Original source · versioned page text
Attachment D amended SWMP
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
Appendices
Appendix A - Partial Detailed Survey and Council Online Mapping..............................21
Appendix B - Proposed Development Plans ................................................................22
Appendix C - Preliminary Stormwater Layout Sketch...................................................23
Appendix D - Catchment Plan .....................................................................................24
Appendix E - Water Quality and Drainage Code ..........................................................25
List of Figures
Figure 1 - Site Location .................................................................................................6
Figure 2 – MUSIC Model Layout (Bio-Retention) .........................................................15
List of Tables
Table 1 - ILSAX Hydrological Model Parameters ...........................................................8
Table 2 –Pre-Development Parameters.........................................................................8
Table 3 - Comparison of Pre- and Post-Development Peak Flow Rates ........................9
Table 4 - Comparison of Pre- and Post-Development Design Flow Rates .....................9
Table 5 – Detention Basin Details................................................................................10
Table 6- Comparison of Pre- and Post-Development (Mitigated) Peak Flow Rates .....11
Table 7 - Comparison of Pre- and Post-Development (Mitigated) Peak Flow Rates
(Climate Change)...........................................................................................11
Table 8 - Monthly Evapotranspiration ..........................................................................13
Table 9 - Music Source Parameters ............................................................................14
Table 10 – Commercial Source Node MUSIC Input Parameters .................................14
Table 11 - MUSIC Model Catchments .........................................................................15
Table 12 - Rainwater Tanks.........................................................................................15
Table 13 - Bio-Retention Details ..................................................................................16
Table 14 - Treatment Train Effectiveness Result .........................................................16
BR210522_SBSMP_Rev5.docx Page 4 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.