Skip to the record
The only place to find full transcripts.

Original source · versioned page text

RFI - Stormwater Mgm Plan 20169 - SBSMP - Rev 4 (2)

of 92

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                             20169 - SBSMP/4
                                                                                                          Page 2




                                           Table of Contents
1     INTRODUCTION ............................................................................................ 3
2     EXISTING SITE CONDITIONS .............................................................................. 4
  2.1    The Site ................................................................................................ 4
  2.2    Surrounding Area ...................................................................................... 4
3     PROPOSED DEVELOPMENT ............................................................................... 5
4     EXISTING DRAINAGE PATTERNS ......................................................................... 6
  4.1    Existing Infrastructure ............................................................................... 6
  4.2    Existing Drainage Patterns ........................................................................... 7
  4.3    Lawful Point of Discharge............................................................................ 7
5     STORMWATER QUANTITY................................................................................. 9
  5.1    Rational Method Assessment ........................................................................ 9
    5.1.1     Design Storms ....................................................................................9
    5.1.2     Rainfall Intensity ................................................................................9
    5.1.3     Times of Concentration .........................................................................9
    5.1.4     Runoff Coefficients ..............................................................................9
    5.1.5     Peak Flows ...................................................................................... 10
  5.2    Proposed Drainage Patterns ....................................................................... 10
  5.3    Downstream Pipe Infrastructure Considerations ............................................... 11
  5.4    XPSTORM Modelling ................................................................................. 11
    5.4.1     Intensity Frequency Distribution ............................................................ 11
    5.4.2     Initial and Continuing Losses ................................................................. 11
    5.4.3     On-site Detention .............................................................................. 12
    5.4.4     Comparison of Peak Flows at Lawful Point of Discharge ................................. 12
    5.4.5     Sensitivity Analysis for 1% AEP Storm Event at end of Planning Period 2100 ......... 13
6     STORMWATER QUALITY ................................................................................ 15
  6.1    State Planning Policy Assessment ................................................................ 15
  6.2    Construction Phase ................................................................................. 15
  6.3    Operational Phase .................................................................................. 17
    6.3.1     Sources of Contaminants ..................................................................... 17
    6.3.2     Proposed Treatment Train ................................................................... 18
    6.3.3     Pollutant Export Modelling ................................................................... 18
    6.3.4     MUSIC Modelling Parameters ................................................................. 19
    6.3.5     MUSIC Modeling Results ....................................................................... 19
7     FLOODING ................................................................................................ 21
8     CONCLUSION ............................................................................................. 22
Appendix A DETAILED SITE SURVEY PLAN ................................................................. 23
Appendix B PROPOSED DEVELOPMENT PLANS ............................................................ 24
Appendix C NOOSA COUNCIL INTERACTIVE MAPPING DATA ............................................ 25
Appendix D NSC WATER QUALITY AND DRAINAGE CODE ................................................ 26
Appendix E STORMWATER QUANTITY CALCULATIONS................................................... 27
Appendix F CONCEPT SITE LEVELS AND DRAINAGE PLAN ............................................... 28
Appendix G BOM IFD DATA .................................................................................. 29
Appendix H XPSTORM PRE DEVELOPMENT RESULTS ..................................................... 30
Appendix I XPSTORM POST DEVELOPMENT RESULTS .................................................... 31
Appendix J XPSTORM POST DEVELOPMENT MITIGATED RESULTS ...................................... 32
Appendix K STORMWATER QUALITY AND MAINTENANCE GUIDELINES ................................. 33
Appendix L NSC FLOOD HAZARD OVERLAY MAP .......................................................... 34




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville
Log in to download the original file

RFI - Stormwater Mgm Plan 20169 - SBSMP - Rev 4 (2).pdf · 14.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.