Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

RFI - Stormwater Mgm Plan 20169 - SBSMP - Rev 4 (2)

of 92

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                 20169 - SBSMP/4
                                                                                          Page 3




1 INTRODUCTION
This Site Based Stormwater Management Plan (SBSMP) has been prepared for the proposed
Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville.

This SBSMP has been prepared to investigate the effects the development will have on stormwater
quantity and quality.

The objective of this SBSMP is to ensure that there is no adverse impact by the development on
the environmental value of the receiving waters during the construction and operational phases
of the development. This SBSMP will also provide recommendations to ensure that the post-
development peak outflow conditions are not greater than the pre-development peak outflow
conditions.

In order to achieve this objective, this SBSMP:

    1. Describes the environmental setting of the development site and precinct;
    2. Describes the nature of the proposed development as it relates to stormwater quality;
    3. Calculates the peak flows for both pre and post-development conditions;
    4. Calculates the detention volume required to achieve the pre-development outflow in the
       post-development state; and
    5. Identifies potential sources of contaminants and describes the management techniques
       designed to be employed on the site to achieve the water quality objectives.


The proposed development has been assessed against the following guidelines and planning
documents:


    1. State Planning Policy 2017 (SPP 2017);
    2. Urban Stormwater Quality Planning Guidelines 2010;
    3. The Queensland Urban Drainage Manual (QUDM); and
    4. The Noosa Council Planning Scheme.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 99, 101 & 105 Eumundi Noosa Road, Noosaville
Log in to download the original file

RFI - Stormwater Mgm Plan 20169 - SBSMP - Rev 4 (2).pdf · 14.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.