11. Car parking shall be provided within the site as shown on drawing number 0089-SK02-P2
(Rev 1) dated November 2002, prepared by Greg Gibbs Architects, except as modified
herein.
12. A minimum of 52 uncovered car park spaces and 20 car park spaces shall be provided on
site, including 1 clearly defined disabled car park space.
13. The carparking area shall be designed to comply with the provisions of AS 2890.1-1993 for
user class 3 and the minimum head clearance (headroom) at any point shall be 2.3m.
14. The proposed turning area at the end of the aisle that serves proposed carpark spaces C25
to C44 shall be line-marked with chevrons and have the words “No Parking” painted on the
pavement. A sign shall also be provided to indicate that the area is a “Turning Area Only”
and that “No Parking is Permitted”.
15. All staff carpark spaces shall be clearly defined by line marking each space with the words
“Staff Parking Only” and by sign posting each space with a similar wording.
Roadworks Contributions
16. A roadworks contribution of $14,377 towards the upgrading of Elizabeth Street shall be paid
to the Council prior to obtaining a Development Permit for Operational Works. This amount
will be subject to variations in the Consumer Price Index, All Groups Brisbane from March
2001 until the date of payment. The money will be used to assist Council with the cost of
intersection improvements at Elizabeth / James Street and the addition of traffic calming
devises along Elizabeth Street.
Frontage Works
17. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
Elizabeth Street frontage of the site in accordance with Planning Scheme policy PSP1
Landscaping Guidelines. Grass shall be couch, free of weeds.
18. A new 1.2 metre wide concrete path shall be constructed across the Elizabeth Street frontage
of the site in accordance with Council’s design standards. Care shall be taken to protect any
significant vegetation or any underground services.
19. A new full width concrete or paved path shall be constructed across the Gympie Terrace
frontage of the site in accordance with Council’s design standards. Care shall be taken to
protect any underground services. Paving details shall match in with Noosaville Foreshore
Conceptual Design.
20. The paths shall be designed and constructed to ensure pedestrian safety using non-slip
materials and to produce an evenly graded surface finish.
21. All redundant vehicular crossings to the site shall be removed and replaced by kerb &
channel and footpath paving in accordance with Council’s Standard specifications prior to
commencement of the use permitted by this permit.
Stormwater Drainage
22. All stormwater drainage shall be collected on site and discharged to Council’s existing
drainage structures in both Gympie Terrace and Elizabeth Street. In this regard, plans shall
be prepared by a Registered Professional Civil Engineer and submitted to Council prior to
obtaining a Development Permit for Operational Works.
23. Stormwater drainage from Lot 24 on RP 839111 (the adjoining unit development to the east,
known as Miriwinni Mews), shall be maintained through the proposed development site.
Though the existing stormwater drainage alignment may be changed to suit the proposed
development - it will be necessary that plans of this work be prepared by a Registered
Professional Civil Engineer and submitted to Council prior to obtaining a Development Permit
for Operational Works.
Page 3 of 11
Document Set ID: 22457179
Version: 4, Version Date: 13/06/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Minor Change - 132001 210011 4 - [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 181 KB (small file)
- File type
No other editions are linked here.