        experienced and qualified groundwater
                                                        hydrologist. The groundwater recharge or
                                                        discharge must demonstrate that the

1
    Solution:        Acceptable Solution                                                                                                                                                          Page 7 of 10
                A/S   Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A   Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                          Rev:      2
Site Address: 99, 101 & 105 Eumundi Noosa Road, Noosaville                                                                                                                                            13/10/2021

Page 38

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                      Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

                                                          development does not affect groundwater
                                                          balances beyond the property boundaries

                                                          Editor's Note— PSP6 Engineering Design
                                                          Standards - Roads, drainage and earthworks
                                                          provides guidance on prepare a groundwater
                                                          recharge and discharge plan.
Construction and establishment of stormwater management systems
PO14                                                      AO14.1                                                                RO14.1
Construction methods provide for appropriate              An erosion and sediment control plan                                  An Erosion and Sedimentation Control
controls to avoid entry and transport of litter,          prepared in accordance with the International                         Plan shall be prepared (prior to
sediment, and associated prescribed water                 Erosion Control Association Best Practice                             commencement of construction) and
contaminants into receiving waters.                       Books demonstrates that the capture and                               maintained for the management of the
                                                          release of stormwater achieves the design                             sediment laden stormwater during the
Editor's note— Water contaminants are                     objectives listed in Table A: Construction                            construction phase in accordance with
prescribed in the                                         phase – stormwater management design                                 IECAs Best Practice guidelines.
Environmental Protection Act 1994                         objectives of the State Planning Policy
                                                          (Appendix 2).

                                                           Editor’s note— PSP6 Engineering Design
                                                           Standards - Roads, drainage and earthworks
                                                           provides guidance on requirements for
                                                           preparing an Erosion Management Plan.
                                                           AO14.2                                                               RO14.2
                                                           Construction works are designed and                                  Unnecessary disturbance to soil shall be
                                                           managed to restrict the extent of clearing and                       avoided and all soil surfaces shall remain
                                                           soil exposure to the minimum necessary for                          stabilized.
                                                           access, and safe construction at any one
                                                           time
                                                           AO14.3                                                               RO14.3
                                                           For buildings:                                                       The proposal complies. Refer to RO14.1.
                                                          (a) upstream runoff is diverted around the
                                                                construction site;                                   
                                                          (b) sediment barriers are provided
                                                                downslope of disturbed areas to prevent

1
    Solution:          Acceptable Solution                                                                                                                                                          Page 8 of 10
                A/S     Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A     Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                            Rev:      2
Site Address: 99, 101 & 105 Eumundi Noosa Road, Noosaville                                                                                                                                              13/10/2021

Page 39

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                    Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

                                                             sediment washing into gutters, drains
                                                             and waterways , wetlands or drainage
                                                             lines either on or off the site; and
                                                        (c) temporary or permanent downpipes are
                                                             connected to the stormwater system
                                                             before laying the roof; or
                                                        (d) localised erosion is avoided by directing
                                                             flow from downpipes over non-erosive
                                                             areas.
                                                         AO14.4                                                               RO14.4
                                                         Chemical flocculants used as part of an                              The proposal complies. Refer to RO14.1.
                                                         erosion and sediment control plan do not                  
                                                         harm the environmental values within
                                                         receiving waters.
                                                         AO14.5                                                               RO14.5
                                                         Appropriately sized litter containment areas,                        The proposal complies. Refer to RO14.1.
                                                         with provision for sorting recyclables are                
                                                         provided for the type of litter expected to be
                                                         generated onsite.
Wastewater management and effluent disposal
PO15                                                     AO15
Development does not discharge wastewater                Wastewater (non-sewage) generated from
unless it can be demonstrated to not compromise          the development is collected and contained
environmental values of waters and water quality         on-site, and is;
objectives.                                             (a) lawfully disposed to sewer; or
                                                        (b) transferred off-site for treatment/disposal
Editor’s Note—Environmental values of waters                 to an appropriately
and water quality objectives are prescribed in               licenced facility;                                    N/A
Schedule 1 of the Environmental Protection              (c) reused on-site in a closed-cycle irrigation
(Water) Policy 2009.                                         scheme, industrial processes, washing or
                                                             cleaning or other purpose; or
                                                        (d) treated to meet the drinking water supply
                                                             environmental values prior to release.

                                                        Editor’s Note—The Plumbing and Drainage

1
    Solution:        Acceptable Solution                                                                                                                                                          Page 9 of 10
                A/S   Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A   Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                          Rev:      2
Site Address: 99, 101 & 105 Eumundi Noosa Road, Noosaville                                                                                                                                            13/10/2021

Page 40

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                    Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

                                                         Act 2003 sets out requirements for
                                                         wastewater management.
PO16                                                     AO16
On-site effluent treatment and disposal systems          An onsite effluent system and disposal area
are designed, constructed and managed to not             is:
compromise the environmental values of waters           (a) not located on a slope greater than 1 in
and water quality objectives.                                (10%);
                                                        (b) not located at or below the 1% annual
                                                             exceedance probability (AEP flood
                                                             event);
                                                        (c) not located within a riparian buffer area
                                                             mapped on a Biodiversity, Waterways
                                                             and Wetlands Overlay Map; and
                                                        (d) setback 400 metres minimum from the
                                                             full supply level of Lake Macdonald.

                                                        Editor’s Note—The Plumbing and Drainage
                                                        Act 2003 sets out requirements for on-site
                                                        effluent treatment and disposal. The                       N/A
                                                        Queensland Plumbing and Wastewater Code
                                                        and associated
                                                        guidelines are used to confirm the suitability
                                                        of each site to accommodate an on-site
                                                        sewerage facility; or where a centrally
                                                        located group collection treatment system is
                                                        proposed, confirmation as to the suitability of
                                                        the designated site to accommodate the
                                                        onsite sewerage facility. Additionally, where
                                                        the combined total peak design capacity of
                                                        effluent treatment is less than 21 equivalent
                                                        persons, the design of the system achieves a
                                                        low to medium risk classification in
                                                        accordance with Seqwater’s Land Use Risk
                                                        Tool for onsite sewerage facilities




1
    Solution:        Acceptable Solution                                                                                                                                                        Page 10 of 10
                A/S   Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A   Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                          Rev:      2
Site Address: 99, 101 & 105 Eumundi Noosa Road, Noosaville                                                                                                                                            13/10/2021

Page 41

                                                                                 20169 - SBSMP/4
                                                                                          Page 27




                                            APPENDIX E


                       STORMWATER QUANTITY CALCULATIONS




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 42

                                                 Rational Method Peak Flow Calculations
Job No:            20169                                                                                                                                                                                                   MORGAN CONSULTING
Job Type:          Proposed Townhouse Development                                                                                                                                                                           ENGINEERS PTY LTD
Address:           99, 101 & 105 Eumundi Noosa Road                                                                                                                                                                     1 GREAT GEORGE STREET
Council:           Noosa                                                                                                                                                                                                  PADDINGTON QLD 4064


IFD Data:          26.4125 (S),153.0375 (E)                                      Minor Storm: Q10                                                                                                                               Designed:      DY
1
I10                74mm/hr                                                       Major Storm: Q100                                                                                                                               Checked:     HM

Pre-Development A                                                                                    Pre-Development B                                                      Pre-Development C

Time of Concentration

Standard Inlet Time                                                                                  Standard Inlet Time                                                    Standard Inlet Time
      Standard Inlet Time                        mins                                                    Standard Inlet Time                  mins                               Standard Inlet Time                  mins

Sheet Flow (Friends Equation)                                                                        Sheet Flow (Friends Equation)                                          Sheet Flow (Friends Equation)
     Sheet flow length (L)             27.7        m                                                    Sheet flow length (L)       77          m                               Sheet flow length (L)     34.44         m
           roughness (n)              0.035               short grass                                         roughness (n)     0.035                 short grass                     roughness (n)       0.035                short grass
              Fall of NSL             1.478       m                                                              Fall of NSL    3.248          m                                         Fall of NSL      0.644        m
     Slope of Surface (S)               5.3       %                                                     Slope of Surface (S)       4.2         %                                Slope of Surface (S)        1.9        %
                      total             8.1      mins                                                                    total    11.9        mins                                               total     10.8       mins
Concentrated Overland Flow                                                                           Concentrated Overland Flow                                             Concentrated Overland Flow
           Flow distance                          m                                                            Flow distance                   m                                      Flow distance                    m
                 velocity                  1.5   m/s                                                                 velocity           1.5   m/s                                           velocity            1.5   m/s
                    mins                   0.0   mins                                                                   mins            0.0   mins                                             mins             0.0   mins
   Surface type multiplier                 3.0                                                         Surface type multiplier          3.0                                   Surface type multiplier           3.0
                     total                 0.0   mins                                                                    total          0.0   mins                                              total           0.0   mins

Total tc                                   8.1   mins                                                Total tc                          11.9   mins                          Total tc                           10.8   mins



Runoff Volume Calculations


      Name          Area (ha)        tc             fi     C10                                          Name       Area (ha)      tc             fi    C10                     Name        Area (ha)      tc             fi        C10
                      0.265                       0.18     0.74                                                      0.467                     0.19    0.74                                  0.136                     0.55        0.79

           Total      0.265         8.1                    0.74                                            Total     0.467      11.9                   0.74                        Total     0.136       10.8                      0.79

                   Frequency                                                                                       Frequency                                                               Frequency
      ARI                            Cy            Iy                     Qy                             ARI                      Cy            Iy                Qy            ARI                       Cy            Iy                     Qy
                     Factor                               A (Ha)                                                     Factor                          A (Ha)                                  Factor                               A (Ha)
    (years)                       (Fy*C10)       (mm/h)                 (m3/s)                         (years)                 (Fy*C10)       (mm/h)            (m3/s)        (years)                  (Fy*C10)       (mm/h)                 (m3/s)
                      (Fy)                                                                                            (Fy)                                                                    (Fy)
      3 mth                                                             0.024                           3 mth                                                       0.036      3 mth                                                         0.012
        1             0.800        0.589          110      0.265        0.048                             1          0.800      0.590          95     0.467         0.073         1          0.800      0.633          99         0.136      0.024
        2             0.850        0.626          124      0.265        0.057                             2          0.850      0.627          107    0.467         0.087         2          0.850      0.673          111        0.136      0.028
        5             0.950        0.699          168      0.265        0.086                             5          0.950      0.701          145    0.467         0.132         5          0.950      0.752          151        0.136      0.043
        10            1.000        0.736          197      0.265        0.107                             10         1.000      0.738          169    0.467         0.162        10          1.000      0.791          176        0.136      0.053
        20            1.050        0.773          224      0.265        0.127                             20         1.050      0.775          192    0.467         0.193        20          1.050      0.831          199        0.136      0.063
        50            1.150        0.846          259      0.265        0.162                             50         1.150      0.849          221    0.467         0.243        50          1.150      0.910          230        0.136      0.079
       100            1.200        0.883          286      0.265        0.186                            100         1.200      0.886          242    0.467         0.278       100          1.200      0.950          252        0.136      0.090




                                                                                                                                Page 1 of 1                                                                                                  10/08/2021

Page 43

                                                   Rational Method Peak Flow Calculations
Job No:           20169                                                                                                                                                                                                     MORGAN CONSULTING
Job Type:         Proposed Townhouse Development                                                                                                                                                                             ENGINEERS PTY LTD
Address:          99, 101 & 105 Eumundi Noosa Road                                                                                                                                                                       1 GREAT GEORGE STREET
Council:          Noosa                                                                                                                                                                                                    PADDINGTON QLD 4064


IFD Data:         26.4125 (S),153.0375 (E)                                  Minor Storm: Q10                                                                                                                                    Designed:     DY
1
I10               74mm/hr                                                   Major Storm: Q100                                                                                                                                   Checked:      HM

Post-Development A                                                                              Post-Development B                                                      Post-Development C

Time of Concentration

Standard Inlet Time                                                                             Standard Inlet Time                                                     Standard Inlet Time
     Standard Inlet Time                    5    mins                                                 Standard Inlet Time                  5   mins                           Standard Inlet Time                  5   mins


Pipe Flow                                          m                                            Pipe Flow                                        m                      Pipe Flow                                        m
               Flow distance                46                                                                Flow distance             90                                            Flow distance
              Fall of channel                     m                                                          Fall of channel                    m                                    Fall of channel                    m
               Flow Velocity              2.5     %                                                           Flow Velocity             2.5     %                                     Flow Velocity              2.5    %
                         total            0.3    mins                                                                   total           0.6    mins                                             total            0.0   mins
Concentrated Overland Flow                                                                      Concentrated Overland Flow                                              Concentrated Overland Flow
           Flow distance                          m                                                         Flow distance                       m                                   Flow distance                       m
                 velocity                 1.5    m/s                                                              velocity              1.5    m/s                                        velocity               1.5   m/s
                    mins                  0.0    mins                                                                mins               0.0    mins                                          mins                0.0   mins
   Surface type multiplier                3.0                                                       Surface type multiplier             3.0                                 Surface type multiplier              3.0
                     total                0.0    mins                                                                 total             0.0    mins                                           total              0.0   mins

                  Total tc                5.3    mins                                                           Total tc                5.6    mins                                     Total tc                 5.0   mins



Runoff Volume Calculations

      Name         Area (ha)        tc              fi     C10                                      Name         Area (ha)         tc             fi   C10                 Name          Area (ha)         tc            fi       C10
                     0.376                        0.70     0.84                                                   0.4480                        0.64   0.83                               0.0440                         1        0.90

          Total      0.376         5.3                     0.84                                         Total      0.448          5.6                  0.83                     Total      0.044          5.0                     0.90

                  Frequency                                                                                     Frequency                                                               Frequency
      ARI                           Cy             Iy                Qy                              ARI                           Cy            Iy              Qy          ARI                           Cy            Iy                    Qy
                    Factor                                A (Ha)                                                  Factor                              A (Ha)                              Factor                                 A (Ha)
    (years)                      (Fy*C10)        (mm/h)            (m3/s)                          (years)                      (Fy*C10)       (mm/h)          (m3/s)      (years)                      (Fy*C10)       (mm/h)                (m3/s)
                     (Fy)                                                                                          (Fy)                                                                    (Fy)
      3 mth                                                        0.043                            3 mth                                                      0.050       3 mth                                                             0.005
         1           0.800        0.672           123     0.376    0.086                              1            0.800         0.662          121    0.448   0.100         1             0.800         0.721          124      0.044       0.011
         2           0.850        0.714           138     0.376    0.103                              2            0.850         0.704          137    0.448   0.120         2             0.850         0.766          140      0.044       0.013
         5           0.950        0.798           189     0.376    0.157                              5            0.950         0.787          187    0.448   0.183         5             0.950         0.856          191      0.044       0.020
        10           1.000        0.840           222     0.376    0.195                              10           1.000         0.828          220    0.448   0.226         10            1.000         0.901          225      0.044       0.025
        20           1.050        0.882           254     0.376    0.234                              20           1.050         0.869          251    0.448   0.271         20            1.050         0.946          257      0.044       0.030
        50           1.150        0.966           295     0.376    0.298                              50           1.150         0.952          291    0.448   0.345         50            1.150         1.000          299      0.044       0.037
       100           1.200        1.000           327     0.376    0.341                             100           1.200         0.994          322    0.448   0.398        100            1.200         1.000          331      0.044       0.040




                                                                                                                                 Page 1 of 1                                                                                                10/08/2021

Page 44

                                                                                 20169 - SBSMP/4
                                                                                          Page 28




                                            APPENDIX F


                    CONCEPT SITE LEVELS AND DRAINAGE PLAN




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 45

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retai ned or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 46

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retai ned or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 47

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retai ned or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 48

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retai ned or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 49

             ³                             ³                        ³   ³   ³   ³




                           ³                                    ³




                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retai ned or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 50

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retai ned or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 51

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          reta ined o r used wi tho ut the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 52

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          reta ined o r used wi tho ut the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 53

                                                                                 20169 - SBSMP/4
                                                                                          Page 29




                                             APPENDIX G


                                           BOM IFD DATA




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 54

Copyright Commonwealth of Australia 2016 Bureau of Meteorology (ABN 92 637 533 532)

IFD Design Rainfall Intensity (mm/h)
Issued:             27-Nov-20
Location Label:
Requested Latitude
            coordinate:            -26.40668 Longitude 153.0497
Nearest gridLatitude
             cell:             26.4125 (S)   Longitude 153.0375 (E)

                             Annual Exceedance Probability (AEP)
Duration   Duration in min        63.20%       50%          20%       10%       5%     2%     1%
1 min                      1           170      193          262       306      349    403    444
2 min                      2           144      164          227       270      312    369    414
3 min                      3           136      154          212       252      290    342    381
4 min                      4           129      147          201       237      272    319    354
5 min                      5           124      140          191       225      257    299    331
10 min                    10           101      114          154       180      204    235    258
15 min                    15          85.7     96.9          131       152      173    199    217
20 min                    20          74.8     84.6          114       133      151    174    191
25 min                    25          66.7     75.4          102       119      136    157    172
30 min                    30          60.4     68.3         92.6       109      124    143    158
45 min                    45          47.7     54.2           74      87.2      100    117    129
1 hour                    60          40.1     45.6         62.7      74.3     85.5    100    112
1.5 hour                  90          31.1     35.5         49.5        59     68.4     81   90.7
2 hour                   120            26     29.8         41.8      50.1     58.3   69.5   78.1
3 hour                   180          20.2     23.2           33      39.8     46.7     56   63.2
4.5 hour                 270          15.7     18.2         26.2      31.8     37.4   45.1   51.2
6 hour                   360          13.2     15.3         22.2      27.1       32   38.7     44
9 hour                   540          10.3       12         17.7      21.6     25.7   31.2   35.6
12 hour                  720          8.68     10.2           15      18.4     21.9   26.7   30.5
18 hour                 1080          6.78     7.96         11.8      14.6     17.5   21.4   24.5
24 hour                 1440          5.67     6.65         9.93      12.3     14.8   18.2   20.9
30 hour                 1800          4.91     5.76         8.63      10.7     12.9   15.9   18.4
36 hour                 2160          4.35     5.11         7.66      9.55     11.5   14.3   16.5
48 hour                 2880          3.57     4.19          6.3      7.88     9.55   11.9   13.9
72 hour                 4320          2.66     3.12          4.7      5.91      7.2   9.05   10.6
96 hour                 5760          2.14      2.5         3.77      4.75      5.8   7.33    8.6
120 hour                7200           1.8      2.1         3.16      3.98     4.86   6.15   7.23
144 hour                8640          1.55     1.82         2.72      3.43     4.19   5.29    6.2
168 hour               10080          1.37      1.6          2.4      3.02     3.68   4.62   5.41


[OCR of page images]
Copyright Commonwealth of Australia 2016 Bureau of Meteorology (ABN 92 637 533 532)

IFD Design Rainfall Intensity (mm/h)
Issued: 27-Nov-20
Location Label:

Requested Latitude

Nearest griLatitude

Annual Exceedance Probability (AEP)
63.20%

Duration Duration in min

1 min 1
2 min 2
3 min 3
4 min 4
5 min 5
10 min 10
15 min 15
20 min 20
25 min 25
30 min 30
45 min 45
1 hour 60
1.5 hour 90
2 hour 120
3 hour 180
4.5 hour 270
6 hour 360
9 hour 540
12 hour 720
18 hour 1080
24 hour 1440
30 hour 1800
36 hour 2160
48 hour 2880
72 hour 4320
96 hour 5760
120 hour 7200
144 hour 8640
168 hour 10080

26.4125 (S)

170
144
136
129
124
101

85.7

74.8

66.7

60.4

47.7

40.1

31.1

26

20.2

15.7

13.2

10.3

8.68

6.78

5.67

4.91

4.35

3.57

2.66

2.14

1.8

1.55

1.37

-26.40668 Longitude
Longitude 153.0375 (E)

50%
193
164
154
147
140
114

96.9

84.6

75.4

68.3

54.2

45.6

35.5

29.8

23.2

18.2

15.3

12

10.2

7.96

6.65

5.76

5.11

4.19

3.12

2.5
2.1
1.82
1.6

153.0497

20%
262
227
212
201
191
154
131
114
102

92.6

74

62.7

49.5

41.8

33

26.2

22.2

17.7

15

11.8

9.93

8.63

7.66

6.3
4.7

3.77

3.16

2.72

2.4

10%
306
270
252
237
225
180
152
133
119
109

87.2

74.3

59

50.1

39.8

31.8

27.1

21.6

18.4

14.6

12.3

10.7

9.55

7.88

5.91

4.75

3.98

3.43

3.02

5%
349
312
290
272
257
204
173
151
136
124
100

85.5
68.4
58.3
46.7
37.4

32
25.7
21.9
17.5
14.8
12.9
11.5
9.55

7.2

5.8
4.86
4.19
3.68

2%
403
369
342
319
299
235
199
174
157
143
117
100
81
69.5
56
45.1
38.7
31.2
26.7
21.4
18.2
15.9
14.3
11.9
9.05
7.33
6.15
5.29
4.62

1%
444
414
381
354
331
258
217
191
172
158
129
112
90.7
78.1
63.2
51.2
44
35.6
30.5
24.5
20.9
18.4
16.5
13.9
10.6
8.6
7.23
6.2

5.41

Page 55

                                                                                 20169 - SBSMP/4
                                                                                          Page 30




                                             APPENDIX H


                       XPSTORM PRE DEVELOPMENT RESULTS




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

Page 56

 1                      INNOVYZE ENSEMBLE STATISTICS UTILITY
 2                          (c) Innovyze 2020
 3
 4   Summary information:
 5
 6       Total No. of Ensembles:     63
 7       No. of Storms per ensemble: 10
 8       No. of AEP Bands:           7
 9       Object Name:                Pre Dev A to LPD
10       Result type:                Max Flow
11
12
13   Results:
14
15
16                   AEP: 1% - Max Flow (m^3/s)
17   *===============================================================================================================================================================================================================*
18   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
19   *===============================================================================================================================================================================================================*
20   |       ECN_1pct_10min      0.1168      0.1129      0.1177      0.1001      0.1199      0.0985      0.1160      0.1020      0.1255      0.1119      0.1121      0.0086      0.1144                              |
21   |       ECN_1pct_15min      0.1382      0.1430      0.1179      0.1232      0.1565      0.1528      0.1339      0.1676      0.1569      0.1306      0.1420      0.0153      0.1406                              |
22   |       ECN_1pct_1_5hr      0.0988      0.1165      0.1208      0.0991      0.1223      0.1198      0.1150      0.1211      0.1086      0.1205      0.1143      0.0085      0.1182                              |
23   |         ECN_1pct_1hr      0.1826      0.1483      0.1095      0.1257      0.0926      0.1444      0.1008      0.1133      0.1245      0.1054      0.1247      0.0258      0.1189                              |
24   |       ECN_1pct_20min      0.1435      0.1950      0.1205      0.1151      0.1278      0.1414      0.1221      0.1378      0.1360      0.1592      0.1398      0.0221      0.1369                              |
25   |       ECN_1pct_25min      0.1309      0.1849      0.1345      0.1461      0.1457      0.1339      0.1281      0.1540      0.1308      0.1681      0.1457      0.0177      0.1401                              |
26   |         ECN_1pct_2hr      0.1317      0.0976      0.0978      0.1174      0.1156      0.1073      0.0825      0.0875      0.1002      0.1265      0.1064      0.0154      0.1037                              |
27   |       ECN_1pct_30min      0.1486      0.1342      0.1902      0.1200      0.1236      0.1267      0.1360      0.1404      0.1510      0.1352      0.1406      0.0190      0.1356                              |
28   |       ECN_1pct_45min      0.1933      0.1726      0.1201      0.1579      0.1385      0.1083      0.1206      0.1474      0.0974      0.1354      0.1391      0.0281      0.1369                              |
29   *===============================================================================================================================================================================================================*
30   | CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_1pct_15min.                                                                                                                      |
31   | The median pattern for this ensemble is storm 2 (storm name : ECN_1pct_15min_2).                                                                                                                              |
32   | The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_1pct_15min_8).                                                                                                        |
33   *===============================================================================================================================================================================================================*
34
35
36                   AEP: 10% - Max Flow (m^3/s)
37   *===============================================================================================================================================================================================================*
38   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
39   *===============================================================================================================================================================================================================*
40   |      ECN_10pct_10min      0.0330      0.0339      0.0304      0.0346      0.0388      0.0355      0.0428      0.0380      0.0341      0.0465      0.0368      0.0046      0.0351                              |
41   |      ECN_10pct_15min      0.0566      0.0633      0.0658      0.0713      0.0617      0.0638      0.0636      0.0635      0.0742      0.0686      0.0652      0.0048      0.0637                              |
42   |      ECN_10pct_1_5hr      0.1022      0.0640      0.0941      0.0526      0.0703      0.0815      0.0698      0.0525      0.0589      0.0802      0.0726      0.0160      0.0700                              |
43   |        ECN_10pct_1hr      0.1088      0.0675      0.0652      0.0613      0.0615      0.0803      0.0779      0.0824      0.0613      0.1177      0.0784      0.0191      0.0727                              |
44   |      ECN_10pct_20min      0.0730      0.0694      0.0799      0.0950      0.0766      0.0897      0.0849      0.1065      0.0983      0.0787      0.0852      0.0113      0.0824                              |
45   |      ECN_10pct_25min      0.0760      0.1226      0.0749      0.0723      0.0633      0.1059      0.0791      0.0790      0.0668      0.1107      0.0851      0.0193      0.0775                              |
46   |        ECN_10pct_2hr      0.0851      0.0559      0.0737      0.1064      0.0756      0.0620      0.0800      0.0582      0.0801      0.0693      0.0746      0.0141      0.0747                              |
47   |      ECN_10pct_30min      0.0684      0.0600      0.1203      0.0804      0.0762      0.0754      0.1055      0.0810      0.0963      0.1085      0.0872      0.0185      0.0807                              |
48   |      ECN_10pct_45min      0.0796      0.0728      0.0705      0.0830      0.0864      0.0820      0.0835      0.0627      0.1165      0.1094      0.0846      0.0158      0.0825                              |
49   *===============================================================================================================================================================================================================*
50   | CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_45min.                                                                                                                    |
51   | The median pattern for this ensemble is storm 4 (storm name : ECN_10pct_45min_4).                                                                                                                             |
52   | The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_10pct_45min_9).                                                                                                       |
53   *===============================================================================================================================================================================================================*
54
55
56                   AEP: 2% - Max Flow (m^3/s)
57   *===============================================================================================================================================================================================================*
58   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
59   *===============================================================================================================================================================================================================*
60   |       ECN_2pct_10min      0.0813      0.0806      0.0821      0.0892      0.0855      0.0878      0.0827      0.0908      0.0852      0.0764      0.0842      0.0042      0.0840                              |
61   |       ECN_2pct_15min      0.1135      0.1288      0.1002      0.1114      0.1276      0.1291      0.1158      0.1357      0.1333      0.1129      0.1208      0.0110      0.1217                              |
62   |       ECN_2pct_1_5hr      0.0855      0.1026      0.1050      0.0879      0.1084      0.1064      0.0993      0.0937      0.0963      0.1068      0.0992      0.0077      0.1010                              |
63   |         ECN_2pct_1hr      0.1616      0.1317      0.0955      0.1117      0.0825      0.1277      0.0895      0.0914      0.1107      0.0836      0.1086      0.0242      0.1031                              |
64   |       ECN_2pct_20min      0.1268      0.1726      0.1037      0.1024      0.1130      0.1186      0.1106      0.1236      0.1137      0.1422      0.1227      0.0200      0.1162                              |
65   |       ECN_2pct_25min      0.1162      0.1649      0.1062      0.1291      0.1244      0.1214      0.1161      0.1391      0.1185      0.1520      0.1288      0.0172      0.1229                              |
66   |         ECN_2pct_2hr      0.1161      0.0825      0.0865      0.1037      0.1027      0.0950      0.0732      0.0777      0.0887      0.1068      0.0933      0.0132      0.0919                              |
67   |       ECN_2pct_30min      0.1334      0.1209      0.1716      0.1084      0.0981      0.0856      0.1231      0.1269      0.1364      0.1200      0.1224      0.0222      0.1220                              |
68   |       ECN_2pct_45min      0.1728      0.1484      0.1071      0.1415      0.1241      0.0956      0.1061      0.1193      0.0876      0.1122      0.1215      0.0247      0.1157                              |
69   *===============================================================================================================================================================================================================*
70   | CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_25min.                                                                                                                      |
71   | The median pattern for this ensemble is storm 5 (storm name : ECN_2pct_25min_5).                                                                                                                              |
72   | The pattern with the greatest <Max Flow> for this ensemble is storm 2 (storm name : ECN_2pct_25min_2).                                                                                                        |
73   *===============================================================================================================================================================================================================*
74
75
76                   AEP: 20% - Max Flow (m^3/s)
77   *===============================================================================================================================================================================================================*
78   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
79   *===============================================================================================================================================================================================================*
80   |      ECN_20pct_10min      0.0242      0.0255      0.0254      0.0288      0.0234      0.0243      0.0253      0.0262      0.0270      0.0239      0.0254      0.0015      0.0254                              |
81   |      ECN_20pct_15min      0.0372      0.0366      0.0394      0.0340      0.0380      0.0362      0.0399      0.0430      0.0434      0.0493      0.0397      0.0042      0.0387                              |


[OCR of page images]
INNOVYZE ENSEMBLE STATISTICS UTILITY
(c) Innovyze 2020

 

Summary information:

 

6 Total No. of Ensembles: 63

 

7 No. of Storms per ensemble: 10
8 No. of AEP Bands: 7

9 Object Name: Pre Dev A to LPD
0 Result type: Max Flow

2

13. Results:

 

AEP: 1% - Max Flow (m*3/s)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_lpcet_10min 0.1168 0.1129 0.1177 0.1001 0.1199 0.0985 0.1160 0.1020 0.1255 0.1119 0.1121 0.0086 0.1144
ECN_lpet_15min 0.1382 0.1430 0.1179 0.1232 0.1565 0.1528 0.1339 0.1676 0.1569 0.1306 0.1420 0.0153 0.1406
ECN_lpet_1_Shr 0.0988 0.1165 0.1208 0.0991 0.1223 0.1198 0.1150 0.1211 0.1086 0.1205 0.1143 0.0085 0.1182

ECN_lp¢et_lhr 0.1826 0.1483 0.1095 0.1257 0.0926 0.1444 0.1008 0.1133 0.1245 0.1054 0.1247 0.0258 0.1189

ECN_lpet_20min 0.1435 0.1950 0.1205 0.1151 0.1278 0.1414 0.1221 0.1378 0.1360 0.1592 0.1398 0.0221 0.1369
ECN_lpet_25min 0.1309 0.1849 0.1345 0.1461 0.1457 0.1339 0.1281 0.1540 0.1308 0.1681 0.1457 0.0177 0.1401

ECN_lpcet_2hr 0.1317 0.0976 0.0978 0.1174 0.1156 0.1073 0.0825 0.0875 0.1002 0.1265 0.1064 0.0154 0.1037
ECN_lpet_30min 0.1486 0.1342 0.1902 0.1200 0.1236 0.1267 0.1360 0.1404 0.1510 0.1352 0.1406 0.0190 0.1356
ECN_lpet_45min 0.1933 0.1726 0.1201 0.1579 0.1385 0.1083 0.1206 0.1474 0.0974 0.1354 0.1391 0.0281 0.1369
CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_lpct_15min.
The median pattern for this ensemble is storm 2 (storm name : ECN_Ipct_15min_2).
The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_lpct_15min_8).
AEP: 10% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_10pet_10min 0.0330 0.0339 0.0304 0.0346 0.0388 0.0355 0.0428 0.0380 0.0341 0.0465 0.0368 0.0046 0.0351
ECN_10pet_15min 0.0566 0.0633 0.0658 0.0713 0.0617 0.0638 0.0636 0.0635 0.0742 0.0686 0.0652 0.0048 0.0637
ECN_10pet_1_Shr 0.1022 0.0640 0.0941 0.0526 0.0703 0.0815 0.0698 0.0525 0.0589 0.0802 0.0726 0.0160 0.0700

ECN_10pet_1hr 0.1088 0.0675 0.0652 0.0613 0.0615 0.0803 0.0779 0.0824 0.0613 0.1177 0.0784 0.0191 0.0727
ECN_10pet_20min 0.0730 0.0694 0.0799 0.0950 0.0766 0.0897 0.0849 0.1065 0.0983 0.0787 0.0852 0.0113 0.0824
ECN_10pet_25min 0.0760 0.1226 0.0749 0.0723 0.0633 0.1059 0.0791 0.0790 0.0668 0.1107 0.0851 0.0193 0.0775

ECN_10pet_2hr 0.0851 0.0559 0.0737 0.1064 0.0756 0.0620 0.0800 0.0582 0.0801 0.0693 0.0746 0.0141 0.0747
ECN_10pet_30min 0.0684 0.0600 0.1203 0.0804 0.0762 0.0754 0.1055 0.0810 0.0963 0.1085 0.0872 0.0185 0.0807
ECN_10pet_45min 0.0796 0.0728 0.0705 0.0830 0.0864 0.0820 0.0835 0.0627 0.1165 0.1094 0.0846 0.0158 0.0825

CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_1l0pct_45min.

The median pattern for this ensemble is storm 4 (storm name : ECN_10pct_45min_4).

The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_10pct_45min_9).
AEP: 2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_2pet_10min 0.0813 0.0806 0.0821 0.0892 0.0855 0.0878 0.0827 0.0908 0.0852 0.0764 0.0842 0.0042 0.0840
ECN_2pet_15min 0.1135 0.1288 0.1002 0.1114 0.1276 0.1291 0.1158 0.1357 0.1333 0.1129 0.1208 0.0110 0.1217
ECN_2pet_1_Shr 0.0855 0.1026 0.1050 0.0879 0.1084 0.1064 0.0993 0.0937 0.0963 0.1068 0.0992 0.0077 0.1010

ECN_2pet_lhr 0.1616 0.1317 0.0955 0.1117 0.0825 0.1277 0.0895 0.0914 0.1107 0.0836 0.1086 0.0242 0.1031

ECN_2pet_20min 0.1268 0.1726 0.1037 0.1024 0.1130 0.1186 0.1106 0.1236 0.1137 0.1422 0.1227 0.0200 0.1162

ECN_2pet_25min 0.1162 0.1649 0.1062 0.1291 0.1244 0.1214 0.1161 0.1391 0.1185 0.1520 0.1288 0.0172 0.1229
ECN_2pcet_2hr 0.1161 0.0825 0.0865 0.1037 0.1027 0.0950 0.0732 0.0777 0.0887 0.1068 0.0933 0.0132 0.0919
ECN_2pet_30min 0.1334 0.1209 0.1716 0.1084 0.0981 0.0856 0.1231 0.1269 0.1364 0.1200 0.1224 0.0222 0.1220
ECN_2pet_45min 0.1728 0.1484 0.1071 0.1415 0.1241 0.0956 0.1061 0.1193 0.0876 0.1122 0.1215 0.0247 0.1157
CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_25min.
The median pattern for this ensemble is storm 5 (storm name : ECN_2pct_25min_5).
The pattern with the greatest <Max Flow> for this ensemble is storm 2 (storm name : ECN_2pct_25min_2).
AEP: 20% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_20pet_10min 0.0242 0.0255 0.0254 0.0288 0.0234 0.0243 0.0253 0.0262 0.0270 0.0239 0.0254 0.0015 0.0254
ECN_20pet_15min 0.0372 0.0366 0.0394 0.0340 0.0380 0.0362 0.0399 0.0430 0.0434 0.0493 0.0397 0.0042 0.0387

Page 57

 82   |      ECN_20pct_1_5hr      0.0586      0.0835      0.0791      0.0489      0.0885      0.0419      0.0568      0.0600      0.0902      0.0716      0.0679      0.0162      0.0658                              |
 83   |        ECN_20pct_1hr      0.0695      0.0431      0.0578      0.0566      0.0768      0.0768      0.0530      0.0539      0.0896      0.0698      0.0647      0.0134      0.0637                              |
 84   |      ECN_20pct_20min      0.0567      0.0518      0.0540      0.0564      0.0520      0.0579      0.0557      0.0545      0.0595      0.0776      0.0576      0.0071      0.0561                              |
 85   |      ECN_20pct_25min      0.0519      0.0546      0.0587      0.0533      0.0745      0.0561      0.0629      0.0736      0.0868      0.0820      0.0654      0.0121      0.0608                              |
 86   |        ECN_20pct_2hr      0.0545      0.0481      0.0458      0.0567      0.0709      0.0536      0.0832      0.0503      0.0525      0.0565      0.0572      0.0108      0.0541                              |
 87   |      ECN_20pct_30min      0.1039      0.0547      0.0508      0.0645      0.0706      0.0471      0.0743      0.0598      0.0749      0.0767      0.0677      0.0156      0.0675                              |
 88   |      ECN_20pct_45min      0.0521      0.0463      0.0495      0.0636      0.0647      0.0558      0.0561      0.0658      0.0915      0.0887      0.0634      0.0147      0.0599                              |
 89   *===============================================================================================================================================================================================================*
 90   | CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_30min.                                                                                                                    |
 91   | The median pattern for this ensemble is storm 5 (storm name : ECN_20pct_30min_5).                                                                                                                             |
 92   | The pattern with the greatest <Max Flow> for this ensemble is storm 1 (storm name : ECN_20pct_30min_1).                                                                                                       |
 93   *===============================================================================================================================================================================================================*
 94
 95
 96                   AEP: 5% - Max Flow (m^3/s)
 97   *===============================================================================================================================================================================================================*
 98   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
 99   *===============================================================================================================================================================================================================*
100   |       ECN_5pct_10min      0.0500      0.0515      0.0583      0.0509      0.0597      0.0542      0.0665      0.0585      0.0518      0.0728      0.0574      0.0071      0.0562                              |
101   |       ECN_5pct_15min      0.0833      0.0817      0.0920      0.0997      0.0975      0.0860      0.0864      0.0898      0.1088      0.1004      0.0926      0.0083      0.0909                              |
102   |       ECN_5pct_1_5hr      0.1199      0.0751      0.1099      0.0714      0.0817      0.0948      0.0822      0.0612      0.0689      0.0940      0.0859      0.0177      0.0820                              |
103   |         ECN_5pct_1hr      0.1269      0.0847      0.0787      0.0762      0.0901      0.1001      0.0929      0.0993      0.0784      0.1374      0.0965      0.0197      0.0915                              |
104   |       ECN_5pct_20min      0.0851      0.0843      0.0953      0.1191      0.0967      0.1093      0.1028      0.1368      0.1394      0.0940      0.1063      0.0187      0.0998                              |
105   |       ECN_5pct_25min      0.0978      0.1476      0.0861      0.0828      0.0726      0.1357      0.0962      0.0975      0.0909      0.1330      0.1040      0.0241      0.0968                              |
106   |         ECN_5pct_2hr      0.1006      0.0662      0.0870      0.1258      0.0902      0.0728      0.0951      0.0688      0.0939      0.0932      0.0894      0.0166      0.0917                              |
107   |       ECN_5pct_30min      0.0782      0.0880      0.1428      0.0922      0.0879      0.1055      0.1369      0.1002      0.1138      0.1253      0.1071      0.0209      0.1028                              |
108   |       ECN_5pct_45min      0.0957      0.0876      0.1117      0.0958      0.1004      0.0946      0.0971      0.0728      0.1362      0.1272      0.1019      0.0176      0.0964                              |
109   *===============================================================================================================================================================================================================*
110   | CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_5pct_30min.                                                                                                                      |
111   | The median pattern for this ensemble is storm 6 (storm name : ECN_5pct_30min_6).                                                                                                                              |
112   | The pattern with the greatest <Max Flow> for this ensemble is storm 3 (storm name : ECN_5pct_30min_3).                                                                                                        |
113   *===============================================================================================================================================================================================================*
114
115
116                   AEP: 50% - Max Flow (m^3/s)
117   *===============================================================================================================================================================================================================*
118   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
119   *===============================================================================================================================================================================================================*
120   |      ECN_50pct_10min      0.0181      0.0190      0.0190      0.0196      0.0165      0.0169      0.0189      0.0180      0.0202      0.0179      0.0184      0.0011      0.0185                              |
121   |      ECN_50pct_15min      0.0190      0.0214      0.0191      0.0177      0.0154      0.0151      0.0142      0.0145      0.0177      0.0202      0.0174      0.0024      0.0177                              |
122   |      ECN_50pct_1_5hr      0.0402      0.0330      0.0554      0.0304      0.0620      0.0262      0.0398      0.0280      0.0611      0.0505      0.0427      0.0130      0.0400                              |
123   |        ECN_50pct_1hr      0.0383      0.0308      0.0266      0.0402      0.0327      0.0419      0.0376      0.0359      0.0599      0.0473      0.0391      0.0089      0.0380                              |
124   |      ECN_50pct_20min      0.0188      0.0186      0.0167      0.0180      0.0166      0.0172      0.0169      0.0150      0.0215      0.0261      0.0185      0.0030      0.0176                              |
125   |      ECN_50pct_25min      0.0241      0.0214      0.0263      0.0254      0.0330      0.0235      0.0290      0.0300      0.0367      0.0329      0.0282      0.0047      0.0277                              |
126   |        ECN_50pct_2hr      0.0370      0.0201      0.0318      0.0292      0.0499      0.0366      0.0462      0.0345      0.0361      0.0396      0.0361      0.0079      0.0364                              |
127   |      ECN_50pct_30min      0.0454      0.0301      0.0279      0.0332      0.0295      0.0297      0.0388      0.0285      0.0348      0.0359      0.0334      0.0052      0.0317                              |
128   |      ECN_50pct_45min      0.0335      0.0295      0.0353      0.0329      0.0307      0.0329      0.0349      0.0431      0.0563      0.0499      0.0379      0.0085      0.0342                              |
129   *===============================================================================================================================================================================================================*
130   | CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_50pct_1_5hr.                                                                                                                    |
131   | The median pattern for this ensemble is storm 1 (storm name : ECN_50pct_1_5hr_1).                                                                                                                             |
132   | The pattern with the greatest <Max Flow> for this ensemble is storm 5 (storm name : ECN_50pct_1_5hr_5).                                                                                                       |
133   *===============================================================================================================================================================================================================*
134
135
136                   AEP: 63.2% - Max Flow (m^3/s)
137   *===============================================================================================================================================================================================================*
138   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
139   *===============================================================================================================================================================================================================*
140   |      ECN_63pct_10min      0.0160      0.0168      0.0168      0.0173      0.0146      0.0149      0.0167      0.0158      0.0178      0.0158      0.0162      0.0010      0.0163                              |
141   |      ECN_63pct_15min      0.0168      0.0190      0.0170      0.0157      0.0136      0.0133      0.0126      0.0129      0.0157      0.0179      0.0155      0.0021      0.0157                              |
142   |      ECN_63pct_1_5hr      0.0344      0.0244      0.0478      0.0250      0.0535      0.0225      0.0342      0.0198      0.0507      0.0427      0.0355      0.0119      0.0343                              |
143   |        ECN_63pct_1hr      0.0258      0.0269      0.0184      0.0332      0.0280      0.0346      0.0327      0.0242      0.0444      0.0397      0.0308      0.0073      0.0304                              |
144   |      ECN_63pct_20min      0.0167      0.0164      0.0148      0.0122      0.0127      0.0150      0.0149      0.0127      0.0155      0.0178      0.0149      0.0018      0.0150                              |
145   |      ECN_63pct_25min      0.0126      0.0127      0.0139      0.0136      0.0178      0.0136      0.0127      0.0172      0.0199      0.0190      0.0153      0.0027      0.0137                              |
146   |        ECN_63pct_2hr      0.0316      0.0171      0.0275      0.0194      0.0431      0.0314      0.0397      0.0295      0.0295      0.0342      0.0303      0.0076      0.0304                              |
147   |      ECN_63pct_30min      0.0253      0.0174      0.0180      0.0189      0.0188      0.0180      0.0209      0.0183      0.0208      0.0248      0.0201      0.0027      0.0188                              |
148   |      ECN_63pct_45min      0.0238      0.0254      0.0302      0.0235      0.0264      0.0283      0.0274      0.0331      0.0374      0.0395      0.0295      0.0053      0.0279                              |
149   *===============================================================================================================================================================================================================*
150   | CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_1_5hr.                                                                                                                  |
151   | The median pattern for this ensemble is storm 1 (storm name : ECN_63pct_1_5hr_1).                                                                                                                             |
152   | The pattern with the greatest <Max Flow> for this ensemble is storm 5 (storm name : ECN_63pct_1_5hr_5).                                                                                                       |
153   *===============================================================================================================================================================================================================*
154


[OCR of page images]
 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

82 | ECN_20pet_1_Shr 0.0586 0.0835 0.0791 0.0489 0.0885 0.0419 0.0568 0.0600 0.0902 0.0716 0.0679 0.0162 0.0658
| ECN_20pet_lhr 0.0695 0.0431 0.0578 0.0566 0.0768 0.0768 0.0530 0.0539 0.0896 0.0698 0.0647 0.0134 0.0637
| ECN_20pet_20min 0.0567 0.0518 0.0540 0.0564 0.0520 0.0579 0.0557 0.0545 0.0595 0.0776 0.0576 0.0071 0.0561
| ECN_20pet_25min 0.0519 0.0546 0.0587 0.0533 0.0745 0.0561 0.0629 0.0736 0.0868 0.0820 0.0654 0.0121 0.0608
| ECN_20pet_2hr 0.0545 0.0481 0.0458 0.0567 0.0709 0.0536 0.0832 0.0503 0.0525 0.0565 0.0572 0.0108 0.0541
| ECN_20pet_30min 0.1039 0.0547 0.0508 0.0645 0.0706 0.0471 0.0743 0.0598 0.0749 0.0767 0.0677 0.0156 0.0675
| ECN_20pet_45min 0.0521 0.0463 0.0495 0.0636 0.0647 0.0558 0.0561 0.0658 0.0915 0.0887 0.0634 0.0147 0.0599
*
| CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_30min.
| The median pattern for this ensemble is storm 5 (storm name : ECN_20pct_30min_5).
| The pattern with the greatest <Max Flow> for this ensemble is storm 1 (storm name : ECN_20pct_30min_1).

*
AEP: 5% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median

ECN_5pet_10min 0.0500 0.0515 0.0583 0.0509 0.0597 0.0542 0.0665 0.0585 0.0518 0.0728 0.0574 0.0071 0.0562

ECN_5pet_15min 0.0833 0.0817 0.0920 0.0997 0.0975 0.0860 0.0864 0.0898 0.1088 0.1004 0.0926 0.0083 0.0909

ECN_5pet_1_5hr 0.1199 0.0751 0.1099 0.0714 0.0817 0.0948 0.0822 0.0612 0.0689 0.0940 0.0859 0.0177 0.0820

ECN_5pet_lhr 0.1269 0.0847 0.0787 0.0762 0.0901 0.1001 0.0929 0.0993 0.0784 0.1374 0.0965 0.0197 0.0915

ECN_5pet_20min 0.0851 0.0843 0.0953 0.1191 0.0967 0.1093 0.1028 0.1368 0.1394 0.0940 0.1063 0.0187 0.0998

ECN_5pet_25min 0.0978 0.1476 0.0861 0.0828 0.0726 0.1357 0.0962 0.0975 0.0909 0.1330 0.1040 0.0241 0.0968

ECN_5pcet_2hr 0.1006 0.0662 0.0870 0.1258 0.0902 0.0728 0.0951 0.0688 0.0939 0.0932 0.0894 0.0166 0.0917
ECN_5pet_30min 0.0782 0.0880 0.1428 0.0922 0.0879 0.1055 0.1369 0.1002 0.1138 0.1253 0.1071 0.0209 0.1028
ECN_5pet_45min 0.0957 0.0876 0.1117 0.0958 0.1004 0.0946 0.0971 0.0728 0.1362 0.1272 0.1019 0.0176 0.0964
CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_5pct_30min.
The median pattern for this ensemble is storm 6 (storm name : ECN_Spct_30min_6).
The pattern with the greatest <Max Flow> for this ensemble is storm 3 (storm name : ECN_Spct_30min_3).
AEP: 50% - Max Flow (m*3/s)
*
lig | Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
19
120, | ECN_S0pet_10min 0.0181 0.0190 0.0190 0.0196 0.0165 0.0169 0.0189 0.0180 0.0202 0.0179 0.0184 0.0011 0.0185
121 | ECN_50pet_15min 0.0190 0.0214 0.0191 0.0177 0.0154 0.0151 0.0142 0.0145 0.0177 0.0202 0.0174 0.0024 0.0177
122 | ECN_50pet_1_5hr 0.0402 0.0330 0.0554 0.0304 0.0620 0.0262 0.0398 0.0280 0.0611 0.0505 0.0427 0.0130 0.0400
123 | ECN_50pet_lhr 0.0383 0.0308 0.0266 0.0402 0.0327 0.0419 0.0376 0.0359 0.0599 0.0473 0.0391 0.0089 0.0380
| ECN_50pcet_20min 0.0188 0.0186 0.0167 0.0180 0.0166 0.0172 0.0169 0.0150 0.0215 0.0261 0.0185 0.0030 0.0176
| ECN_50pet_25min 0.0241 0.0214 0.0263 0.0254 0.0330 0.0235 0.0290 0.0300 0.0367 0.0329 0.0282 0.0047 0.0277
| ECN_50pet_2hr 0.0370 0.0201 0.0318 0.0292 0.0499 0.0366 0.0462 0.0345 0.0361 0.0396 0.0361 0.0079 0.0364
| ECN_50pet_30min 0.0454 0.0301 0.0279 0.0332 0.0295 0.0297 0.0388 0.0285 0.0348 0.0359 0.0334 0.0052 0.0317
| ECN_50pet_45min 0.0335 0.0295 0.0353 0.0329 0.0307 0.0329 0.0349 0.0431 0.0563 0.0499 0.0379 0.0085 0.0342
*
| CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_SQpct_1_ Shr.
| The median pattern for this ensemble is storm 1 (storm name : ECN_SOpct_1_Shr_1).
| The pattern with the greatest <Max Flow> for this ensemble is storm 5 (storm name : ECN_50pct_1_5hr_5).
*
AEP: 63.2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_63pct_10min 0.0160 0.0168 0.0168 0.0173 0.0146 0.0149 0.0167 0.0158 0.0178 0.0158 0.0162 0.0010 0.0163
ECN_63pcet_15min 0.0168 0.0190 0.0170 0.0157 0.0136 0.0133 0.0126 0.0129 0.0157 0.0179 0.0155 0.0021 0.0157
ECN_63pet_1_Shr 0.0344 0.0244 0.0478 0.0250 0.0535 0.0225 0.0342 0.0198 0.0507 0.0427 0.0355 0.0119 0.0343

ECN_63pet_lhr 0.0258 0.0269 0.0184 0.0332 0.0280 0.0346 0.0327 0.0242 0.0444 0.0397 0.0308 0.0073 0.0304
ECN_63pcet_20min 0.0167 0.0164 0.0148 0.0122 0.0127 0.0150 0.0149 0.0127 0.0155 0.0178 0.0149 0.0018 0.0150
ECN_63pet_25min 0.0126 0.0127 0.0139 0.0136 0.0178 0.0136 0.0127 0.0172 0.0199 0.0190 0.0153 0.0027 0.0137

ECN_63pet_2hr 0.0316 0.0171 0.0275 0.0194 0.0431 0.0314 0.0397 0.0295 0.0295 0.0342 0.0303 0.0076 0.0304
ECN_63pcet_30min 0.0253 0.0174 0.0180 0.0189 0.0188 0.0180 0.0209 0.0183 0.0208 0.0248 0.0201 0.0027 0.0188
ECN_63pcet_45min 0.0238 0.0254 0.0302 0.0235 0.0264 0.0283 0.0274 0.0331 0.0374 0.0395 0.0295 0.0053 0.0279

 

CRITICAL DURATION

The critical duration for the 63.2%

The median pattern for this ensemble is storm 1
The pattern with the greatest <Max Flow> for this ensemble is storm 5 (storm name

(storm name

AEP is the ensemble
ECN_63pct_1_5hr_1).

ECN_63pet_1_5hr.

ECN_63pcet_1_5hr_5).

 

 

Page 58

 1                      INNOVYZE ENSEMBLE STATISTICS UTILITY
 2                          (c) Innovyze 2020
 3
 4   Summary information:
 5
 6       Total No. of Ensembles:     63
 7       No. of Storms per ensemble: 10
 8       No. of AEP Bands:           7
 9       Object Name:                Pre Dev B to LPD 2
10       Result type:                Max Flow
11
12
13   Results:
14
15
16                   AEP: 1% - Max Flow (m^3/s)
17   *===============================================================================================================================================================================================================*
18   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
19   *===============================================================================================================================================================================================================*
20   |       ECN_1pct_10min      0.1703      0.1658      0.1716      0.1501      0.1759      0.1477      0.1702      0.1499      0.1874      0.1630      0.1652      0.0122      0.1680                              |
21   |       ECN_1pct_15min      0.2243      0.2227      0.1976      0.1992      0.2389      0.2399      0.2178      0.2467      0.2414      0.2128      0.2241      0.0166      0.2235                              |
22   |       ECN_1pct_1_5hr      0.1665      0.1968      0.2012      0.1709      0.2116      0.2087      0.1931      0.1847      0.1886      0.2081      0.1930      0.0148      0.1950                              |
23   |         ECN_1pct_1hr      0.3033      0.2538      0.1846      0.2122      0.1616      0.2452      0.1728      0.1768      0.2136      0.1609      0.2085      0.0444      0.1984                              |
24   |       ECN_1pct_20min      0.2384      0.3109      0.1987      0.1984      0.2138      0.2246      0.2083      0.2364      0.2183      0.2663      0.2314      0.0329      0.2214                              |
25   |       ECN_1pct_25min      0.2180      0.2779      0.2085      0.2393      0.2407      0.2277      0.2211      0.2545      0.2202      0.2871      0.2395      0.0250      0.2335                              |
26   |         ECN_1pct_2hr      0.2146      0.1583      0.1669      0.1959      0.2004      0.1844      0.1428      0.1511      0.1706      0.1988      0.1784      0.0227      0.1775                              |
27   |       ECN_1pct_30min      0.2421      0.2204      0.3210      0.2076      0.1880      0.1891      0.2365      0.2429      0.2589      0.2243      0.2331      0.0367      0.2304                              |
28   |       ECN_1pct_45min      0.3207      0.2681      0.2023      0.2719      0.2383      0.1827      0.2032      0.2316      0.1700      0.2108      0.2300      0.0438      0.2212                              |
29   *===============================================================================================================================================================================================================*
30   | CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_1pct_25min.                                                                                                                      |
31   | The median pattern for this ensemble is storm 4 (storm name : ECN_1pct_25min_4).                                                                                                                              |
32   | The pattern with the greatest <Max Flow> for this ensemble is storm 10 (storm name : ECN_1pct_25min_10).                                                                                                      |
33   *===============================================================================================================================================================================================================*
34
35
36                   AEP: 10% - Max Flow (m^3/s)
37   *===============================================================================================================================================================================================================*
38   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
39   *===============================================================================================================================================================================================================*
40   |      ECN_10pct_10min      0.0553      0.0565      0.0589      0.0638      0.0647      0.0592      0.0715      0.0635      0.0569      0.0776      0.0628      0.0068      0.0614                              |
41   |      ECN_10pct_15min      0.0835      0.0942      0.0983      0.1046      0.0926      0.0946      0.0934      0.0934      0.1132      0.1049      0.0973      0.0079      0.0944                              |
42   |      ECN_10pct_1_5hr      0.1674      0.1051      0.1579      0.0869      0.1220      0.1397      0.1116      0.0902      0.1002      0.1340      0.1215      0.0263      0.1168                              |
43   |        ECN_10pct_1hr      0.1831      0.1125      0.1133      0.0954      0.0915      0.1216      0.1319      0.1299      0.1081      0.1974      0.1285      0.0334      0.1174                              |
44   |      ECN_10pct_20min      0.1217      0.1160      0.1262      0.1414      0.1235      0.1380      0.1305      0.1568      0.1447      0.1234      0.1322      0.0120      0.1283                              |
45   |      ECN_10pct_25min      0.1248      0.1862      0.1271      0.1231      0.1106      0.1559      0.1327      0.1332      0.1094      0.1724      0.1376      0.0244      0.1299                              |
46   |        ECN_10pct_2hr      0.1426      0.0951      0.1252      0.1788      0.1244      0.1078      0.1325      0.0989      0.1390      0.1124      0.1257      0.0234      0.1248                              |
47   |      ECN_10pct_30min      0.1198      0.0947      0.1835      0.1399      0.1285      0.1190      0.1570      0.1331      0.1645      0.1797      0.1420      0.0272      0.1365                              |
48   |      ECN_10pct_45min      0.1301      0.1255      0.1114      0.1438      0.1434      0.1424      0.1397      0.1066      0.1905      0.1839      0.1417      0.0259      0.1411                              |
49   *===============================================================================================================================================================================================================*
50   | CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_45min.                                                                                                                    |
51   | The median pattern for this ensemble is storm 6 (storm name : ECN_10pct_45min_6).                                                                                                                             |
52   | The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_10pct_45min_9).                                                                                                       |
53   *===============================================================================================================================================================================================================*
54
55
56                   AEP: 2% - Max Flow (m^3/s)
57   *===============================================================================================================================================================================================================*
58   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
59   *===============================================================================================================================================================================================================*
60   |       ECN_2pct_10min      0.1196      0.1214      0.1209      0.1341      0.1286      0.1320      0.1245      0.1335      0.1327      0.1124      0.1260      0.0070      0.1265                              |
61   |       ECN_2pct_15min      0.1762      0.1989      0.1622      0.1786      0.1893      0.1953      0.1805      0.2003      0.1998      0.1760      0.1857      0.0123      0.1849                              |
62   |       ECN_2pct_1_5hr      0.1434      0.1739      0.1757      0.1511      0.1874      0.1848      0.1591      0.1535      0.1673      0.1843      0.1680      0.0148      0.1706                              |
63   |         ECN_2pct_1hr      0.2682      0.2254      0.1643      0.1873      0.1439      0.2123      0.1534      0.1412      0.1890      0.1429      0.1828      0.0401      0.1758                              |
64   |       ECN_2pct_20min      0.2112      0.2682      0.1628      0.1783      0.1910      0.1802      0.1889      0.2094      0.1767      0.2307      0.1997      0.0297      0.1900                              |
65   |       ECN_2pct_25min      0.1897      0.2470      0.1690      0.2045      0.2043      0.2052      0.1999      0.2285      0.1980      0.2565      0.2103      0.0251      0.2044                              |
66   |         ECN_2pct_2hr      0.1881      0.1371      0.1477      0.1726      0.1774      0.1635      0.1265      0.1339      0.1513      0.1654      0.1564      0.0193      0.1574                              |
67   |       ECN_2pct_30min      0.2170      0.1985      0.2887      0.1878      0.1529      0.1442      0.2139      0.2183      0.2337      0.1930      0.2048      0.0389      0.2062                              |
68   |       ECN_2pct_45min      0.2859      0.2245      0.1810      0.2430      0.2129      0.1643      0.1721      0.1952      0.1529      0.1687      0.2001      0.0395      0.1881                              |
69   *===============================================================================================================================================================================================================*
70   | CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_30min.                                                                                                                      |
71   | The median pattern for this ensemble is storm 7 (storm name : ECN_2pct_30min_7).                                                                                                                              |
72   | The pattern with the greatest <Max Flow> for this ensemble is storm 3 (storm name : ECN_2pct_30min_3).                                                                                                        |
73   *===============================================================================================================================================================================================================*
74
75
76                   AEP: 20% - Max Flow (m^3/s)
77   *===============================================================================================================================================================================================================*
78   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
79   *===============================================================================================================================================================================================================*
80   |      ECN_20pct_10min      0.0482      0.0506      0.0506      0.0519      0.0439      0.0436      0.0503      0.0470      0.0538      0.0476      0.0488      0.0031      0.0492                              |
81   |      ECN_20pct_15min      0.0552      0.0570      0.0600      0.0535      0.0576      0.0563      0.0621      0.0668      0.0696      0.0788      0.0617      0.0075      0.0588                              |


[OCR of page images]
INNOVYZE ENSEMBLE STATISTICS UTILITY
(c) Innovyze 2020

 

Summary information:

 

6 Total No. of Ensembles: 63

 

7 No. of Storms per ensemble: 10
8 No. of AEP Bands: 7

9 Object Name: Pre Dev B to LPD 2
0 Result type: Max Flow

2

13. Results:

 

AEP: 1% - Max Flow (m*3/s)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_lpcet_10min 0.1703 0.1658 0.1716 0.1501 0.1759 0.1477 0.1702 0.1499 0.1874 0.1630 0.1652 0.0122 0.1680
ECN_lpet_15min 0.2243 0.2227 0.1976 0.1992 0.2389 0.2399 0.2178 0.2467 0.2414 0.2128 0.2241 0.0166 0.2235
ECN_lpet_1_Shr 0.1665 0.1968 0.2012 0.1709 0.2116 0.2087 0.1931 0.1847 0.1886 0.2081 0.1930 0.0148 0.1950

ECN_lp¢et_lhr 0.3033 0.2538 0.1846 0.2122 0.1616 0.2452 0.1728 0.1768 0.2136 0.1609 0.2085 0.0444 0.1984

ECN_lpet_20min 0.2384 0.3109 0.1987 0.1984 0.2138 0.2246 0.2083 0.2364 0.2183 0.2663 0.2314 0.0329 0.2214
ECN_lpet_25min 0.2180 0.2779 0.2085 0.2393 0.2407 0.2277 0.2211 0.2545 0.2202 0.2871 0.2395 0.0250 0.2335

ECN_lpcet_2hr 0.2146 0.1583 0.1669 0.1959 0.2004 0.1844 0.1428 0.1511 0.1706 0.1988 0.1784 0.0227 0.1775
ECN_lpet_30min 0.2421 0.2204 0.3210 0.2076 0.1880 0.1891 0.2365 0.2429 0.2589 0.2243 0.2331 0.0367 0.2304
ECN_lpet_45min 0.3207 0.2681 0.2023 0.2719 0.2383 0.1827 0.2032 0.2316 0.1700 0.2108 0.2300 0.0438 0.2212
CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_lpct_25min.
The median pattern for this ensemble is storm 4 (storm name : ECN_Ipct_25min_4).
The pattern with the greatest <Max Flow> for this ensemble is storm 10 (storm name : ECN_lpct_25min_10).
AEP: 10% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_10pet_10min 0.0553 0.0565 0.0589 0.0638 0.0647 0.0592 0.0715 0.0635 0.0569 0.0776 0.0628 0.0068 0.0614
ECN_10pet_15min 0.0835 0.0942 0.0983 0.1046 0.0926 0.0946 0.0934 0.0934 0.1132 0.1049 0.0973 0.0079 0.0944
ECN_10pet_1_Shr 0.1674 0.1051 0.1579 0.0869 0.1220 0.1397 0.1116 0.0902 0.1002 0.1340 0.1215 0.0263 0.1168

ECN_10pet_1hr 0.1831 0.1125 0.1133 0.0954 0.0915 0.1216 0.1319 0.1299 0.1081 0.1974 0.1285 0.0334 0.1174
ECN_10pet_20min 0.1217 0.1160 0.1262 0.1414 0.1235 0.1380 0.1305 0.1568 0.1447 0.1234 0.1322 0.0120 0.1283
ECN_10pet_25min 0.1248 0.1862 0.1271 0.1231 0.1106 0.1559 0.1327 0.1332 0.1094 0.1724 0.1376 0.0244 0.1299

ECN_10pet_2hr 0.1426 0.0951 0.1252 0.1788 0.1244 0.1078 0.1325 0.0989 0.1390 0.1124 0.1257 0.0234 0.1248
ECN_10pet_30min 0.1198 0.0947 0.1835 0.1399 0.1285 0.1190 0.1570 0.1331 0.1645 0.1797 0.1420 0.0272 0.1365
ECN_10pet_45min 0.1301 0.1255 0.1114 0.1438 0.1434 0.1424 0.1397 0.1066 0.1905 0.1839 0.1417 0.0259 0.1411

CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_45min.

The median pattern for this ensemble is storm 6 (storm name : ECN_10pct_45min_6) .

The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_10pct_45min_9).
AEP: 2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_2pet_10min 0.1196 0.1214 0.1209 0.1341 0.1286 0.1320 0.1245 0.1335 0.1327 0.1124 0.1260 0.0070 0.1265
ECN_2pet_15min 0.1762 0.1989 0.1622 0.1786 0.1893 0.1953 0.1805 0.2003 0.1998 0.1760 0.1857 0.0123 0.1849
ECN_2pet_1_Shr 0.1434 0.1739 0.1757 0.1511 0.1874 0.1848 0.1591 0.1535 0.1673 0.1843 0.1680 0.0148 0.1706

ECN_2pet_lhr 0.2682 0.2254 0.1643 0.1873 0.1439 0.2123 0.1534 0.1412 0.1890 0.1429 0.1828 0.0401 0.1758

ECN_2pet_20min 0.2112 0.2682 0.1628 0.1783 0.1910 0.1802 0.1889 0.2094 0.1767 0.2307 0.1997 0.0297 0.1900

ECN_2pet_25min 0.1897 0.2470 0.1690 0.2045 0.2043 0.2052 0.1999 0.2285 0.1980 0.2565 0.2103 0.0251 0.2044
ECN_2pcet_2hr 0.1881 0.1371 0.1477 0.1726 0.1774 0.1635 0.1265 0.1339 0.1513 0.1654 0.1564 0.0193 0.1574
ECN_2pet_30min 0.2170 0.1985 0.2887 0.1878 0.1529 0.1442 0.2139 0.2183 0.2337 0.1930 0.2048 0.0389 0.2062
ECN_2pet_45min 0.2859 0.2245 0.1810 0.2430 0.2129 0.1643 0.1721 0.1952 0.1529 0.1687 0.2001 0.0395 0.1881
CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_30min.
The median pattern for this ensemble is storm 7 (storm name : ECN_2pct_30min_7).
The pattern with the greatest <Max Flow> for this ensemble is storm 3 (storm name : ECN_2pct_30min_3).
AEP: 20% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_20pet_10min 0.0482 0.0506 0.0506 0.0519 0.0439 0.0436 0.0503 0.0470 0.0538 0.0476 0.0488 0.0031 0.0492
ECN_20pet_15min 0.0552 0.0570 0.0600 0.0535 0.0576 0.0563 0.0621 0.0668 0.0696 0.0788 0.0617 0.0075 0.0588

Page 59

 82   |      ECN_20pct_1_5hr      0.0950      0.1320      0.1326      0.0788      0.1481      0.0681      0.0959      0.0906      0.1512      0.1242      0.1116      0.0280      0.1100                              |
 83   |        ECN_20pct_1hr      0.1103      0.0757      0.0935      0.0970      0.1154      0.1228      0.0915      0.0946      0.1485      0.1195      0.1069      0.0196      0.1036                              |
 84   |      ECN_20pct_20min      0.0843      0.0797      0.0821      0.0829      0.0765      0.0853      0.0823      0.0804      0.0873      0.1155      0.0856      0.0104      0.0826                              |
 85   |      ECN_20pct_25min      0.0807      0.0822      0.0945      0.0892      0.1140      0.0894      0.0986      0.1121      0.1275      0.1219      0.1010      0.0159      0.0966                              |
 86   |        ECN_20pct_2hr      0.0890      0.0751      0.0801      0.0947      0.1246      0.0888      0.1248      0.0827      0.0881      0.0987      0.0947      0.0163      0.0889                              |
 87   |      ECN_20pct_30min      0.1575      0.0900      0.0846      0.1055      0.1088      0.0832      0.1170      0.0935      0.1121      0.1241      0.1076      0.0212      0.1072                              |
 88   |      ECN_20pct_45min      0.0913      0.0769      0.0847      0.0940      0.0963      0.0892      0.0972      0.1131      0.1533      0.1440      0.1040      0.0241      0.0952                              |
 89   *===============================================================================================================================================================================================================*
 90   | CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_1_5hr.                                                                                                                    |
 91   | The median pattern for this ensemble is storm 10 (storm name : ECN_20pct_1_5hr_10).                                                                                                                           |
 92   | The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_20pct_1_5hr_9).                                                                                                       |
 93   *===============================================================================================================================================================================================================*
 94
 95
 96                   AEP: 5% - Max Flow (m^3/s)
 97   *===============================================================================================================================================================================================================*
 98   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
 99   *===============================================================================================================================================================================================================*
100   |       ECN_5pct_10min      0.0786      0.0811      0.0883      0.0771      0.0938      0.0852      0.1043      0.0919      0.0816      0.1140      0.0896      0.0113      0.0868                              |
101   |       ECN_5pct_15min      0.1278      0.1261      0.1370      0.1473      0.1440      0.1271      0.1304      0.1326      0.1612      0.1489      0.1382      0.0111      0.1348                              |
102   |       ECN_5pct_1_5hr      0.1970      0.1239      0.1850      0.1112      0.1424      0.1630      0.1333      0.1053      0.1171      0.1572      0.1435      0.0297      0.1379                              |
103   |         ECN_5pct_1hr      0.2131      0.1370      0.1340      0.1289      0.1370      0.1572      0.1563      0.1652      0.1255      0.2315      0.1586      0.0344      0.1466                              |
104   |       ECN_5pct_20min      0.1477      0.1398      0.1580      0.1831      0.1538      0.1767      0.1655      0.2059      0.2088      0.1540      0.1693      0.0226      0.1617                              |
105   |       ECN_5pct_25min      0.1568      0.2320      0.1480      0.1429      0.1272      0.2039      0.1563      0.1581      0.1377      0.2178      0.1681      0.0344      0.1565                              |
106   |         ECN_5pct_2hr      0.1691      0.1124      0.1483      0.2134      0.1480      0.1269      0.1569      0.1171      0.1636      0.1395      0.1495      0.0279      0.1481                              |
107   |       ECN_5pct_30min      0.1372      0.1292      0.2218      0.1609      0.1528      0.1606      0.2163      0.1649      0.1924      0.2130      0.1749      0.0319      0.1629                              |
108   |       ECN_5pct_45min      0.1637      0.1483      0.1684      0.1661      0.1693      0.1647      0.1624      0.1271      0.2302      0.2135      0.1714      0.0282      0.1654                              |
109   *===============================================================================================================================================================================================================*
110   | CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_5pct_45min.                                                                                                                      |
111   | The median pattern for this ensemble is storm 4 (storm name : ECN_5pct_45min_4).                                                                                                                              |
112   | The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_5pct_45min_9).                                                                                                        |
113   *===============================================================================================================================================================================================================*
114
115
116                   AEP: 50% - Max Flow (m^3/s)
117   *===============================================================================================================================================================================================================*
118   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
119   *===============================================================================================================================================================================================================*
120   |      ECN_50pct_10min      0.0360      0.0378      0.0378      0.0383      0.0328      0.0313      0.0376      0.0338      0.0402      0.0356      0.0361      0.0026      0.0368                              |
121   |      ECN_50pct_15min      0.0377      0.0426      0.0380      0.0351      0.0293      0.0277      0.0263      0.0283      0.0337      0.0385      0.0337      0.0053      0.0344                              |
122   |      ECN_50pct_1_5hr      0.0643      0.0544      0.0908      0.0517      0.1023      0.0431      0.0663      0.0463      0.1026      0.0857      0.0707      0.0217      0.0653                              |
123   |        ECN_50pct_1hr      0.0621      0.0542      0.0423      0.0676      0.0579      0.0724      0.0652      0.0567      0.0917      0.0802      0.0650      0.0133      0.0636                              |
124   |      ECN_50pct_20min      0.0374      0.0369      0.0331      0.0297      0.0269      0.0337      0.0319      0.0272      0.0350      0.0448      0.0337      0.0051      0.0334                              |
125   |      ECN_50pct_25min      0.0351      0.0310      0.0390      0.0371      0.0518      0.0343      0.0423      0.0458      0.0569      0.0498      0.0423      0.0081      0.0407                              |
126   |        ECN_50pct_2hr      0.0594      0.0339      0.0559      0.0448      0.0871      0.0604      0.0782      0.0555      0.0593      0.0690      0.0603      0.0145      0.0593                              |
127   |      ECN_50pct_30min      0.0683      0.0460      0.0428      0.0481      0.0438      0.0454      0.0562      0.0436      0.0510      0.0523      0.0497      0.0074      0.0470                              |
128   |      ECN_50pct_45min      0.0516      0.0502      0.0597      0.0546      0.0518      0.0567      0.0580      0.0684      0.0838      0.0799      0.0615      0.0114      0.0573                              |
129   *===============================================================================================================================================================================================================*
130   | CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_50pct_1_5hr.                                                                                                                    |
131   | The median pattern for this ensemble is storm 7 (storm name : ECN_50pct_1_5hr_7).                                                                                                                             |
132   | The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_50pct_1_5hr_9).                                                                                                       |
133   *===============================================================================================================================================================================================================*
134
135
136                   AEP: 63.2% - Max Flow (m^3/s)
137   *===============================================================================================================================================================================================================*
138   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
139   *===============================================================================================================================================================================================================*
140   |      ECN_63pct_10min      0.0317      0.0334      0.0333      0.0338      0.0289      0.0276      0.0331      0.0298      0.0354      0.0313      0.0318      0.0023      0.0324                              |
141   |      ECN_63pct_15min      0.0334      0.0378      0.0337      0.0311      0.0260      0.0246      0.0233      0.0251      0.0298      0.0341      0.0299      0.0047      0.0305                              |
142   |      ECN_63pct_1_5hr      0.0547      0.0397      0.0776      0.0391      0.0878      0.0369      0.0571      0.0341      0.0796      0.0686      0.0575      0.0189      0.0559                              |
143   |        ECN_63pct_1hr      0.0382      0.0472      0.0309      0.0522      0.0475      0.0558      0.0561      0.0378      0.0722      0.0634      0.0501      0.0119      0.0499                              |
144   |      ECN_63pct_20min      0.0331      0.0326      0.0293      0.0239      0.0238      0.0298      0.0282      0.0241      0.0298      0.0335      0.0288      0.0036      0.0296                              |
145   |      ECN_63pct_25min      0.0237      0.0241      0.0263      0.0252      0.0311      0.0266      0.0223      0.0285      0.0341      0.0309      0.0273      0.0036      0.0265                              |
146   |        ECN_63pct_2hr      0.0503      0.0290      0.0481      0.0327      0.0736      0.0517      0.0673      0.0471      0.0469      0.0583      0.0505      0.0130      0.0492                              |
147   |      ECN_63pct_30min      0.0412      0.0254      0.0269      0.0281      0.0271      0.0269      0.0306      0.0285      0.0302      0.0369      0.0302      0.0048      0.0283                              |
148   |      ECN_63pct_45min      0.0369      0.0423      0.0484      0.0352      0.0431      0.0471      0.0417      0.0517      0.0549      0.0594      0.0461      0.0073      0.0451                              |
149   *===============================================================================================================================================================================================================*
150   | CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_1_5hr.                                                                                                                  |
151   | The median pattern for this ensemble is storm 7 (storm name : ECN_63pct_1_5hr_7).                                                                                                                             |
152   | The pattern with the greatest <Max Flow> for this ensemble is storm 5 (storm name : ECN_63pct_1_5hr_5).                                                                                                       |
153   *===============================================================================================================================================================================================================*
154


[OCR of page images]
 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

82 | ECN_20pet_1_Shr 0.0950 0.1320 0.1326 0.0788 0.1481 0.0681 0.0959 0.0906 0.1512 0.1242 0.1116 0.0280 0.1100
| ECN_20pet_lhr 0.1103 0.0757 0.0935 0.0970 0.1154 0.1228 0.0915 0.0946 0.1485 0.1195 0.1069 0.0196 0.1036
| ECN_20pet_20min 0.0843 0.0797 0.0821 0.0829 0.0765 0.0853 0.0823 0.0804 0.0873 0.1155 0.0856 0.0104 0.0826
| ECN_20pet_25min 0.0807 0.0822 0.0945 0.0892 0.1140 0.0894 0.0986 0.1121 0.1275 0.1219 0.1010 0.0159 0.0966
| ECN_20pet_2hr 0.0890 0.0751 0.0801 0.0947 0.1246 0.0888 0.1248 0.0827 0.0881 0.0987 0.0947 0.0163 0.0889
| ECN_20pet_30min 0.1575 0.0900 0.0846 0.1055 0.1088 0.0832 0.1170 0.0935 0.1121 0.1241 0.1076 0.0212 0.1072
| ECN_20pet_45min 0.0913 0.0769 0.0847 0.0940 0.0963 0.0892 0.0972 0.1131 0.1533 0.1440 0.1040 0.0241 0.0952
*
| CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_1_ Shr.
| The median pattern for this ensemble is storm 10 (storm name : ECN_20pct_1_Shr_10).
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_20pct_1_5hr_9).

*
AEP: 5% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median

ECN_5pet_10min 0.0786 0.0811 0.0883 0.0771 0.0938 0.0852 0.1043 0.0919 0.0816 0.1140 0.0896 0.0113 0.0868

ECN_5pet_15min 0.1278 0.1261 0.1370 0.1473 0.1440 0.1271 0.1304 0.1326 0.1612 0.1489 0.1382 0.0111 0.1348

ECN_5pet_1_5hr 0.1970 0.1239 0.1850 0.1112 0.1424 0.1630 0.1333 0.1053 0.1171 0.1572 0.1435 0.0297 0.1379

ECN_5pet_lhr 0.2131 0.1370 0.1340 0.1289 0.1370 0.1572 0.1563 0.1652 0.1255 0.2315 0.1586 0.0344 0.1466

ECN_5pet_20min 0.1477 0.1398 0.1580 0.1831 0.1538 0.1767 0.1655 0.2059 0.2088 0.1540 0.1693 0.0226 0.1617

ECN_5pet_25min 0.1568 0.2320 0.1480 0.1429 0.1272 0.2039 0.1563 0.1581 0.1377 0.2178 0.1681 0.0344 0.1565

ECN_5pcet_2hr 0.1691 0.1124 0.1483 0.2134 0.1480 0.1269 0.1569 0.1171 0.1636 0.1395 0.1495 0.0279 0.1481
ECN_5pet_30min 0.1372 0.1292 0.2218 0.1609 0.1528 0.1606 0.2163 0.1649 0.1924 0.2130 0.1749 0.0319 0.1629
ECN_5pet_45min 0.1637 0.1483 0.1684 0.1661 0.1693 0.1647 0.1624 0.1271 0.2302 0.2135 0.1714 0.0282 0.1654
CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_5pct_45min.
The median pattern for this ensemble is storm 4 (storm name : ECN_Spct_45min_4).
The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_Spct_45min_9).
AEP: 50% - Max Flow (m*3/s)
*
lig | Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
19
120, | ECN_S0pet_10min 0.0360 0.0378 0.0378 0.0383 0.0328 0.0313 0.0376 0.0338 0.0402 0.0356 0.0361 0.0026 0.0368
121 | ECN_50pet_15min 0.0377 0.0426 0.0380 0.0351 0.0293 0.0277 0.0263 0.0283 0.0337 0.0385 0.0337 0.0053 0.0344
122 | ECN_50pet_1_5hr 0.0643 0.0544 0.0908 0.0517 0.1023 0.0431 0.0663 0.0463 0.1026 0.0857 0.0707 0.0217 0.0653
123 | ECN_50pet_lhr 0.0621 0.0542 0.0423 0.0676 0.0579 0.0724 0.0652 0.0567 0.0917 0.0802 0.0650 0.0133 0.0636
| ECN_50pcet_20min 0.0374 0.0369 0.0331 0.0297 0.0269 0.0337 0.0319 0.0272 0.0350 0.0448 0.0337 0.0051 0.0334
| ECN_50pet_25min 0.0351 0.0310 0.0390 0.0371 0.0518 0.0343 0.0423 0.0458 0.0569 0.0498 0.0423 0.0081 0.0407
| ECN_50pet_2hr 0.0594 0.0339 0.0559 0.0448 0.0871 0.0604 0.0782 0.0555 0.0593 0.0690 0.0603 0.0145 0.0593
| ECN_50pet_30min 0.0683 0.0460 0.0428 0.0481 0.0438 0.0454 0.0562 0.0436 0.0510 0.0523 0.0497 0.0074 0.0470
| ECN_50pet_45min 0.0516 0.0502 0.0597 0.0546 0.0518 0.0567 0.0580 0.0684 0.0838 0.0799 0.0615 0.0114 0.0573
*
| CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_SQpct_1_ Shr.
| The median pattern for this ensemble is storm 7 (storm name : ECN_50pct_1_Shr_7).
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_50pct_1_S5hr_9).
*
AEP: 63.2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_63pct_10min 0.0317 0.0334 0.0333 0.0338 0.0289 0.0276 0.0331 0.0298 0.0354 0.0313 0.0318 0.0023 0.0324
ECN_63pcet_15min 0.0334 0.0378 0.0337 0.0311 0.0260 0.0246 0.0233 0.0251 0.0298 0.0341 0.0299 0.0047 0.0305
ECN_63pet_1_Shr 0.0547 0.0397 0.0776 0.0391 0.0878 0.0369 0.0571 0.0341 0.0796 0.0686 0.0575 0.0189 0.0559

ECN_63pet_lhr 0.0382 0.0472 0.0309 0.0522 0.0475 0.0558 0.0561 0.0378 0.0722 0.0634 0.0501 0.0119 0.0499
ECN_63pcet_20min 0.0331 0.0326 0.0293 0.0239 0.0238 0.0298 0.0282 0.0241 0.0298 0.0335 0.0288 0.0036 0.0296
ECN_63pet_25min 0.0237 0.0241 0.0263 0.0252 0.0311 0.0266 0.0223 0.0285 0.0341 0.0309 0.0273 0.0036 0.0265

ECN_63pet_2hr 0.0503 0.0290 0.0481 0.0327 0.0736 0.0517 0.0673 0.0471 0.0469 0.0583 0.0505 0.0130 0.0492
ECN_63pcet_30min 0.0412 0.0254 0.0269 0.0281 0.0271 0.0269 0.0306 0.0285 0.0302 0.0369 0.0302 0.0048 0.0283
ECN_63pcet_45min 0.0369 0.0423 0.0484 0.0352 0.0431 0.0471 0.0417 0.0517 0.0549 0.0594 0.0461 0.0073 0.0451

 

CRITICAL DURATION

The critical duration for the 63.2%

The median pattern for this ensemble is storm 7
The pattern with the greatest <Max Flow> for this ensemble is storm 5 (storm name

(storm name

AEP is the ensemble
ECN_63pct_1_5hr_7).

ECN_63pet_1_5hr.

ECN_63pcet_1_5hr_5).

 

 

Page 60

 1                      INNOVYZE ENSEMBLE STATISTICS UTILITY
 2                          (c) Innovyze 2020
 3
 4   Summary information:
 5
 6       Total No. of Ensembles:     63
 7       No. of Storms per ensemble: 10
 8       No. of AEP Bands:           7
 9       Object Name:                Pre Dev C to Eumundi Noosa Rd
10       Result type:                Max Flow
11
12
13   Results:
14
15
16                   AEP: 1% - Max Flow (m^3/s)
17   *===============================================================================================================================================================================================================*
18   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
19   *===============================================================================================================================================================================================================*
20   |       ECN_1pct_10min      0.0710      0.0763      0.0716      0.0762      0.0803      0.0752      0.0781      0.0700      0.0923      0.0730      0.0764      0.0061      0.0757                              |
21   |       ECN_1pct_15min      0.0885      0.0748      0.0724      0.0682      0.0858      0.0820      0.0697      0.1025      0.0872      0.0677      0.0799      0.0107      0.0784                              |
22   |       ECN_1pct_1_5hr      0.0546      0.0649      0.0632      0.0522      0.0655      0.0622      0.0600      0.0699      0.0575      0.0631      0.0613      0.0051      0.0626                              |
23   |         ECN_1pct_1hr      0.0994      0.0798      0.0584      0.0662      0.0481      0.0751      0.0538      0.0597      0.0653      0.0627      0.0668      0.0140      0.0640                              |
24   |       ECN_1pct_20min      0.0768      0.1071      0.0649      0.0614      0.0687      0.0741      0.0646      0.0705      0.0697      0.0824      0.0740      0.0125      0.0701                              |
25   |       ECN_1pct_25min      0.0689      0.1051      0.0706      0.0774      0.0810      0.0689      0.0684      0.0812      0.0668      0.0882      0.0776      0.0114      0.0740                              |
26   |         ECN_1pct_2hr      0.0708      0.0540      0.0543      0.0636      0.0600      0.0576      0.0432      0.0457      0.0532      0.0730      0.0575      0.0092      0.0559                              |
27   |       ECN_1pct_30min      0.0817      0.0719      0.1014      0.0642      0.0673      0.0930      0.0707      0.0742      0.0813      0.0721      0.0778      0.0112      0.0732                              |
28   |       ECN_1pct_45min      0.1050      0.0962      0.0668      0.0818      0.0722      0.0578      0.0636      0.0838      0.0505      0.0729      0.0751      0.0161      0.0726                              |
29   *===============================================================================================================================================================================================================*
30   | CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_1pct_15min.                                                                                                                      |
31   | The median pattern for this ensemble is storm 6 (storm name : ECN_1pct_15min_6).                                                                                                                              |
32   | The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_1pct_15min_8).                                                                                                        |
33   *===============================================================================================================================================================================================================*
34
35
36                   AEP: 10% - Max Flow (m^3/s)
37   *===============================================================================================================================================================================================================*
38   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
39   *===============================================================================================================================================================================================================*
40   |      ECN_10pct_10min      0.0450      0.0439      0.0480      0.0519      0.0449      0.0421      0.0491      0.0441      0.0437      0.0529      0.0466      0.0035      0.0450                              |
41   |      ECN_10pct_15min      0.0510      0.0500      0.0503      0.0459      0.0447      0.0431      0.0405      0.0412      0.0582      0.0544      0.0479      0.0055      0.0479                              |
42   |      ECN_10pct_1_5hr      0.0557      0.0355      0.0509      0.0381      0.0366      0.0422      0.0379      0.0328      0.0323      0.0454      0.0407      0.0074      0.0380                              |
43   |        ECN_10pct_1hr      0.0611      0.0381      0.0363      0.0524      0.0384      0.0446      0.0422      0.0445      0.0329      0.0668      0.0457      0.0105      0.0434                              |
44   |      ECN_10pct_20min      0.0413      0.0419      0.0413      0.0547      0.0487      0.0476      0.0474      0.0638      0.0634      0.0444      0.0494      0.0081      0.0475                              |
45   |      ECN_10pct_25min      0.0439      0.0691      0.0464      0.0395      0.0469      0.0638      0.0435      0.0429      0.0439      0.0584      0.0498      0.0096      0.0451                              |
46   |        ECN_10pct_2hr      0.0462      0.0308      0.0400      0.0579      0.0439      0.0356      0.0493      0.0318      0.0415      0.0433      0.0420      0.0078      0.0424                              |
47   |      ECN_10pct_30min      0.0369      0.0438      0.0769      0.0435      0.0398      0.0470      0.0610      0.0438      0.0507      0.0573      0.0501      0.0114      0.0454                              |
48   |      ECN_10pct_45min      0.0479      0.0397      0.0458      0.0439      0.0466      0.0436      0.0464      0.0333      0.0618      0.0614      0.0470      0.0083      0.0461                              |
49   *===============================================================================================================================================================================================================*
50   | CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_15min.                                                                                                                    |
51   | The median pattern for this ensemble is storm 2 (storm name : ECN_10pct_15min_2).                                                                                                                             |
52   | The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_10pct_15min_9).                                                                                                       |
53   *===============================================================================================================================================================================================================*
54
55
56                   AEP: 2% - Max Flow (m^3/s)
57   *===============================================================================================================================================================================================================*
58   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
59   *===============================================================================================================================================================================================================*
60   |       ECN_2pct_10min      0.0644      0.0632      0.0640      0.0688      0.0664      0.0679      0.0646      0.0632      0.0757      0.0667      0.0665      0.0036      0.0655                              |
61   |       ECN_2pct_15min      0.0727      0.0678      0.0661      0.0623      0.0741      0.0720      0.0619      0.0886      0.0769      0.0601      0.0703      0.0081      0.0699                              |
62   |       ECN_2pct_1_5hr      0.0462      0.0575      0.0556      0.0462      0.0582      0.0553      0.0526      0.0572      0.0510      0.0561      0.0536      0.0042      0.0555                              |
63   |         ECN_2pct_1hr      0.0884      0.0711      0.0509      0.0590      0.0429      0.0668      0.0480      0.0507      0.0582      0.0510      0.0587      0.0128      0.0546                              |
64   |       ECN_2pct_20min      0.0667      0.0962      0.0583      0.0561      0.0600      0.0647      0.0584      0.0634      0.0608      0.0744      0.0659      0.0113      0.0621                              |
65   |       ECN_2pct_25min      0.0593      0.0947      0.0595      0.0694      0.0666      0.0626      0.0621      0.0736      0.0606      0.0800      0.0688      0.0107      0.0646                              |
66   |         ECN_2pct_2hr      0.0627      0.0464      0.0482      0.0564      0.0534      0.0512      0.0381      0.0406      0.0472      0.0635      0.0508      0.0080      0.0497                              |
67   |       ECN_2pct_30min      0.0738      0.0647      0.0918      0.0581      0.0572      0.0760      0.0641      0.0672      0.0736      0.0648      0.0691      0.0097      0.0660                              |
68   |       ECN_2pct_45min      0.0943      0.0849      0.0598      0.0726      0.0641      0.0509      0.0567      0.0699      0.0455      0.0631      0.0662      0.0141      0.0636                              |
69   *===============================================================================================================================================================================================================*
70   | CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_15min.                                                                                                                      |
71   | The median pattern for this ensemble is storm 6 (storm name : ECN_2pct_15min_6).                                                                                                                              |
72   | The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_2pct_15min_8).                                                                                                        |
73   *===============================================================================================================================================================================================================*
74
75
76                   AEP: 20% - Max Flow (m^3/s)
77   *===============================================================================================================================================================================================================*
78   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
79   *===============================================================================================================================================================================================================*
80   |      ECN_20pct_10min      0.0393      0.0412      0.0412      0.0421      0.0358      0.0351      0.0409      0.0377      0.0438      0.0388      0.0396      0.0026      0.0401                              |
81   |      ECN_20pct_15min      0.0411      0.0464      0.0415      0.0383      0.0320      0.0313      0.0341      0.0363      0.0419      0.0467      0.0390      0.0052      0.0397                              |


[OCR of page images]
INNOVYZE ENSEMBLE STATISTICS UTILITY
(c) Innovyze 2020

 

Summary information:

 

6 Total No. of Ensembles: 63

 

7 No. of Storms per ensemble: 10
8 No. of AEP Bands: 7

9 Object Name: Pre Dev C to Eumundi Noosa Rd
0 Result type: Max Flow

2

13. Results:

 

AEP: 1% - Max Flow (m*3/s)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_lpcet_10min 0.0710 0.0763 0.0716 0.0762 0.0803 0.0752 0.0781 0.0700 0.0923 0.0730 0.0764 0.0061 0.0757
ECN_lpet_15min 0.0885 0.0748 0.0724 0.0682 0.0858 0.0820 0.0697 0.1025 0.0872 0.0677 0.0799 0.0107 0.0784
ECN_lpet_1_Shr 0.0546 0.0649 0.0632 0.0522 0.0655 0.0622 0.0600 0.0699 0.0575 0.0631 0.0613 0.0051 0.0626

ECN_lp¢et_lhr 0.0994 0.0798 0.0584 0.0662 0.0481 0.0751 0.0538 0.0597 0.0653 0.0627 0.0668 0.0140 0.0640

ECN_lpet_20min 0.0768 0.1071 0.0649 0.0614 0.0687 0.0741 0.0646 0.0705 0.0697 0.0824 0.0740 0.0125 0.0701
ECN_lpet_25min 0.0689 0.1051 0.0706 0.0774 0.0810 0.0689 0.0684 0.0812 0.0668 0.0882 0.0776 0.0114 0.0740

ECN_lpcet_2hr 0.0708 0.0540 0.0543 0.0636 0.0600 0.0576 0.0432 0.0457 0.0532 0.0730 0.0575 0.0092 0.0559
ECN_lpet_30min 0.0817 0.0719 0.1014 0.0642 0.0673 0.0930 0.0707 0.0742 0.0813 0.0721 0.0778 0.0112 0.0732
ECN_lpet_45min 0.1050 0.0962 0.0668 0.0818 0.0722 0.0578 0.0636 0.0838 0.0505 0.0729 0.0751 0.0161 0.0726
CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_lpct_15min.
The median pattern for this ensemble is storm 6 (storm name : ECN_1pct_15min_6).
The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_lpct_15min_8).
AEP: 10% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_10pet_10min 0.0450 0.0439 0.0480 0.0519 0.0449 0.0421 0.0491 0.0441 0.0437 0.0529 0.0466 0.0035 0.0450
ECN_10pet_15min 0.0510 0.0500 0.0503 0.0459 0.0447 0.0431 0.0405 0.0412 0.0582 0.0544 0.0479 0.0055 0.0479
ECN_10pet_1_Shr 0.0557 0.0355 0.0509 0.0381 0.0366 0.0422 0.0379 0.0328 0.0323 0.0454 0.0407 0.0074 0.0380

ECN_10pet_1hr 0.0611 0.0381 0.0363 0.0524 0.0384 0.0446 0.0422 0.0445 0.0329 0.0668 0.0457 0.0105 0.0434
ECN_10pet_20min 0.0413 0.0419 0.0413 0.0547 0.0487 0.0476 0.0474 0.0638 0.0634 0.0444 0.0494 0.0081 0.0475
ECN_10pet_25min 0.0439 0.0691 0.0464 0.0395 0.0469 0.0638 0.0435 0.0429 0.0439 0.0584 0.0498 0.0096 0.0451

ECN_10pet_2hr 0.0462 0.0308 0.0400 0.0579 0.0439 0.0356 0.0493 0.0318 0.0415 0.0433 0.0420 0.0078 0.0424
ECN_10pet_30min 0.0369 0.0438 0.0769 0.0435 0.0398 0.0470 0.0610 0.0438 0.0507 0.0573 0.0501 0.0114 0.0454
ECN_10pet_45min 0.0479 0.0397 0.0458 0.0439 0.0466 0.0436 0.0464 0.0333 0.0618 0.0614 0.0470 0.0083 0.0461

CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_15min.

The median pattern for this ensemble is storm 2 (storm name : ECN_10pct_15min_2).

The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_10pct_15min_9).
AEP: 2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_2pet_10min 0.0644 0.0632 0.0640 0.0688 0.0664 0.0679 0.0646 0.0632 0.0757 0.0667 0.0665 0.0036 0.0655
ECN_2pet_15min 0.0727 0.0678 0.0661 0.0623 0.0741 0.0720 0.0619 0.0886 0.0769 0.0601 0.0703 0.0081 0.0699
ECN_2pet_1_Shr 0.0462 0.0575 0.0556 0.0462 0.0582 0.0553 0.0526 0.0572 0.0510 0.0561 0.0536 0.0042 0.0555

ECN_2pet_lhr 0.0884 0.0711 0.0509 0.0590 0.0429 0.0668 0.0480 0.0507 0.0582 0.0510 0.0587 0.0128 0.0546

ECN_2pet_20min 0.0667 0.0962 0.0583 0.0561 0.0600 0.0647 0.0584 0.0634 0.0608 0.0744 0.0659 0.0113 0.0621

ECN_2pet_25min 0.0593 0.0947 0.0595 0.0694 0.0666 0.0626 0.0621 0.0736 0.0606 0.0800 0.0688 0.0107 0.0646
ECN_2pcet_2hr 0.0627 0.0464 0.0482 0.0564 0.0534 0.0512 0.0381 0.0406 0.0472 0.0635 0.0508 0.0080 0.0497
ECN_2pet_30min 0.0738 0.0647 0.0918 0.0581 0.0572 0.0760 0.0641 0.0672 0.0736 0.0648 0.0691 0.0097 0.0660
ECN_2pet_45min 0.0943 0.0849 0.0598 0.0726 0.0641 0.0509 0.0567 0.0699 0.0455 0.0631 0.0662 0.0141 0.0636
CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_15min.
The median pattern for this ensemble is storm 6 (storm name : ECN_2pct_15min_6).
The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_2pct_15min_8).
AEP: 20% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_20pet_10min 0.0393 0.0412 0.0412 0.0421 0.0358 0.0351 0.0409 0.0377 0.0438 0.0388 0.0396 0.0026 0.0401
ECN_20pet_15min 0.0411 0.0464 0.0415 0.0383 0.0320 0.0313 0.0341 0.0363 0.0419 0.0467 0.0390 0.0052 0.0397

Page 61

 82   |      ECN_20pct_1_5hr      0.0321      0.0466      0.0410      0.0269      0.0462      0.0237      0.0297      0.0347      0.0496      0.0383      0.0369      0.0084      0.0365                              |
 83   |        ECN_20pct_1hr      0.0463      0.0253      0.0299      0.0345      0.0461      0.0433      0.0299      0.0295      0.0475      0.0377      0.0370      0.0079      0.0361                              |
 84   |      ECN_20pct_20min      0.0408      0.0402      0.0362      0.0351      0.0299      0.0368      0.0397      0.0319      0.0392      0.0544      0.0384      0.0063      0.0380                              |
 85   |      ECN_20pct_25min      0.0298      0.0320      0.0328      0.0317      0.0471      0.0331      0.0376      0.0416      0.0534      0.0458      0.0385      0.0077      0.0353                              |
 86   |        ECN_20pct_2hr      0.0299      0.0322      0.0275      0.0301      0.0381      0.0292      0.0480      0.0505      0.0284      0.0295      0.0343      0.0080      0.0300                              |
 87   |      ECN_20pct_30min      0.0584      0.0294      0.0334      0.0386      0.0379      0.0344      0.0470      0.0437      0.0431      0.0427      0.0408      0.0078      0.0406                              |
 88   |      ECN_20pct_45min      0.0395      0.0300      0.0269      0.0357      0.0418      0.0289      0.0291      0.0357      0.0471      0.0483      0.0363      0.0073      0.0357                              |
 89   *===============================================================================================================================================================================================================*
 90   | CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_30min.                                                                                                                    |
 91   | The median pattern for this ensemble is storm 10 (storm name : ECN_20pct_30min_10).                                                                                                                           |
 92   | The pattern with the greatest <Max Flow> for this ensemble is storm 1 (storm name : ECN_20pct_30min_1).                                                                                                       |
 93   *===============================================================================================================================================================================================================*
 94
 95
 96                   AEP: 5% - Max Flow (m^3/s)
 97   *===============================================================================================================================================================================================================*
 98   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
 99   *===============================================================================================================================================================================================================*
100   |       ECN_5pct_10min      0.0510      0.0498      0.0544      0.0589      0.0555      0.0511      0.0610      0.0546      0.0496      0.0659      0.0552      0.0051      0.0545                              |
101   |       ECN_5pct_15min      0.0576      0.0566      0.0568      0.0573      0.0585      0.0521      0.0494      0.0518      0.0730      0.0682      0.0581      0.0069      0.0571                              |
102   |       ECN_5pct_1_5hr      0.0648      0.0414      0.0592      0.0457      0.0425      0.0490      0.0442      0.0379      0.0376      0.0528      0.0475      0.0086      0.0449                              |
103   |         ECN_5pct_1hr      0.0708      0.0481      0.0418      0.0602      0.0495      0.0534      0.0514      0.0524      0.0417      0.0774      0.0547      0.0111      0.0519                              |
104   |       ECN_5pct_20min      0.0510      0.0475      0.0507      0.0653      0.0602      0.0560      0.0555      0.0769      0.0797      0.0517      0.0595      0.0106      0.0558                              |
105   |       ECN_5pct_25min      0.0529      0.0808      0.0526      0.0448      0.0532      0.0767      0.0514      0.0517      0.0561      0.0682      0.0588      0.0114      0.0531                              |
106   |         ECN_5pct_2hr      0.0543      0.0362      0.0470      0.0681      0.0518      0.0423      0.0579      0.0374      0.0487      0.0564      0.0500      0.0093      0.0502                              |
107   |       ECN_5pct_30min      0.0419      0.0556      0.0891      0.0497      0.0456      0.0590      0.0739      0.0566      0.0609      0.0657      0.0598      0.0132      0.0578                              |
108   |       ECN_5pct_45min      0.0566      0.0485      0.0612      0.0506      0.0538      0.0501      0.0535      0.0385      0.0715      0.0709      0.0555      0.0096      0.0537                              |
109   *===============================================================================================================================================================================================================*
110   | CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_5pct_30min.                                                                                                                      |
111   | The median pattern for this ensemble is storm 6 (storm name : ECN_5pct_30min_6).                                                                                                                              |
112   | The pattern with the greatest <Max Flow> for this ensemble is storm 3 (storm name : ECN_5pct_30min_3).                                                                                                        |
113   *===============================================================================================================================================================================================================*
114
115
116                   AEP: 50% - Max Flow (m^3/s)
117   *===============================================================================================================================================================================================================*
118   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
119   *===============================================================================================================================================================================================================*
120   |      ECN_50pct_10min      0.0293      0.0308      0.0308      0.0314      0.0267      0.0258      0.0306      0.0278      0.0327      0.0290      0.0295      0.0021      0.0300                              |
121   |      ECN_50pct_15min      0.0307      0.0347      0.0310      0.0286      0.0239      0.0230      0.0216      0.0231      0.0279      0.0319      0.0276      0.0043      0.0283                              |
122   |      ECN_50pct_1_5hr      0.0225      0.0259      0.0291      0.0166      0.0327      0.0171      0.0210      0.0182      0.0333      0.0265      0.0243      0.0059      0.0242                              |
123   |        ECN_50pct_1hr      0.0265      0.0165      0.0195      0.0216      0.0261      0.0246      0.0207      0.0203      0.0331      0.0247      0.0233      0.0044      0.0231                              |
124   |      ECN_50pct_20min      0.0305      0.0300      0.0270      0.0221      0.0221      0.0274      0.0265      0.0223      0.0278      0.0314      0.0267      0.0033      0.0272                              |
125   |      ECN_50pct_25min      0.0219      0.0223      0.0244      0.0234      0.0286      0.0246      0.0222      0.0239      0.0316      0.0265      0.0249      0.0030      0.0241                              |
126   |        ECN_50pct_2hr      0.0208      0.0184      0.0194      0.0168      0.0261      0.0204      0.0273      0.0362      0.0195      0.0208      0.0226      0.0055      0.0206                              |
127   |      ECN_50pct_30min      0.0342      0.0214      0.0247      0.0248      0.0202      0.0243      0.0278      0.0266      0.0235      0.0238      0.0251      0.0037      0.0245                              |
128   |      ECN_50pct_45min      0.0290      0.0208      0.0193      0.0224      0.0274      0.0179      0.0190      0.0248      0.0316      0.0296      0.0242      0.0047      0.0236                              |
129   *===============================================================================================================================================================================================================*
130   | CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_50pct_10min.                                                                                                                    |
131   | The median pattern for this ensemble is storm 7 (storm name : ECN_50pct_10min_7).                                                                                                                             |
132   | The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_50pct_10min_9).                                                                                                       |
133   *===============================================================================================================================================================================================================*
134
135
136                   AEP: 63.2% - Max Flow (m^3/s)
137   *===============================================================================================================================================================================================================*
138   |        Ensemble name     Storm 1     Storm 2     Storm 3     Storm 4     Storm 5     Storm 6     Storm 7     Storm 8     Storm 9    Storm 10     Average   Std. Dev.      Median                              |
139   *===============================================================================================================================================================================================================*
140   |      ECN_63pct_10min      0.0259      0.0272      0.0272      0.0277      0.0236      0.0227      0.0270      0.0245      0.0289      0.0255      0.0260      0.0019      0.0264                              |
141   |      ECN_63pct_15min      0.0272      0.0308      0.0275      0.0254      0.0212      0.0203      0.0191      0.0205      0.0247      0.0282      0.0245      0.0038      0.0250                              |
142   |      ECN_63pct_1_5hr      0.0195      0.0197      0.0253      0.0136      0.0284      0.0150      0.0182      0.0141      0.0264      0.0224      0.0203      0.0050      0.0196                              |
143   |        ECN_63pct_1hr      0.0229      0.0145      0.0171      0.0184      0.0205      0.0199      0.0179      0.0155      0.0262      0.0212      0.0194      0.0033      0.0191                              |
144   |      ECN_63pct_20min      0.0270      0.0266      0.0239      0.0195      0.0195      0.0243      0.0234      0.0197      0.0246      0.0276      0.0236      0.0029      0.0241                              |
145   |      ECN_63pct_25min      0.0194      0.0197      0.0216      0.0208      0.0235      0.0218      0.0185      0.0185      0.0244      0.0235      0.0212      0.0020      0.0212                              |
146   |        ECN_63pct_2hr      0.0180      0.0161      0.0169      0.0123      0.0226      0.0176      0.0237      0.0317      0.0160      0.0180      0.0193      0.0052      0.0178                              |
147   |      ECN_63pct_30min      0.0260      0.0189      0.0219      0.0219      0.0163      0.0215      0.0240      0.0235      0.0183      0.0205      0.0213      0.0028      0.0217                              |
148   |      ECN_63pct_45min      0.0256      0.0183      0.0166      0.0198      0.0243      0.0156      0.0150      0.0190      0.0244      0.0234      0.0202      0.0037      0.0194                              |
149   *===============================================================================================================================================================================================================*
150   | CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_10min.                                                                                                                  |
151   | The median pattern for this ensemble is storm 7 (storm name : ECN_63pct_10min_7).                                                                                                                             |
152   | The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_63pct_10min_9).                                                                                                       |
153   *===============================================================================================================================================================================================================*
154


[OCR of page images]
 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

82 | ECN_20pet_1_Shr 0.0321 0.0466 0.0410 0.0269 0.0462 0.0237 0.0297 0.0347 0.0496 0.0383 0.0369 0.0084 0.0365
| ECN_20pet_lhr 0.0463 0.0253 0.0299 0.0345 0.0461 0.0433 0.0299 0.0295 0.0475 0.0377 0.0370 0.0079 0.0361
| ECN_20pet_20min 0.0408 0.0402 0.0362 0.0351 0.0299 0.0368 0.0397 0.0319 0.0392 0.0544 0.0384 0.0063 0.0380
| ECN_20pet_25min 0.0298 0.0320 0.0328 0.0317 0.0471 0.0331 0.0376 0.0416 0.0534 0.0458 0.0385 0.0077 0.0353
| ECN_20pet_2hr 0.0299 0.0322 0.0275 0.0301 0.0381 0.0292 0.0480 0.0505 0.0284 0.0295 0.0343 0.0080 0.0300
| ECN_20pet_30min 0.0584 0.0294 0.0334 0.0386 0.0379 0.0344 0.0470 0.0437 0.0431 0.0427 0.0408 0.0078 0.0406
| ECN_20pet_45min 0.0395 0.0300 0.0269 0.0357 0.0418 0.0289 0.0291 0.0357 0.0471 0.0483 0.0363 0.0073 0.0357
*
| CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_30min.
| The median pattern for this ensemble is storm 10 (storm name : ECN_20pct_30min_10).
| The pattern with the greatest <Max Flow> for this ensemble is storm 1 (storm name : ECN_20pct_30min_1).

*
AEP: 5% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median

ECN_5pet_10min 0.0510 0.0498 0.0544 0.0589 0.0555 0.0511 0.0610 0.0546 0.0496 0.0659 0.0552 0.0051 0.0545

ECN_5pet_15min 0.0576 0.0566 0.0568 0.0573 0.0585 0.0521 0.0494 0.0518 0.0730 0.0682 0.0581 0.0069 0.0571

ECN_5pet_1_5hr 0.0648 0.0414 0.0592 0.0457 0.0425 0.0490 0.0442 0.0379 0.0376 0.0528 0.0475 0.0086 0.0449

ECN_5pet_lhr 0.0708 0.0481 0.0418 0.0602 0.0495 0.0534 0.0514 0.0524 0.0417 0.0774 0.0547 0.0111 0.0519

ECN_5pet_20min 0.0510 0.0475 0.0507 0.0653 0.0602 0.0560 0.0555 0.0769 0.0797 0.0517 0.0595 0.0106 0.0558

ECN_5pet_25min 0.0529 0.0808 0.0526 0.0448 0.0532 0.0767 0.0514 0.0517 0.0561 0.0682 0.0588 0.0114 0.0531

ECN_5pcet_2hr 0.0543 0.0362 0.0470 0.0681 0.0518 0.0423 0.0579 0.0374 0.0487 0.0564 0.0500 0.0093 0.0502
ECN_5pet_30min 0.0419 0.0556 0.0891 0.0497 0.0456 0.0590 0.0739 0.0566 0.0609 0.0657 0.0598 0.0132 0.0578
ECN_5pet_45min 0.0566 0.0485 0.0612 0.0506 0.0538 0.0501 0.0535 0.0385 0.0715 0.0709 0.0555 0.0096 0.0537
CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_5pct_30min.
The median pattern for this ensemble is storm 6 (storm name : ECN_Spct_30min_6).
The pattern with the greatest <Max Flow> for this ensemble is storm 3 (storm name : ECN_Spct_30min_3).
AEP: 50% - Max Flow (m*3/s)
*
lig | Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
19
120, | ECN_S0pet_10min 0.0293 0.0308 0.0308 0.0314 0.0267 0.0258 0.0306 0.0278 0.0327 0.0290 0.0295 0.0021 0.0300
121 | ECN_50pet_15min 0.0307 0.0347 0.0310 0.0286 0.0239 0.0230 0.0216 0.0231 0.0279 0.0319 0.0276 0.0043 0.0283
122 | ECN_50pet_1_5hr 0.0225 0.0259 0.0291 0.0166 0.0327 0.0171 0.0210 0.0182 0.0333 0.0265 0.0243 0.0059 0.0242
123 | ECN_50pet_lhr 0.0265 0.0165 0.0195 0.0216 0.0261 0.0246 0.0207 0.0203 0.0331 0.0247 0.0233 0.0044 0.0231
| ECN_50pcet_20min 0.0305 0.0300 0.0270 0.0221 0.0221 0.0274 0.0265 0.0223 0.0278 0.0314 0.0267 0.0033 0.0272
| ECN_50pet_25min 0.0219 0.0223 0.0244 0.0234 0.0286 0.0246 0.0222 0.0239 0.0316 0.0265 0.0249 0.0030 0.0241
| ECN_50pet_2hr 0.0208 0.0184 0.0194 0.0168 0.0261 0.0204 0.0273 0.0362 0.0195 0.0208 0.0226 0.0055 0.0206
| ECN_50pet_30min 0.0342 0.0214 0.0247 0.0248 0.0202 0.0243 0.0278 0.0266 0.0235 0.0238 0.0251 0.0037 0.0245
| ECN_50pet_45min 0.0290 0.0208 0.0193 0.0224 0.0274 0.0179 0.0190 0.0248 0.0316 0.0296 0.0242 0.0047 0.0236
*
| CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_SQpct_10min.
| The median pattern for this ensemble is storm 7 (storm name : ECN_SOpct_10min_7).
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_50pct_10min_9).
*
REP: 63.2% - Max Flow (m*3/s)

Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median
ECN_63pct_10min 0.0259 0.0272 0.0272 0.0277 0.0236 0.0227 0.0270 0.0245 0.0289 0.0255 0.0260 0.0019 0.0264
ECN_63pcet_15min 0.0272 0.0308 0.0275 0.0254 0.0212 0.0203 0.0191 0.0205 0.0247 0.0282 0.0245 0.0038 0.0250
ECN_63pet_1_Shr 0.0195 0.0197 0.0253 0.0136 0.0284 0.0150 0.0182 0.0141 0.0264 0.0224 0.0203 0.0050 0.0196

ECN_63pet_lhr 0.0229 0.0145 0.0171 0.0184 0.0205 0.0199 0.0179 0.0155 0.0262 0.0212 0.0194 0.0033 0.0191
ECN_63pcet_20min 0.0270 0.0266 0.0239 0.0195 0.0195 0.0243 0.0234 0.0197 0.0246 0.0276 0.0236 0.0029 0.0241
ECN_63pet_25min 0.0194 0.0197 0.0216 0.0208 0.0235 0.0218 0.0185 0.0185 0.0244 0.0235 0.0212 0.0020 0.0212

ECN_63pet_2hr 0.0180 0.0161 0.0169 0.0123 0.0226 0.0176 0.0237 0.0317 0.0160 0.0180 0.0193 0.0052 0.0178
ECN_63pcet_30min 0.0260 0.0189 0.0219 0.0219 0.0163 0.0215 0.0240 0.0235 0.0183 0.0205 0.0213 0.0028 0.0217
ECN_63pcet_45min 0.0256 0.0183 0.0166 0.0198 0.0243 0.0156 0.0150 0.0190 0.0244 0.0234 0.0202 0.0037 0.0194

 

CRITICAL DURATION

The critical duration for the 63.2%

The median pattern for this ensemble is storm 7
The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name

(storm name

AEP is the ensemble
ECN_63pct_10min_7).

ECN_63pet_10min.

ECN_63pct_10min_9).

 

 

Page 62

                                                                                 20169 - SBSMP/4
                                                                                          Page 31




                                             APPENDIX I


                      XPSTORM POST DEVELOPMENT RESULTS




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville

The text continues on page 63.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.